Forwards FEMA Region 9 Implementation Schedule for 12 Stds Needing Corrective Action Re Emergency Planning.Matters Should Not Preclude ASLB from Making Finding of Reasonable Assurance of Adequate Offsite Preparedness Capability
ML20039D688
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/29/1981
From: Krimm R
Federal Emergency Management Agency
To: Grimes B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20039D687 List:
References
NUDOCS 8201060004
Download: ML20039D688 (2)


Text

a w n m.m

/

\\ Federal Emergency Management Agency l

1 Washington, D.C. 20472 j

\\

GEC 2 S 19B' MEMORANDUM FOR: Brian Grimes Director Division of Emergency Preparedness U.-

ucle r Re u atory Commission FROM:

Ric ar W. Kri.an Assistant Associate Director Office of Natural and Technological Hazards

SUBJECT:

Diablo Canyon - Dates for Corrective Action Completion Reference is made to my November 17, 1981, memorandum to you in which I forwarded the Federal Emergency Management Agency (FEMA), Region IX Interim Evaluation and Status Report on State and local emergency preparedness around the Diablo Canyon Nuclear Power Plant. Where corrective actions are not required, the pertinent planning standard is deemed by Region IX to be adequately met.

Region IX has furnished the implementation schedule for the 12 standards needing corrective action.

I have attached the schedule to this memorandum, together with the Region IX Acting Regional Director's December 15, 1981, transmittal to the FEMA Associate Director, State and Local Programs and Support.

FEMA has reviewed the proposed corrective actions for offsite emergency preparedness. The agency is of the view that they do not represent matters which should in any way preclude the Atomic Safety and Licensing Board from making a finding of reasonable assurance of adequate offsite preparedness capability at this time.

They are primarily ~ administrative in nature; FEMA and the Nuclear Regulatory Commission staff have adequate means to insure their completion prior to full power operation.

Region IX will inform FEMA Headquarters at such time as these corrective actions have been completed.

Attachments 8201060004 820105 PDR ADOOK 05000275 o

PDR

FEDERAL EMERGENCY MANAGEMENT AGENCY Redon IX 211 Main Street, Room 220 San Francisco, CA 94105 i

DEC 151981 MDORANDUM FOR LEE THOMAS, ASSOCIATE DIRECTOR STATE AND LOCAL FROGRAMS AND SUPPORT FROMt Francis S. Manda, Acting Regional Director

SUBJECT:

YZMA. Region.IX Evaluation and Status Report on State and Local Eamrgency Preparedness Around the Diablo Canyon Nuclear Power Plant-Dates for Corrective Action Completion Projected dates for completion of corrective actions specified in our memorandum of November 2,1981, have been developed by FDn legion II and coordinated with representatives from the California Office of Emergency Services. San Luta Obispo Office of Energency Services, and Pacific Gas and Electric Company. The following dates are keyed to the specific corrective actions shown in Part IV of the November 2, 1987., menorandum:

IV.

PLANNING ORJECTIVES:

~

E1.

January 30, 1982 E2. March 15. 1982 E3.

April 15, 1982 E4.

February 20, 1982 F.

May 1,1982 G.

June 20, 1982 Hl.

April 15, 1982 a2. 7ebruary 15, 1982 E3. May 1, 1982 K.

March 1, 1982 N.

March 15,1982 0.

March 15, 1982 i