ML20039D511
| ML20039D511 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 11/17/1981 |
| From: | Miller W NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Parker W DUKE POWER CO. |
| References | |
| NUDOCS 8201050088 | |
| Download: ML20039D511 (3) | |
Text
r-1 p..
NOV 171981
/(&Ei%
Docket No. 50-327 D
NOV181981> r9 Duke Power Company
.~
u.s. unw uausu ATTN: Mr. William O. Parker, Jr.
'N.
\\
sm ussum Vice President - Steam _
Production A
P.O. Box 33189 s
441 S. Church Street Charlotte, North Carolina 28242 Gentlemen:
On January 23, 1981, the Commission issued Operating License NPF-9 (zero power) for the HrGuire Nuclear Station.- Unit 1.
On July 8.-1981 the. license was amended to authorize full power (100%) operation.. As required by 10 CFR 170.21, an operating license fee of $1,024,500 was paid for the issuance of the operating license.
In accordance with Footnote 3 of Section 170.21, the' costs incurred in the processing and issuance of the McGuire 1 operating license have been reviewed and they substantially exceed the maximum fee of $1,024,500 pre-scribed by the Commission's regulations. Since the maximum fee prescribed by regulation for an operating license has been paid, no additional operating license fee is required for McGuire.1.
i
, Sincerely, omn21 s!cnet br:
Wu. O. Miller.
William 0. f1111er, Chief License Fee Management Branch Office of Administration DISTRIBUTION:
Docket File (White copy w/cy of memo to files with backup info.)[
PDR LPDR 1
Manpower File CJHolloway, LFMB RMDiggs, LFMB KLKohler, LFMB LFMB R/F (2)
T8201050008 811117 f
PDR ADOCK 05000327
- P PDR
- ADM LFMB:ADM (f.MB: PDM omce p cumus).K..L..K...l..e..r...:.b..s..
..lloway WOMiller
..........k............
om>.wg1.a1...........w./.4........
...u.
.u.....
.a.t...
wnc Fonu sia iso-ao) nacu ono OFFIClAL. RECORD COPY u;om ini_m+o
o UNITED STATES 8
NUCLEAR REGULATORY COMMISSION o
{
.r WASHINGTON, D. C. 20555
%g...../'
110V I 71981 MEMORANDUM FOR:
Files THRU:
William 0. Miller, Chief, License Fee Management Branch, ADM FROM:
C. James Holloway, Jr., Assistant Chief, License Fee Management Branch, ADM
SUBJECT:
McGUIRE 1 OPERATING LICENSE REVIEW COSTS On January 23, 1981 the Commission issued a zero power license for McGuire 1.
The license was amended on July 8, 1981 to authorize full power operation.
In accordance with Footnote 3 of Part 170.21, we have reviewed the costs incurred by the various program offices directly involved in the processing and issuance of the McGuire 1 operating license. Attached is a sumary of the review costs as well as the supporting documentation from the program offices. The attachment shows that to date a total of $2,192,466 has been expended for the review of McGuire 1.
Since the maximum fee ($1,024,500) prescribed by regulation has been paid, no additional operating license fee is required for McGuire 1.
k C
ames Holloway, Jr.,
ssistant Chief i ense Fee Management Branch fice of Administration
Enclosure:
Summary of costs to supporting documentation
Duke Powe, Company McGuire 1 100% Power License 7/8/81 Custom Review-First Unit Docket 50-369, License NPF-9 Program Office Professional Cost'of Professional Manpower Contractual Total Review Man-hours Expended Manpower /hr.
Cost Support Costs Unit 1
- NRR 32,397 3/
$ 39
$1,263,483- $353,509
$1,616,992 lE 15,610.4 36 561,974 561,974 ACRS 270 50
-13,500 13,500 ASLBP Contested Hearing ASLAP None 2/
Total Cost:
.$2,192,466 1/ We have not included 10,541 staff hours expended for contested hearings.
- 2/ - The total. cost of $2,192,466 exceeds.the maximum fee of-$1,024,500 as stated in Section 170.21,A.l. of Part 170.
In accordance with Footnote 3 of 170.21, no additional OL fee is due from the licensee.
L