Interim Deficiency Rept Re Suppression Pool Stainless Steel Cladding Sensitization.Final Rept Will Not Be Submitted on 811215 as Promised in Util 810529 Ltr Due to Extent of Investigation.Final Rept Will Be Submitted by 820315
ML20039D796
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 12/17/1981
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, RDC-19(80), NUDOCS 8201060168
Download: ML20039D796 (1)


Text

THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY P O. BOX 5000 m CLEVEL AND. oHlo 44101 m TELEPHONE (216) 622-9800 m ILLUMINATING BLDG- e 55 PUBLIC soUARE Da!wyn R. Davidson "9 # # # 'U" '" # '

YlCE PRESIDENT SYSTEM ENGINEERING Ah.D CONSTRUCTION December 17, 1981 NN! 's Mr. James G. Keppler [ \'

Director, Region III Office of Inspection and Enforcement United States Nuclear Regulatory Commission 2)) eg# ,_

  • ' j 799 Roosevelt Road -

Glen Ellyn, Illinois 60137 ( ^s /

RE: Perry Nuclear Power Plant Docket Nos.

50-440; 50-441 Significant Deficiency Suppression Pool Stainless Steel Cladding Sensitization (ROC 19(80)

Dear Mr. Keppler:

Our last letter on this subject dated May 29, 1981, states that our final report is scheduled to be submitted to your office by December 15, 1981. In that letter we clso advised that an independent investigation on the effects of the stainless steel sensitization on the possible corrosion during plant service life had to be com-pleted prior to preparation of our final report. Due to the extent of this investi-gation which includes fracture analysis to determine the affects of loading on the structure, and corrosion aspects such as intergranular stress corrosion and creviced corrosion, it has become necessary to request an extension of the date for submitting our final report to your office.

This was discussed with Mr. L. McGregor of your office on December 14, 1981, and he indicated that this would be acceptable. We now anticipate that all studies will be completed and our final report will be submitted by March 15, 1982.

Very truly yours, o h1 Dalw' R. Davidson, Vice President System Engineering and Construction cc: USNRC - Site Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 U. S. Nuclear Regulatory Commission c/o Document Management Branch Washington. D.C . 20555 8201060168 811217 PDR ADOCK 05000440 S PDR g gg g M l '7? d