. _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Docket Nos. 50-528/529/530 4
yg
'50 55(e) Report ATEMI!MA IFJUTWLU GiaHWJULn3 @NHIRAWW STA.
P.O. BOX 21666 PHOENIX. ARIZON A 85036 December 23, 1981 ANPP-19769-CHD/BSK h
A U. S. Nuclear Regulatory Commission p
Region V
$5CENg 3
Creekside Oaks Office Park 1450 Maria Lane - Suite 210 D
JDN 1,1gg g p.,g Walnut Creek, California 94596-5368
--s 8 8'"'"
Attention:
Mr. B. H. Faulkenberry, Chief E
g
- a tt Reactor Construction and
')
yg' j f-
'o Engineering Support Branch
Subject:
Interim Report - DER 81-44 A 50.55(e) Potentially Reportable Deficiency Relating to Fisher Pressure-Regulating Valves Supplied by Combustion Engineering Do Not Meet Design Pressure Requirement on Downstream Side File:
81-019-026 D.4.33.2
Reference:
Telephone Conversation between J. Eckhardt and C. Duckworth on November 23, 1981
Dear Sir:
The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.
Due to the extensive investigation and evaluation required, an Interim Report is attached.
It is now expected that this infor-mation will be finalized by March 4,1982, at which time a complete report will be submitted.
l Very truly yours, k
E. E. Van Brunt, Jr.
'j APS Vice President a
Nuclear Projects;j g
ANPP Project Director w e
,m EEVBJr/GHD:skc
-g m
Attachment g
cc: See Attached Page 2 u
~
8201130227 81'1223' l.
S 05000528:
b
-PDR ADOCK PDR L
6l 'vM
d U. S. Nuclsir Rsgulatory Commiccion Attention:
Mr. B. H. Faulkenberry, Chief ANPP-1976f-CHD/BSK December 23, 1981 Page 2 cc:
Victor Stello, Jr., Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Washington, D. C.
20555 J. A. Roedel D. B. Fasnacht G. C. Andognini F. W. Hartley J. M. Allen
~
A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen Ms. Patricia Lee Hourihan 6413 South 26th Street Phoenix, Arizona 85040
sy
PVNGS. UNITS 1, 2 AND 3 I.
Potential Problem The downstream side of Fisher pressure regulating valves CH-484 and CH-831 cannot meet the design pressure require-ment of Combustion Engineering Specification.14273-PE-706.
These valves have a maximum downstream pressure rating of 30 PSIG, whereas the specification requires a design pressure of 60 PSIG.
This condition, if left uncorrected, could damage the valves creating a potential safety hazard.
II.
Approach To and Status Of Proposed Resolutions-Bechtel has requested assistance from Combustion Engineering in' evaluating and dispositioning this item.
III.
Projected Completion of Corrective Action and Submittal of the Final Report The evaluation and final report are forecast to be completed by March 4, 1982.-
m-mm
~.
m
.