<IEket Fil DEC 7 1981 NRC PDR L PDR NSIC
. TERA Docket No. 50-336 ORB #3 Rdg
- - S,'N DEisenhut 9
~'. x 0 ELD Coh I&E-3
/js Vf
[
4.V,f-[p; Nuclear Engineering & Operations PMKreutzer-3
' C Mr. W. G. Counsil. Vice President ACRS-10 o
j g%Q%k
[
Econner og Northeast Nuclear Energy Company P. O. Box 270 RAClark s
4-Hartford, Connecticut 06101 Gray File JHeltemes E #U N Dear Mr. Counsil-By letter dated November 17, 1981, you provided information in regards to your planned Cycle 4 coastdown of Millstone, Unit No. 2 beginning in early December, 1981. You state that Technical Specification (TS)
Figure 3.2-1 may not afford appropriate restrictions, that you will have performed specific analysis of the coastdown including the limiting large break LOCA analysis, and that based on the results of this specific analysis you will administratively maintain the linear heat generation rate more restrictive than the TS limit.
This proposed mode of operation during the coastdown period has been discussed with members of your staff, the Core Performance Branch and with the assigned NRC Resident Inspector (RI) at Millstone. We conclude that the proposed mode of operation is acceptable for the short coastdown period. However, we believe the reference TS Figure 3.2-1 should be changed to clearly identify the more restrictive LHGR limit applicable during coastdown or possibly other times when the inlet temperature is reduced below the normal value. Since you indicate that such an analysis has been completed for the Cycle 4 coastdown, we recommend including a proposed change to the referenced TS and its basis for reduced inlet temperature operation. Such a change could be submitted with the Cycle 5 changes.
Sincerely, a.L L:y.
Robert /t Clas Robert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing cc: See next page 8201140033 811207 PDR ADOCK 05000336 P
..y.n.,,,,,,,,,,
yp suauc=e >..,..............E..
3,,,,,,,,,,,,,,,,,,,,
DOTE >
l enc ronu m oo so3 Nacu o24o OFFICIAL RECORD COPY usam,wi_mm
Northeast Nuclear' Energy Company
~
CC:
a William H. Cuddy, Esquire Mr. John Shedlosky' Day, Berry & Howard Resident Inspector / Millstone Counselors at Law c/o U.S.N.R.C.
One Constitution Plaza P. 0.~ Drawer KK Hartford, Connecticut 06103 Niantic, CT 06357 Mr. Charles Brinkman '
~
Manager - Washington Nuclear Operations C-E Power Systems Combustion Engineering, Inc.
4853 Cordell Aven., Suite A-1
' Bethesda, MD 20014 Mr. Lawrence Bettencourt, First Selectman Town of Waterford Hall of Records - 200 Boston Post Road Waterford, Connecticut 06385
~
Northeast Nuclear Energy Company
~-
ATTN:
Superintendent l
Millstone Plant Connecticut Energy Agency Post Office Box 128 AT5N:
Assistant Director, Research Waterford, Connecticut 06385 and Policy Development Departnent of Pla.1ning and Energy Waterford Public Library Policy Rope Ferry Road, Route 156 20 Grand Street Waterford, Connecticut 0.6385 Hartford,- CT 06106 U. S. Environmental Protection Agnecy Region I Office ATTN:
Regional Radiation Representative John,F. Kennedy Federal Building Boston, Massachusetts 02203 Northeast ' Utilities Service Company ATTN: Mr. Richard T. Laudenat, Manager Generation Facilities Licensing P. O. Box 270 Hartford, Connecticut 06101
~
O ee e g