ML20039D349

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-483/81-24 on 811104-06.No Noncompliance Noted
ML20039D349
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/15/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20039D350 List:
References
NUDOCS 8201040007
Download: ML20039D349 (2)


See also: IR 05000483/1981024

Text

, _ -

_.

DEC 15 1981

'

<s

g

E

Docket No. 50-483

1

RECEIVED

Union Electric Company

[

7

g 4 gg g

8

ATTN:

Mr. Donald F. Schnell

~l

Vice President - Nuclear

a mammamus

Post Office Box 149 - Mail Code 400

\\- "uP"

'

St. Louis, MO 63166

47

-

Gentlemen:

~

This refers to the routine safety inspection conducted by Mr. W. J. Key of

this office on November 4-6, 1981, of activities at Callaway Plant, Unit 1,

authorized by NRC Construction Permit No. CPPR-139 and to the discussion of

our findings with Mr. R. Powers and others of your staff at the conclusion

of the inspecr. ion.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this lettec and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If 3 :ur receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

I

-8201040007 811215

gDRADOCK05000

/h/

.

.

Union Electric Company

-2-

DEC 15 USI

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in It CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noced above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

.al SI; J i f C .L !:;, cl i us"

"

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

Enclosure:

Inspection

Report No. 50-483/81-24

cc w/ encl:

W. H. Weber, Manager

Nuclear Construction

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Region IV

K. Drey

Ronald Fluegge, Utility

Division,

,ssouri Public

Service Connaission

,

f

A+f$h

R

R

RIII

Oniefson hEI

}

RIII

RIIIw

N<oTeflu

a

.-

-

Kon lin

Will ams

Key /so

12/8/81

Ag/c///

i a /r f P