Forwards IE Insp Rept 50-395/81-31 on 811101-30.No Noncompliance Noted
ML20039D314
Person / Time
Site: Summer 
Issue date: 12/09/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20039D315 List:
References
NUDOCS 8112310517
Download: ML20039D314 (2)


See also: IR 05000395/1981031

Text

J.

-

f t. N c td

'

DEC 0 91981

'

-

~

.

fB'j' I A

South Carolina Electric and Gas Company

- -

x

ATTN: Mr. T. C. Nichols, Jr., Vice President

, ~'

)y,

Power Pioduction and System Operations

y

,.

P. O. Box 764

ColTnbia, SC 29218

_

OggO

. y%e

-

3

-

OOgg'

/

'

'

s

.

'

/

Gentlemen:

-

.

'

'

'

Subicct:, Repor t fb. 50-395/81-31

_

',/

'.

-

~

,

Tnis refers to the routine safety inspection conducted by fir. J. L. Skol'dsiof; /

~

this office on Mcvember 1-30, 1981, of activities authorized by NRC Construction

'

,

Permit No. CPPR-94 for the V. C. Suamer facility and to the discussion of our

findings held with fir. O. S. Bradham, Station ftanager, at the conclusion of the

^

inspection.

' ' '

4

_

Areas examined during the inspection and our findings are discussed in the

s

,

enclosed inspection report. Within these areas, the inspection consisted of

'

selective examination; of procedures and representative records, interviews with

dersonnel, and observations by the inspector.

,

Within the scope of this inspection, no violations or deviations were disclosed.

,

We have examined actions you have taken with regard to previously identified

'

enforcement matters. These are discussed in the enclosed inspection report.

s

M In.accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will be placed in the flRC's Public Document Room unless you notify this office,

,

- ~

by. teiephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

, ,,

date of this letter.

Such application must be consistent with the requirements

.or2.79C(b)(1).

.

,

Should y% have any questions concerning this letter, we will be glad to discuss

them with you.

'

Sincerely,

, ,

<

byr,, f

's

'

Paul J. Kellogg, Chief

,

j'O -

Reactor Project Branch 2

<

'

Division of Resident and

-

Reactor Project Inspection

.,

Enclosure:

-

',

inspection Report flo. 50-395/81-31

'

c's see page 2

,

8112310517 811209..

PDR ADOCK 05000395

'.

~

0

PDR

_

s

x

l, 5

.f EoP /t

c

i

'o

'.

OEc 0 91981

South Carolina Electric & Gas Company

2

cc w/ enc 1:

J. B. Knotts, Jr.

O. S. Bradham, Station flanager

J. P. Harrison, !!anager Nuclear

Security

C. A. Price, !!anager, Nuclear

Engineering

A. A. Smith, Site QA Coordinator

bcc w/ encl:

NRC Resident Inspector

Document l:anagement Branch

State of South Carolina

,

RII

RII

RII

RII

JSkhl s:dt

JR

VBro lee

g

12/ci/81

12/g/81

12/ q /81

12/9 /81

.