ML20039F578
| ML20039F578 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 01/06/1982 |
| From: | Jackson E VERMONT YANKEE NUCLEAR POWER CORP. |
| To: | Haynes R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| REF-SSINS-6820 FVY-82-2, IEB-80-13, NUDOCS 8201130117 | |
| Download: ML20039F578 (1) | |
Text
_
VERMONT YAN KEE NUCLEAR POWER CORPORATION SEVENTY SEVEN GROVE STREET 2.C.2.1 RUTLAND. VERMOKr - 05701 FVY 82-2 REPLY TO s ENGINEERING OFFICE 1671 WORCESTER ROAD FRAMINGH AM. M ASSACH USETTS O1701 TELEPHONE 617 072-O'00 January 6, 1982 U.S. Nuclear Regulatory Commission Office of Inspection & Enforcement Region I 631 Park Avenue King of Prussia, PA 19406 Attention:
Mr. Ronald C. Haynes Regional Administrator
References:
a)
License No. DPR-28 -(Docket No. 50-271) b)
Letter, USNRC to VYNPC, 5/12/80, IE Bulletin 80-13
" Cracking in Core Spray Spargers" c)
Letter, VYNPC to USNRC, 12/1/80, "Results of Core Spray Sparger Inspection," WVY 80-164
Dear Sir:
Subj ect:
Results of 1981 Core Spray Sparger Inspection In accordance with the requirements of IE Bulletin 80-13, a remote undcrwater TV inspection of the core spray spargers and the segicent of piping between the inlet nozzle and the vessel shroud was performed. No indications of cracking were noted during the examination. Additionally, the clamp installed on core spray sparger junction box "c" was also examined. The clamp appeared intact and no signs of tuovement were noted.
We trust this information is satisfactory; however, should you have any questions, do not hesitate to call.
Sincerely, VERMONT YANKEE NUCLEAR POWER CORPORATION
[
k E.W.
ackson 8
Manager of Operations RECEWED 9
EWJ/dm g11jg82P 7 cc: USNRC 388E8 Office of Inspection & Enforcement ggggg spsgGE EL Division of Reactor Operations Inspection p
18E M&0 Washington, D.C.
20555 t
$2gggg{7 EN g
o G
-