Forwards IE Insp Rept 50-373/81-40 on 811004-1113.No Noncompliance Noted
ML20039D161
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 12/15/1981
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20039D162 List:
References
NUDOCS 8112310375
Download: ML20039D161 (2)


See also: IR 05000373/1981040

Text

.

..

.

v

t

i

DEC 15 1981

Docket No. 50-373

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. R. D. Walker,

S. E. Shepley and G. C. Wright of this office on October 4 through November 13,

1981, of activities at the LaSalle County Nuclear Station, Unit 1, authorized

by NRC Construction Permit No. CPPR-99 and to the discussion of our findings

with Mr. R. H. Holyoak at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptlyiso that a new due date may be estab-

lished.

Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld fro publ;ig disclosure.

This section further requires the statement to ddresslwi,,sqpecificity

N

"

_g

\\

I:[

e

0

' ~

D O., o O '^ 1P

\\

.1.;

.,

$bk2gggpojoo

'

O

/

_ _ _ . . . . . . . . . . . . .

.

_ _ _ . . . . _ _ _ _ _ .

,

.

..

b

L

,

n

Commonwealth Edison Company

- 2 ~' '

.

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated es far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

_

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Recm.

We will gladly discuss any questi<as you have concerning this inspection.

Sincerely,

'

00itgin51 signed by R.L. spessard"

-

R. L. Spessard, Director

Division of Resident and Project

Inspection

Enclosure:

Inspection Report

No. 50-373/81-40

-

cc w/ enc 1:

'

,

Louis 0. De1 George, Director

'

of Nuclear Licensing

L. J. Burke, Site

Construction Superintendent

T. E. Quaka, Quality

Assurance Supervisor

R. H. Holyoak, Station

Superintendent

B. B. Stephenson, Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

,

_

$

-\\gl

./

-

RIII

'

RIII{

1 %-l G- c l

t t

W

RII;/

RIII

RIII

SO

p

uQL V

Reimann/

Knop

Spps

Walker

Shepley ,f

,

i

12/14/81

tg

{7'

[h. 60.lg

[1lI ,

~

.-

,e

"