v DAVID R. PIGOTT ALAN C. WALTNER Of ORRICK, HERRINGTON & SUTCLIFFE A Professional Corporation 600 Montgomery Street San Francisco, CA 94111 Telephone:
(415) 392-1122 CHARLES R. KOCHER JAMES A. BEOLETTO SOUTHERN CALIFORNIA EDISON COMPANY P. O. Box 800 2244 Walnut Grove Avenue Rosemead, CA 91770 Telephone:
(213) 572-1900 Attorneys for Applicant, Southern California Edison Company
~
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSIQN In the Matter of
)
Docket No. 50-206
)
SOUTHERN CALIFORNIA
)
AFFIDAVIT OF KENNETH P.
EDISON CO.
)
BASKIN IN SUPPORT OF
)
SUPPLEMENT TO APPLICATION (San Onofre Nuclear
)
FOR EXEMPTION FROM DEADLINE Generating Station Unit 1)
)
TO INSTALL CERTAIN FIRE
)
SAFETY MEASURES- -
STATE OF CALIFORNIA
)) ss.
COUNTY OF LOS ANGELES
)
KENNETH P. BASKIN, being first duly sworn, hereby attests and deposes as follows:
1.
My background, experience, education and responsibilities with Southern California Edison Company
(" Applicant") are set forth in i le " Affidavit Of Kenneth P.
Baskin In Support Of Application For Exemption From Deadline T201110213 810104 PDR ADOCK 05000206 0
PDR 4
.=
e r
To Install Certain Fire Safety Measures" executed on November 5, 1981 and filed with the Nuclear Regulatory Commission on November 9, 1981.
2.
On November 9, 1981, Applicant filed an Application For Exemption From Deadline To Install Certain Fire Safety Measures, pursuant to 10 C.F.R. 550.12 (the
" Application").
The Application requested an extension, to December 17, 1981, of the deadline to install certain permanent emergency lighting equipment at Applicant's San Onofre Nuclear Generating Station, Unit 1
(" SONGS 1").
The requested exemption was necessary due to delays in installation caused by the unforeseen diversion of engineering and construction resources to other tasks.
3.
The lighting system that was the subject of the Application has now been installed and approximately 80 battery-powered emergency lighting units are now operational at SONGS 1.
However, contrary to supplier specifications, tests of the installed equipment indicate that the battery supplies for the lighting units can only provide power for approximately 5-6 hours, instead of the 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> required by 10 C.F.R.
S50.48, Appendix R, Item III.J.
Modifications are now being made to the emergency lighting units to increase their continuous duty capability to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
However, it is anticipated that these modifications will require an additional month beyond the December 17th deadline requested in the Application before full 8-hour performance can be i
2
r i
assured.
Accordingly, Applicants hereby supplement the Application to request that the deadline for installation of 8-hour emergency lighting be extended to January 17, 1982.
4.
As discussed in the Application, extensive fire safety measures instituted at SONGS 1 assure that the extension requested in the Application will not endanger life or property or the common defense and security, and is otherwise in the public interest.
As discussed above, the implementation of emergency lighting at SONGS 1 is proceeding rapidly, and a 5-6 hour supply is now operational.
An additional month, to permit correction of the technical problems with the emergency lighting equipment, is in the public interest since it will allow an increase in the continuous duty capability of the emergency lighting units,.
while permitting continued operation of SONGS 1.
5.
Additional time is necessary to install emer-gency lighting at SONGS 1.
It is expected that installation can be completed by January 17, 1982.
m L *-
KENNETH P.'BASKIN l.
Subscribed and sworn to before me l
this 30 day of December pe%.. wa -
1981.
- w s omCIAL SEAL SHEILA N. GAUTHIER i
t, NOTAFY PUBLIC-CAltf0RNJA
\\
h T~
PRiNC! PAL cmCE IN r10hD N.* k Y{$
LOS ANCELES COUNTY fliI UA Notary Public for the State of My Co".rission Exceres Nov. 4,19
~"
^
California, County of Los Angeles l
l 3
i
e-1 1
i PROOF OF SERVICE BY MAIL I declare that:
I am employed in.the City and County of San Francisco, California.
I am over the age of eighteen years and not a party to the within entitled action; my business address is 600 Montgomery Street, 11th Floor, San Francisco, California 94111.
On January 4, 1982, I served the attached SUPPLEMENT TO APPLICATION FOR EXEMPTION FROM DEADLINE TO INSTALL CERTAIN FIRE SAFETY MEASURES and AFFIDAVIT OF KENNETH P.
BASKIN IN SUPPORT OF SUPPLEMENT TO APPLICATION FOR 1
EXEMPTION FROM DEADLINE TO INSTALL CERTAIN FIRE SAFETY MEASURES by placing a true copy thereof in the United States mail in San Francisco, California, enclosed in a sealed envelope with postage thereon fully prepaid, addressed.as follows (except wnere inoicated by *):
- Harolo R. Denton Director of Nuclear Reactor Regulation U. S.
Nuclear Regulatory Commission Washington, D.C.
20545
- Henry J. McGurren, Esq.
Staff Counsel U.
S.
Nuclear Regulatory Commission Washington, D.C.
20545
- James A. Beoletto, Esq.
Assistant Counsel Southern California Edison Company P. O.
Box 800 2244 Walnut Grove Avenue Rosemead, CA 91770 l
a
- John V. Morowski Bechtel Power Corporation P. O.
Box 60860, Terminal Annex
'Los Angeles, CA 90060 Michael.L. Mellor, Esq.
Thelen, Marrin, Johnson & Bririges Two Embarcadero Center San Francisco, CA 94111
- Huey Johnson' Secretary for Resources State of California 1416 Ninth Street Sacramento, CA 95814 Janice E.
Kerr General Counsel California Public Utilities Commission 5066 State Building San Francisco, CA 94102
- J.
Rengel Atomic Power Division Westinghouse Electric Corporation Box 355 Pittsburgh, PA 15230
- A.
E. Gaede P. O. Box 373 San Clemente, CA 92672 Frederick E. John Executive Director California Public Utilities Commission 5050 State Building San Francisco, CA 94102
- Docketing and Service Section Office of the Secretary U. S. Nuclear Regulatory Commission Washington, D.C.
20555-REBECCA P. SEGUERRE Rebecca P. Seguerre