Text
.
..
.
v
t
i
DEC 15 1981
Docket No. 50-373
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. R. D. Walker,
S. E. Shepley and G. C. Wright of this office on October 4 through November 13,
1981, of activities at the LaSalle County Nuclear Station, Unit 1, authorized
by NRC Construction Permit No. CPPR-99 and to the discussion of our findings
with Mr. R. H. Holyoak at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptlyiso that a new due date may be estab-
lished.
Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld fro publ;ig disclosure.
This section further requires the statement to ddresslwi,,sqpecificity
N
"
_g
\\
I:[
e
0
' ~
D O., o O '^ 1P
\\
.1.;
.,
$bk2gggpojoo
'
O
/
_ _ _ . . . . . . . . . . . . .
.
_ _ _ . . . . _ _ _ _ _ .
,
.
..
b
L
,
n
Commonwealth Edison Company
- 2 ~' '
.
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated es far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
_
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Recm.
We will gladly discuss any questi<as you have concerning this inspection.
Sincerely,
'
00itgin51 signed by R.L. spessard"
-
R. L. Spessard, Director
Division of Resident and Project
Inspection
Enclosure:
Inspection Report
No. 50-373/81-40
-
cc w/ enc 1:
'
,
Louis 0. De1 George, Director
'
of Nuclear Licensing
L. J. Burke, Site
Construction Superintendent
T. E. Quaka, Quality
Assurance Supervisor
R. H. Holyoak, Station
Superintendent
B. B. Stephenson, Project Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
,
_
$
-\\gl
./
-
RIII
'
RIII{
1 %-l G- c l
t t
W
RII;/
RIII
RIII
p
uQL V
Reimann/
Knop
Spps
Walker
Shepley ,f
,
i
12/14/81
tg
{7'
[h. 60.lg
[1lI ,
~
.-
,e
"