ML20039E423

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-320/81-21 on 811115-1212.No Noncompliance Noted
ML20039E423
Person / Time
Site: Crane Constellation icon.png
Issue date: 12/24/1981
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
METROPOLITAN EDISON CO.
Shared Package
ML20039E424 List:
References
NUDOCS 8201070275
Download: ML20039E423 (2)


See also: IR 05000320/1981021

Text

__

.

_

.

.

."

-

DEC 2 4193I

,

-

Docket flo. 50-320

Q'

@

'

Metropolitsn Edison Company

D

ATTil: Mr. J. J. Barton

Acting Director of THI-2

s'

RECEWED

JAN 6 1982*M2

P.O. Box 480

%

Middletown, Pennsylvania 17057

5

--

aumanamnamme

Gentlemen :

8mD 7 "

1

C>

o

Subject: Inspection 50-320/81-21

t

g

This refers to the routine safety inspection conducted by Mr. R. Lonte

of this office on tiovember15- December 12, 1981 of activities authorized

by liRC License DPR-73 and to the discussions of our findings held by

Mr. Conte with Mr. L. King and other members of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and measurements and observations made by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

flRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure

under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office

by telephone within 10 days from the date of this letter of your intention

to file a request for withholding; and (b) submit within 25 days from

the date of this letter a written application to this office to withhold

such information.

Consistent with section 2.790(b)(1), any such application

must be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons on the basis which it is claimed

{

that the information should be withheld from public disclosure.

This

'

section further requires the statement to address with specificity the

considerations listed in 10 CFR 2.790(b)(4).

The information sought to

ba withheld shall be incorporated as far as possible into a separate

h

g6

$ }l

...... .. . .. .

. .hf

I

omer y

. . _ . . .

. .. ..

. . . .

. ... .

.

. . ...

su m m )

S ..

...... ... .. ..

. ... ... .

.... .. ......

..

.

.. ... .. ..

. .. . .. ..

,

. . .,,

7

DATE)

p

.

. . .... .

..... . .. .. .. .

......m......g...

.. ..

.. , . . .

. . .

..

..

. . . . . . , , , .

NRC FORM 318110

RCM 0240

OFFICIAL RECORD COPY

,um e-32m.

_

r

. j

i, .

.

.

,

c%

. *

wng~mp

q; .

g

4

3.

o.

3

%

.

!'.atropolitan Edison Company

-2-

DEC 2 41981

If

p' art..of(the affidavit.

If we do not hear from you in this regard within

_

. the specified pariods noted above, the report will be placed in the

'

. Public Document Room. The telephone notification of your intent to

.

request withholding, or any request for an extension of the 10 day

_

period which you believe necessary, should be made to the Supervisor,

. . .

Files, Mail ~and Records, USHRC Region I, at (215) 337-5223.

"

_

'

No reply to this letter is required. Your cooperation with us in this

i

matter is appreciated.

_.

Sincerely,

O.b. hlCI A 9

f^

Original Signed By:

Richard W. Starosteckt, Director

Division of Resident and Project

Inspection

Enclosure:

Office of Inspection and Enforcement Inspection Report

-Humber 50-320/81-21

~ cc'w/cne1:

L. King, Acting Director, site Operations

J. E. Larson, Supervisor, TMI-2 Licensing

E. G. Wallace, PWR Licensing Manager

_,

J. B. Liberman, Esquire

G. F. Trowbridge, Esquire

'

. Public Document Room (PDR)

Mcal Public Document Room (LPDR)

Nuclear Safety Infomation Center (flSIC)

,

NRC Resident Inspector

Comnonwealth of Pennsylvania

Ms. Mary V. Southard, Co-Chairman, Citizens for a Safe Environment

(Without Report)

bec w/ encl:

Region I Docket Room (w/ concurrence)

L. Barrett, Deputy Program Director, TMI Program Office

Chief, Operational Support Section (wo/ encl)

.

.Ms. Mary V.- Southard, Co-Chaiman, Citizens for a Safe Environment

..(MI9d

TMI

..TM

..

.

DR

I

"

omer y .TMI

..

.

. ... .

. s. . , . . .

= ~ * * > R C,op, , , , , ,1, m, p, , ,MWS,,a,n ,, ,k,y,,

,

, A f ,., o,,,,

,,L

,r ,, tit

R,Ke i ,1,g. . . . .

......

..

.. ... . .. .

.. .. .. .......

g,,,,,,, ,RSta

ec,k,i

.

,,

,,,,,,,,, , ,,,,,,,,

oan) 12/2//81

12/2//81

12/Q.\\/81

f.. . . J. . 81

12A5/81

1. .. ./. 81

9

....... . .... .

....

. .... ....

............... ...

.

........

......... .. ... .

......

. . . . . . . . . . . . . . . . . . .

nec ronu ais iio,soi nacu o24o

OFFICIAL RECORD COPY

  • " ' m 32.e24