ML20039D349
| ML20039D349 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 12/15/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Schnell D UNION ELECTRIC CO. |
| Shared Package | |
| ML20039D350 | List: |
| References | |
| NUDOCS 8201040007 | |
| Download: ML20039D349 (2) | |
See also: IR 05000483/1981024
Text
, _ -
_.
DEC 15 1981
'
<s
g
E
Docket No. 50-483
1
RECEIVED
Union Electric Company
[
7
g 4 gg g
8
ATTN:
Mr. Donald F. Schnell
~l
Vice President - Nuclear
a mammamus
Post Office Box 149 - Mail Code 400
\\- "uP"
'
St. Louis, MO 63166
47
-
Gentlemen:
~
This refers to the routine safety inspection conducted by Mr. W. J. Key of
this office on November 4-6, 1981, of activities at Callaway Plant, Unit 1,
authorized by NRC Construction Permit No. CPPR-139 and to the discussion of
our findings with Mr. R. Powers and others of your staff at the conclusion
of the inspecr. ion.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this lettec and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If 3 :ur receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
I
-8201040007 811215
gDRADOCK05000
/h/
.
.
Union Electric Company
-2-
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in It CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noced above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
.al SI; J i f C .L !:;, cl i us"
"
C. E. Norelius, Director
Division of Engineering and
Technical Inspection
Enclosure:
Inspection
Report No. 50-483/81-24
cc w/ encl:
W. H. Weber, Manager
Nuclear Construction
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Region IV
K. Drey
Ronald Fluegge, Utility
Division,
,ssouri Public
Service Connaission
,
f
A+f$h
R
R
RIII
Oniefson hEI
}
RIII
RIIIw
N<oTeflu
a
.-
-
Kon lin
Will ams
Key /so
12/8/81
Ag/c///
i a /r f P
L
.
-
-
- -
. - -