Forwards Revision 1 of Analysis of Hydrogen Control Measures at McGuire Nuclear Station, Vol Iii,In Response to NRC 810721 & 0924 Requests for Info
ML20039E167
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 12/31/1981
From: Parker W
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20039E168 List:
References
NUDOCS 8201060604
Download: ML20039E167 (1)


Text

_

m\\$

^-

~Q'Y,

\\

'.3 DUKE POWEH COMMY kg

?;

79 4

Powru 13rit.nswo 8

k O/

[

'N

,f 4e2 SouTu Cut:wcu STureT, CHAHt,OTTE, N. C. 20242 q;,

q u,

~

\\x

\\7

[j',*ra\\

W il,LI AM O. PA R M E R, J R.

Ser P.cs or~.

December 31, 1981 m

er SYtau PocoucT om

-4C83 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuc1 car Regulatory Commission Washington, D. C.

20555 Attention:

Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: McGuire Nuclear Station Docket Nos. 50-369, 50-370

Dear Mr. Denton:

Attached herewith is Revision 1 to Duke Power Company's report "An Analysis of Hydrogen Cat. trol Measures at McGuire Nuclear Station". The purpose of this revision is to provide final responses to NRC requests for information dated July 21, 1981 and September 24, 1981. This revision also includes an additional final research project report, "Effect of Water Fog Inerting of Hydrogen-Air Mixtures", and several minor corrections and updates to the overall document.

Installation of the final hydrogen mitigation system as described in the attached report is complete. Based on the analysis and test'ng performed, it is our con-clusion that this system will perform its intended function with adequate margin.

While there are still several research project reports which are not complete, virtually all of the testing associated with the projects has been completed (the exception being the Whiteshell Laboratories sphere-tube detonation te.ating).

Final or interim reports are expected to be submitted in January, 1982 for the remainder of the research effort. The result of this research is not expected to alter our conclusions'about the effectiveness of the installed hydrogen mitigation system.

m Ver '/truly yours,,'

lWilliamO. Parker,Jr.

M C.).

L-

?

GAC/j fw Attachment cc:

Mr. P. R. Bemis Mr. James P. O'Reilly, Regicnal Administrator Senior Resident Inspector U. S. Nuclear Regulatory Commission McGuire Nuclear Station Region II gy 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 I WO 8201060604 811231' PDR ADOCK 05000369 p

PDR