Affidavit That No Present Restoration Warranted. Restorative Measures Can Be Left Until Unit 1 Decommissioned.Certificate of Svc Encl
ML20039E359
Person / Time
Site: 05000471
Issue date: 01/06/1982
From: Scaletti D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20039E349 List:
References
NUDOCS 8201070189
Download: ML20039E359 (4)


Text

-

1/6/82 UNITED STATES OF A!1 ERICA NUCLEAR REGilLATORY C0ftf11SSION BEFORE THE AT0filC SAFETY AND LICENSING BOARD In the !btter of

)

)

BOSTON EDISON C0f1PANY, ET AL.

)

Docket No. 50-471

)

(Pilgrim Nuclear Generating

)

Station, Unit 2)

)

s AFFIDAVIT OF DINO SCALETTI 9

1.

fly name is Dino Scaletti.

I am a Project fianager in the Division of Licensing, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission.

In this capacity, I have served as Project fianager for the proposed Pilgrim Nuclear Generating Station, Unit 2 facility.

I have previously testified in this proceeding and my professional qualifications ere part of the record (following Jr. 7605).

2.

I have reviewed the Applicants' Response to Board Order of December 10, 1981, which identifies those activities which were i

undertaken at the Pilgrim Unit 2 site, as follows:

1.

Erection of a meteorological tower which will continue to be utilized to support dose projections associated with the Pilgrin-1 B1ergency Plan; 2.

Installation of pipes less than six inches in diameter in I

the ground to act as ground water observation wells as required by fiassachusetts Deoardnent of Environmental Quality Engineering Permit; 3.

Construction of earthworks to form a holding pond as required by the EPA NPDES permit.

3.

I am personally familiar with each of these activities and have reviewed them to determine whether the Applicants should undertake action 8201070189 y h i PDR ADOCK PDR G

-p.

to restore the Pilgrim Unit 2 portion of the site with respect to impacts attributable to each, For the following reasons, I conclude that no present restoratioc is warranted.

4.

With respect to Item 1, the neteorological tower, this structure will continue to have utility in connection with the Pilgrim linit 1 Emergency Plan and, therefore, should not be removed.

5.

With respect to Item 2, the piping installed for purposes of q

monitoring groundwater, and Item 3, the earthworks which torm a holdino pond, it is my conclusion that each is insignificant in terms of causing continuing environmental impacts and will not affect the use to which those portions' of the site on which they are located, would otherwise be put.

6.

Since these three items are located on a site which will cchtinue to be used for an operating nuclear power plant and do not otherwise affect site use, there is no need to now redress these items.

7.

It is my opinion that any restorative measures which are necessary with respect to the above items are best lef t until consideration is given to decommissioning of Pilgrim Unit 1 at which time restoration of the entire site will be resolved.

L Dino Scaletti Subscribed and sworn to before me this 6th day of January,1982.

%4 Notary Publi'c

/

My Commission Expire

_ / _ /f f M

/

/

o

~

UNITED STATES OF R1 ERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

, In the Matter of

' BOSTON EDIS0N COMPANY, ET AL.

Docket No. 50-471

-(Pilgrim Nuclear Generating

)

N-Station, Unit 2)

)

['

CERTIFICATE OF SERVICE I nereby certify that copies of "NRC STAFF'S SUPPLEMENTAL RESPONSE TO APPLICANTS' MOTION TO WITHDRAW APPLICATION AND TERMINATE ADJUDICATORY PROCEEDINGS" and attached

" AFFIDAVIT OF DIh0~SCALETTI" in the above-captioned proceeding have been served on the following.by deposit in the United States mail, first class or as indicated by an asterisk by deposit-in the Nuclear Regulatory Commission internal. mail system, this 6th day of January,1982:

Andrew C. Goodhope, Esq.

The Board of Selectmen Administrative Judge Town of Plymouth 3320 Estelle Terrace Plymouth, HA 02360 Wheaton, MD 20906 Dr. A. Dixon Callihan William S. Abbott, Esq.

50 Congress Street, Suite 925 Administrative-Judge Boston, MA 02109 Union Carbide Corporation P.O. Box Y Jo Ann Shotwell, Esq.

Oak Ridge, TN 37830.

Assistant Attorney General Environmental Protection Division Dr. Richard F. Cole

  • Public Protection Bureau Administrative Judge One Ashburton Place,19th Floor Atomic Safety and Licensing Board Boston,MA 02108 U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. Lester B. Smith Director of Conservation Thomas G. Dignan, Jr., Esq.

Massachusetts Wildlife Federation R. K. Gad III, Esq.

P.O. Box 343 Ropes & Gray Natick, MA 01761 225 Franklin Street Boston, MA 02110 William S. Stowe, Esq.

Boston Edison Company Henry Herrmann, Esq.

800 Boylston Street 50 Congress Street, Room 1045 Bosten, MA 02199 Boston, MA 02108 e

2-Mr. and Mrs. Alan R.. Cleeton Patrick J. Kenny, _:q.

22 Mackintosh Street Edward L. Selgrade, Esq.

. Franklin, MA 02038 Massachusetts Governor's Office of Energy Resources Francis S. Wright, Esq.

73 Tremont Street Berman & Lewenberg Boston, MA 02108 211 Congress Street Boston, RA 02110 Atomic Safety and Licensing Board Panel

  • Atomic Safety and Licensing U.S. Nuclear Regulatory Commission Appeal Board Panel
  • Office of the Secretary U.S. Nuclear Regulatory _ Commission Washington, DC 20555

$lbl/

~

Lawrence J. Chandler

~~

Deputy Assistant Chief Hearing' Counsel eg e

F

{

J gi w

9

,, ~

7,,-,-.--.,

e sw,,r-,y-

._ - -, - -n,,,.

,.e,,

, -., -, - - - ~.,. _,, -,,.

v.

,-,,- -.