ML20039D511

From kanterella
Jump to navigation Jump to search
Discusses Costs Incurred in Processing & Issuance of Ol. Since Max Fee Has Been Paid,No Addl Fee Required
ML20039D511
Person / Time
Site: Sequoyah 
Issue date: 11/17/1981
From: Miller W
NRC OFFICE OF ADMINISTRATION (ADM)
To: Parker W
DUKE POWER CO.
References
NUDOCS 8201050088
Download: ML20039D511 (3)


Text

r-1 p..

NOV 171981

/(&Ei%

Docket No. 50-327 D

NOV181981> r9 Duke Power Company

.~

u.s. unw uausu ATTN: Mr. William O. Parker, Jr.

'N.

\\

sm ussum Vice President - Steam _

Production A

P.O. Box 33189 s

441 S. Church Street Charlotte, North Carolina 28242 Gentlemen:

On January 23, 1981, the Commission issued Operating License NPF-9 (zero power) for the HrGuire Nuclear Station.- Unit 1.

On July 8.-1981 the. license was amended to authorize full power (100%) operation.. As required by 10 CFR 170.21, an operating license fee of $1,024,500 was paid for the issuance of the operating license.

In accordance with Footnote 3 of Section 170.21, the' costs incurred in the processing and issuance of the McGuire 1 operating license have been reviewed and they substantially exceed the maximum fee of $1,024,500 pre-scribed by the Commission's regulations. Since the maximum fee prescribed by regulation for an operating license has been paid, no additional operating license fee is required for McGuire.1.

i

, Sincerely, omn21 s!cnet br:

Wu. O. Miller.

William 0. f1111er, Chief License Fee Management Branch Office of Administration DISTRIBUTION:

Docket File (White copy w/cy of memo to files with backup info.)[

PDR LPDR 1

Manpower File CJHolloway, LFMB RMDiggs, LFMB KLKohler, LFMB LFMB R/F (2)

T8201050008 811117 f

PDR ADOCK 05000327

P PDR
ADM LFMB:ADM (f.MB: PDM omce p cumus).K..L..K...l..e..r...:.b..s..

..lloway WOMiller

..........k............

om>.wg1.a1...........w./.4........

...u.

.u.....

.a.t...

wnc Fonu sia iso-ao) nacu ono OFFIClAL. RECORD COPY u;om ini_m+o

o UNITED STATES 8

NUCLEAR REGULATORY COMMISSION o

{

.r WASHINGTON, D. C. 20555

%g...../'

110V I 71981 MEMORANDUM FOR:

Files THRU:

William 0. Miller, Chief, License Fee Management Branch, ADM FROM:

C. James Holloway, Jr., Assistant Chief, License Fee Management Branch, ADM

SUBJECT:

McGUIRE 1 OPERATING LICENSE REVIEW COSTS On January 23, 1981 the Commission issued a zero power license for McGuire 1.

The license was amended on July 8, 1981 to authorize full power operation.

In accordance with Footnote 3 of Part 170.21, we have reviewed the costs incurred by the various program offices directly involved in the processing and issuance of the McGuire 1 operating license. Attached is a sumary of the review costs as well as the supporting documentation from the program offices. The attachment shows that to date a total of $2,192,466 has been expended for the review of McGuire 1.

Since the maximum fee ($1,024,500) prescribed by regulation has been paid, no additional operating license fee is required for McGuire 1.

k C

ames Holloway, Jr.,

ssistant Chief i ense Fee Management Branch fice of Administration

Enclosure:

Summary of costs to supporting documentation

Duke Powe, Company McGuire 1 100% Power License 7/8/81 Custom Review-First Unit Docket 50-369, License NPF-9 Program Office Professional Cost'of Professional Manpower Contractual Total Review Man-hours Expended Manpower /hr.

Cost Support Costs Unit 1

- NRR 32,397 3/

$ 39

$1,263,483- $353,509

$1,616,992 lE 15,610.4 36 561,974 561,974 ACRS 270 50

-13,500 13,500 ASLBP Contested Hearing ASLAP None 2/

Total Cost:

.$2,192,466 1/ We have not included 10,541 staff hours expended for contested hearings.

- 2/ - The total. cost of $2,192,466 exceeds.the maximum fee of-$1,024,500 as stated in Section 170.21,A.l. of Part 170.

In accordance with Footnote 3 of 170.21, no additional OL fee is due from the licensee.

L