Considers Implementation Schedule for Emergency Procedures & Training for Station Blackout Events Acceptable
ML20039D643
Person / Time
Site: Farley  
Issue date: 12/14/1981
From: Reeves E
Office of Nuclear Reactor Regulation
To: Clayton F
ALABAMA POWER CO.
References
REF-GTECI-A-44, REF-GTECI-EL, TASK-A-44, TASK-OR GL-81-04, GL-81-4, NUDOCS 8201050303
Download: ML20039D643 (2)


Text

A

,c

,t i

DISTRIBUTION Docket File C. Nelson NRC PDR DEC 141981 Local PDR TERA NSIC ORB 1 File D. Eisenhut Docket Nos. 50-348 J. Heltemes and 50-364 S. Varga e

C. Parrish sh E. Reeves p

g g

Mr. F. L. Clayton OELD Ec2 O

11; Senior Vice President I&E (3)

D

.;], e,,, &g Alabama Power Company ACRS - (10)

A Olr

..l

, P. O. Box 2641 C.AMUod V'c.

,/

Birmingham, Alabama 35291 gg

/

y# *

Dear Mr. Clayton:

N

%'l Q EMERGENCY PROCEDURES AND TRAINING FOR STATION BLACK 0UT EVENTS

' " g

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT UNITS 1 AND 2 We have reviewed your response to our Generic Letter 81-04 relating to the subject. Our review was to confirm that such procedures and training either currently exist or will be implemented on an acceptable schedule. We advised you by letter dated August 25, 1 981 of our concerns relating to the urgency.

we have assigned to this matter.

On September 16, 1981, you responded with your commitment to implement emergency procedures and training for station blackout within 60 days after receipt of guidelines from the Westinghouse Owner's Group. At that time guidelines were expected by September 22, 1981. However, during discussions between the NRC Project Manager and members of your staff on December 10, 1981, we were advised of the following:

?

1.

Westinghouse Owner's Group guidelines were received by Alabama Power Company on December '.8',.1981.

2.

The same guidelines were provided to the NRC staff by letter from Westinghouse (0G-64 November 30, 1981).

3.

Your best effort is being made to implement procedural changes and I

additional training for station blackout at Farley Site by January 30, 1982.

j Based on the information provided we consider your implementation schedule acceptable.

SI" i sis;ned By[

O is 8201050303 811214*

DR ADOCK 05000 p

Edward A.-Reeves, Project Manager Operating Reactors Branch No. 1 Division of Licensino ORB 1 ORB 3

/ 0RB m/...See-ne];t page y g orrice >

y-SUCNAME) ghg -

,.EReev s m N-n-

.12//. 81..

1Z]J.4/81.. J...121tEJS1..

omy mc FORM 318 (10-80) NRCM 024o OFFICIAL RECORD COPY usom mi.mw

- Mr. F. L. Clayton, Jr.

Alabama Power Company.

cc: Mr. W. O. Whitt Executive Vice President Alabama Power Company Post Office Box 2641

. Birmingham, Alabama - 35291 Ruble A. Thomas, Vice President Southern Company Services, Inc.

Post Office Box 2625 Birmingham, Alabama 35202 George F. Trowbridge, Esquire Shaw, Pittman, potts and Trowbridge 1800 M Street, N.W.

Washington, D. C.

20036 i

Robert A. Buettner, Esquire Balch, Binohan, Bak?r, Hawthorne, Williams and Ward Post Office Box 306 Birmingham, Alabama 35201 George S. Houston Memorial Library 212 W. Burdeshaw Street Dothan, Alabama 36303 Resident Inspector U. S. Nuclear Regulatory Commission Post Office Box 24-Route 2 Columbia, Alabama' 36319 Mr. R. P. Mcdonald Vice President - Nuclear Generation Alabama Power Company P.O. Box 2641 Birmingham, Alabama 35291

't

- -. -