ML20039E623
| ML20039E623 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 12/23/1981 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20039E620 | List: |
| References | |
| NUDOCS 8201110094 | |
| Download: ML20039E623 (2) | |
Text
.
.b DOCKET NOS. 50-416 APID 50-417 MISSISSIPPI POUER AND LIGHT COMPANY
'IO 1 1 SNTH E'!E.MY, InC.
.i
~j SCUTH MISSISSIPPI ELECTRIC POWER ASSCCIATION NOTICE OF ISSUANCE OF M'Et:C"ENT TO CCHSTRUCTION PERMITS The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 7 to Construction Permit CPPR-118 and Amendment No. 7 to Construction Pemit CPPR-119, issued to Mississippi Power and Ligitt Company, Middle South Energy, Inc. and South Mississippi Electric Power Association for the Grand Galf Nuclear Station, Units 1 and 2, (the Facility) located in Claiborne County, Mississipni.
The amendments delete monitoring and capacity requirements for sediment
- j retention basins from the Environmental Protection Program Respecting Construction of Grand Gulf Nuclear Station, Units 1 and 2.
Such monitoring and capacity require-
^!
- l ments for the sediment retention basins are currently covered by a National i
Pollutant Discharge Elimination System permit for the facility which is unaffected by these Construction Pemit Amendments. The amendments are effective as of the the date of issuance.
,,The applicathon for these anendnents complies with the standards and require-ments of the Atmic Enercy Act of 1954, as amended, (the Act) and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the pemit amendments. Prior public notice of these amendments was not required since the amendments do not involve a significant hazards consideration.
t C FFiC. >
................., M %g $ $ g g 3*;g
-_n..
~...
.n ~... ~..
. ~
n.....~.n~~
...-.n....n.nn.
giM a
nac ronu ais oo-eoi nacu cao OFFICIAL RECORD COPY uscm --m
. t The Corm 91ssion has detemined that +ne issuance of tnese rend.nents wiii t
i not result in any significant environmental impact and that, pursuant to 10 i
CFR 51.5(dl(4), vi environrental irract statement or negative declaration i.
and enviccanental inpact acoraisal need not t.c preoared in connection siith j
the issuance of these amendments. For further details with respect to this action see (1) the application for ameitdment dated September 26, 1980 and suppleented by letters dated December 31, 1980 and August 31, 1981 (2)
Anendment No. 7 to CPPR-118, (3) Amendment No. 7 to CPPR-119, and (4) the i
I.
Commission's related letter evaluation. All of these items are available for public inspection at the Comission's Public Docunent Room, 1717 H Street, N.W., Washington, D. C.
20555 and at Hinds Junior College, i
j Ccorge M. McLendon Library, Raymond, Mississippi.
In addition, a copy of the i
l above items (2), (3) and (4) may be obtained upon reques*:, addressed to the U. S.
1 Nucitar Regulatory Comission, Washington, D. C. 20555, Attention: Director, Division of Licensing, Office of' Nuclear Reactor Regulation.
i.
Dated at Bethesda, Maryland this day of December,1981.
l l.
FOR THE NUCLEAR REGULATORY COTUISSION l-2002 16. $2.n e:,
Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation See preirious page for initals g,
,,f DL:LB#2 DL:LB DL:LB#2 OELD' #
DL:ADtl DL:DD:L /
Ot:QIR,
omer>
.g.......
-.R,9,il,kg,,U,;p,t,,* M,5
,,,,,,,e,,,,
- AS,c,h,,w e,n,c,e r,,E Ke,t,c,h,e n,,,,,,, rte,de 5,co,761,,
,,1,27
,,781,,,, t2 g.
RPurple DMsen,hgt sunname>
.. /...1../81....-.../1.$...8.1 11. /.16/.81...
12../. /.f...../. 8112/ -
12 o4re >
.......2.....
e.................
j wnc ronu sia compencu oua OFFICIAL RECORD COPY usam mi-us-,eo u
.2