Expresses Concern That Cloud Draft Rept Was Submitted to Util Before Being Submitted to Nrc.Nrc Should Obtain Records of Communications from Util & Cloud Associates Re Draft Rept
ML20039D213
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/17/1981
From: Geoffrey Miller
HOUSE OF REP.
To: Palladino N
NRC COMMISSION (OCM)
References
NUDOCS 8112310427
Download: ML20039D213 (2)


Text

-

7ns Det.%:7.CauremmeA

.estac7 errocas,

,4,*

h

    • s 387 Csvw
      D=ew 2A:2 have.e Mean; Or??ca Swetos.ss PLaasaHT Mu Caoeweena M32.3
  • T2f1I'"

COnFcgg of tijc Einitch.6tateg (415) 687 3290

'm.

4. u m ucz

."J.'r'J:.".1 "."

_4 KE7EP

== ~== ~ ~"~~c haudt at Etpit%tntatibed

  • u w

~,,,a

.:,,CA;~o, %,,,

Eastington, D.C. 2315 r.o. ~ m 81 DEC 21 Al b

- = - " -

mrrmon Ano msuun ArrA:ns December 17, 1 M oen Sa.m3 g

l.

~

~

UCCYE7? G & SERytct o

cRANCH Honorsble Nunzio Palladino p

h uc r Regulatory Commissi FAC.hS.b D

0 i

K'ashington, D. C.

20555 (p

j

Dear Mr. Chairman:

\\

2/,/

/

I am writing concerning the Diablo Canyon' nuclear power plant and the investigations and reports ~done.before and since your, November 19 order.

Specifically, I am concerned that a draft report by Dr. Cloud was submitted for comment to Pacific Gas and Electric Company in the face of assurances to us that these reports would not be reviewed by PGGE before going to the NRC.

I am also concerned that the NRC'did not attempt to determine the nature and extent of PG6E's comments on the October draft, which your staff obtained on or about December 1, until receiving Congressman Pane'tta's letter of December 10.

This delayed analysis by the NRC indicates to us a lower priority than this hi 0

disturbing. ghly important subject deserves, which I find i

It is not my purpose at this time to make judgments as to whether PGGE improperly influenced the tone, content or conclusions of i

the Cloud report.

Nevertheless, the manner in which this matter has been handled by Cloud, PGGE and the NRC does not E

the public confidence that is necessary if the difficult issues 3

generate

[

raised in the Diablo Canyon matter are to be resolved in a manner reasonably acceptable to all concerned.

R E

~

t I believe it is essential that the NRC take all steps to obtain from Cloud Associates and PG6E records of formal or informal communications (including memoranda, letters, notes of telephone conversations, etc.) pertaining to the October draft preliminary report.

It is also important that you determine the whereabouts R

of Copy # 2 of the October draft.

In order to demonstrate that F

NRC staff is, in fact, pursuing this matter in a diligent manner, E

requests for the above information should be made in writing.

Please. send me copies of all such requests that have been made 5

to date or might be made in the future.

'~

~

SN I hope to receive from you at an early date the following:

D G

an analysis of differences between the October and November L

T s

Cloud reports; an explanation of the failure of the NRCataff

// O to act prior to receipt of Congressman Panetta's letter to deter-E mine the nature and extent of Cloud comments on the PGSE draft; E..

?DR hllf00275 1257 n

U PDR

~=

s.

\\

e '. _

s

,1<w Honorable Nunzio~Palladino December 17, 1981 Page 2 and a statemen't of the NRC staff position as to whether on November 3 PGSE representatives made incorrect statements con.cerning (a) the status of the preliminary Cloud report and (b) the protocol for submitting Cloud reports to the NRC.

Thank you for your prompt attention to this important matter.

- wely,

e x1tfLal GM/rce i

S e

.,,