Interim Deficiency Rept Re Steam Generator Loose Internal Nuts & Couplings Discovered During Instrumentation Mod, Initially Reported 811123.Bechtel Has Requested Assistance from C-E in Correcting Mfg Problems.Final Rept by 820304
ML20039F252
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 12/23/1981
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8201120273
Download: ML20039F252 (3)


Text

.

Docket Nos. 50-528/529/530 50 55(e) Report

$rmmansammowemwwm

.wmmw STA.

P.O. BOX 21666 PHOENIX. ARIZONA 85036 December-23, 1981 ANPP-19768-GHD/BSK A

U. S. Nuclear Regulatory Commission p

Region V Creekside Oaks Office Park RECEIVED

,1450 Maria Lane - Suite.210 9

Walnut Creek, California 94596-5368 7

g } q jggy L 1

Attention:

Mr. B. H. Faulkenberry, Chief D

h semes ters cscas Reactor Construction and

"" $N Engineering Support Branch

'6 ff N

Subject:

Interim Report - DER 81-43 A 50.55(e) Fotentially Rapertable Deficiency Relating to Unit 1 Steam Generator Loose Internal Nuts and Couplings Discovered During Instrumentation Modification File:

81-019-026 D.4.33.2

Reference:

Telephone Conversation between J. Eckhardt and G. Duckworth on November 23, 1981

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.

Due to the extensive investigation and evaluation required, an Interim Report is attached.

It is now expected that this'infor-mation will be finalized by March 4,1982, at which time a complete report will be submitted.

Very truly yours, E.f %

E. E. Van Brunt, Jr.

g APS Vice President 4

Nuclear Projects o

j ANPP Project DireEtor m

IE (A

-d1].

EEVBJr/GHD:ske S

I.ll23

~

0;$

y:s o

Attachment n

I'5 l.

cc:

See Attached Page 2 (A

lCQ 8201120273 811223.

-a

'q PDR ADOCK 05000528

$i g

~ U. S. Nuclear Rsgulatory Commission _.

Attention:- - Mr. B. H. Faulkenberry, Chief -

ANPP-19768-GHD/BSK

-December 23,.1981

.Page 2 cc:

Victor Stello, Director U. S. Nuclcar regulatory Commission Office of Inspection and Enforcement Washington, D. C.

20555 J. A. Roedel D. B. Fasnacht G. C. Andognini F.-W. Hartley J. M. Allen A. C. Rogers B. S..Kaplan.

W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L..Patterson-R. W. Welcher R. M. Grant D. R. Hawkinson.

L. E. Vorderbrueggen

'Ms. Patricia Lee Hourihan 6413 South 26th Street Phoenix, Arizona - 85040 l

l i.

P J

9 e

m m_--_ - _ ___ _. _. _. _ _ _ __ _ _ _ _ _ _ _ _ _ _ _, _ _ _ _ _ _ _ _ _ _ _

u m m m -

m m

[

m

g INTERIM REPORT - DER 81-43 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNIT 1 l

I.

Potential Problem l

Entry by Bechtel into Steam Generator #2 for special instrumentation installation disclosed Combustion 1

Engineering, Chattanooga, delivered the item with missed factory operations.

1.

Marmon couplings. holding steam separators were not tightened.

2.

Approximately 50% of nuts 'in steam dryers above can deck were not tightened.

3.

One area of incomplete drilling through facing plate resulted in only three (3) of four (4) ' bolt locations being' installed.

I 4.

Sixty (60) PC #273-3503 are not tack welded l

per View T-T of Drawing E-78272-371-020,.

Revision 1.

Also, the dryer deck area-is not clean; it appears debris was generated during fit-up and welding 'of steam. outlet piping.,

These problems would have~ gone undetected had it not been for entry to incorporate instrumentation modification.

II.

Approach To and Status Of Proposed Resolutions Bechtel has requested assistance from Combustion Engineering in evaluating and dispositioning these problems.

III.

Projected Completion of Corrective Action and Submittal of the Final Report The evaluation and final report are forecast to be completed by March 4, 1982.