Forwards IE Insp Rept 70-1151/81-14 on 811019-23 & Notice of Violation
ML20039D016
Person / Time
Site: Westinghouse
Issue date: 11/09/1981
From: Gibson A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Damore M
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
Shared Package
ML20039D009 List:
References
NUDOCS 8112310217
Download: ML20039D016 (2)


Text

hcLd NOV 9 1981 Westinghouse Electric Corporation ATTN: Mr. fl. D' Amore, Manager Columbia Plant Nuclear Fuel Division Drawer R Columbia, SC 29205 Gentlemen:

Subject:

Report No. 70-1151/81-14 This refers to the routine safety inspection conducted by Mr. G. P. Coryell of this office on October 19-23, 1981, of activities authorized by NRC License No. SNM-1107 for the Columbia Nuclear Fuel facility. Our preliminary findings were discussed with you and members of your staff at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection ~ consisted of-selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license appear to violate NRC requirements.

This item and references to pertinent requirements are listed in the Notice of Violation enclosed herewith as Appendix A.

Elements to be included in your response are delineated in Appendix A.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this office by telephone within ten days from the date of this letter of your intention to file a request for withholding; and (b) submit within twenty-five days from the date of this letter a written application to this office to withhold such information.

If your receipt.of this letter has been delayed such~

that less than seven days are available for your review, please notify this office promptly so that a new due date may be established.

Consistent with section 2.790(b)(1), such application must be accompan'ed by an affidavit executed by the owner of the information which identifies the document or part thereof sought to be withheld, and a full statement of the reasons on the basis of which it is claimed that the information should be withheld from public disclosure. This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The infonnation sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit. -If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.

C

NOV 9 1981 Westinghouse Electric Corporation 2

Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely,

/s/

A. F. Gibson, Chief Technical Inspection Branch

Enclosures:

1.

Appendix A, Notice of Violation 2.

Inspection Report No. 70-1151/81-14 bec w/o encl:

License Fee ibnagement Branch Document fianagement Branch State of South Carolina RII RII RII E M/81 GCoryell:dt ine AFGibson 1$///81 14/9 14/ /81