i
,:e DISTRIBUTION
- y".
8.Docketn.
bcc: TERA LB#1 Reading NRC PDR 4
I DEC 1 1981 DEisenhut/RPurple L PDR BJYoungblood NSIC MRushbrook TIC SBurwell ACRS(16)
Docket Nos. 50-445 RVollmer and 50-446 TMurley 1
RMattson RHartfield,MPA SHanauer Mr. R. J. Gary VBenaroya g
k[
Executive Vice President 0 ELD and General Manager 01&E(3)
\\
k ' gE Texas Utilities Generating Company RFerguson 2001 Bryan Tower es 2.
Dallas, Texas 75201 j
y, CS
Dear !!r. Gary:
/4
Subject:
Comanche Peak Tray Fire Barrier Evaluation yf s \\y
/g On October 29, 1981, we received a copy of the test report, " Fire Qualification Test of a Protective Envelope System", October 27, 1981, Southwest Research Inc.(SWRI). A letter from Mr. H. C. Schmidt dated November 18, 1981, requested i
that we review this report and evaluate this material for acceptability for use in the Comanche Peak plant to meet requirements for fire barrier material.
A description of the rei art and our review follows.
To satisfy the cable tray fire protection requirements in Section III.G.2.c of Appendix R to 10 CFR Part 50, the applicant has proposed to utilize the TSI fire barrier system. The fire test for this material / system has been documented in a " Fire Qualification Test of a Protective Envelope System",
dated October 27, 1981. The TSI material successfully protected the cables for a time period of one hour.
We have evaluated the fire test report and conclude that it demonstrates that the TSI material / system exhibits equivalent or better characteristics of other i
approved materials, and therefore can provide an acceptable fire barrier for cable trays and cables. Based on our evaluation, we conclude that the use of the TSI material / system will meet the requirements of Appendix R to 10 CFR Part 50 and is therefore acceptable.
i Sincerely, t
l Orfgimi Signed by l
bbed L. Tode.sco I
8112300294 811201 Robert L. Tedesco, Assistant Director j
PDR ADOCK 05000445 for Licensing F
PDR Division of Licensing cc: See next page
- SEE PREVIOUS CONCURRENCE FOR INITIALS
..D..L..:.L..B.#.1.*.....
...D..L..:..L. B..#.1.........
....D..E..:.C..E.B...*........
.d..
omer >
gh>
SB u rwc.1,1,:y,t.,,,
,J,Y,o,u,ngb,lp,p.d,,,
,,y,Bena,rp,y,a,,,,,,,B((g,,qp,,.,
Ilgb DATE).1.l123/. 1.......1.112.k/.b1..........N h[.O k......h.[..h.[b1.....
.................... ~..
NRC FORM 318 (10-80) NRCM 024a OFFICIAL RECORD COPY usoeo:ini-meco
Mr.r..R.J. Gary i~
Executive Vice President and General Manager Texas Utilities Generating Company 2001 Bryan Tower Dallas, Texas 75201 cc: Nicholas S. Reynolds, Esq.
J. Marshall Gilmore i
Debevoise & Liberman 1060 West Pipeline Road.
i
.1200 Seventeenth Street Hurst, Texas 76053 Washington, D. C.
20036 l
Resident Inspector / Comanche Peak Spencer C. Relyea, Esq.
Nuclear Power Station Worsham, Forsythe & Sampels c/o U. S. Nuclear Regulatory 2001 Bryan Tower Commission 1
Dallas, Texas 75201 P. 0. Box 38 Glen Rose, Texas 76043 Mr. Homer C. Schmidt Manager - Nuclear Services Richard Fouke Texas Utilities Services, Inc.
Citizens for Fair Utility Regulation I
2001 Bryan Tower Arl8-B Carter Drive....
166 Dallas, Texas 75201 ington,' Texas 76010 Mr. H. R. Rock
~
~
Gibbs and Hill, Inc.
393 Seventh Avenue l
New York, New York 10001 Mr. A. T. Parker 3
i Westinghouse Electric Corporation i
P. 0. Box 355
~
Pittsburgh, Pennsylvania 15230 4
David J. Preister Assistant Attorney General Environmental Protection Division P. O. Box 12548, Capitol Station Austin, Texas 78711 Mrs. Juanita Ellis, President Citizens Association for Sound
, Energy 1426 South Polk Dallas, Texas 75224 i
~
)
i b
[
~
/
go Dist.
Docket File LB#1 Rdg bcc:
DEisenhut TERA BJYoungblood NRC/PDR Docket Pfos.:
50-445 MRushbrook L/PDR and 50-446 SBurwell NSIC RLTedesco TIC RVollmer ACRS (16)
"r.
P. J. Gary TMurley Fxocutive Vice fresident Rfiattson and General "anacer RHartfield, MPA Texas Utilities Generatinn Connany SHanauer 7n01 Rryan Tower \\
VBenaroya s
Dallas, Texw 7520)
OELD OIE (3)
Dear "r. Garv:
Subjact: Conancho Peak Tray Fire Barrier Evaluation
\\\\
On Octotor 29, 1o91 we rc'ceived a copy of the test report, " Fire 00alification Test of a Protective Fnvolore System", October 27, 1991 Southwest Research I nc. ( SLT I ). A letter frch "r. H. C. Schnidt dated "ovember 10, 1951 requested that we review this recort hnd evaluate this naterial for acceptablity for use in tbn Comanche Peak plant to reet renuirments for fire barrier caterial.
A description of the report a i nur review follows.
To satisfy the cable tray fire'erotection requironents in Section III.G.2.c of Appendix R to 10 CFP. 50, the Mpplicant has proposed to utilize the TSI fire barrier system. The fire test for this material /syste, has been documented in a " Fire Oualificatiop Test of a Protective Envelope Systen,"
dated October 27, 10Pl. The TSI riterial successfully protected the cables for a time period of one bour.
'x
\\
Ue have evalulted the fire tast report cnd conclude th1t it de onstrates that the TSI naterial/systen exhibits equivalent or better characteristics of other 3pproved naterials, and therefore, can provide an acceptable fire barrier for cabla trays and cables. Based'on our evaluation, we conclude that the use r# tha TSI aterial/systen wills reet the requirements of Appendix R tn 10 CFo Part 60 and is therefore, acceptable.
Sincerely, Pobert L. Tedesco, Assistant Director for Licensing Division of Licesning cc:
See naxt page l
in I
DL:LB#1 DL: /!
DL:AD/L o mce>
9.$..,......... (.7 Q..
sunnac ).S8urwe.l.1/yt BJ.Yo nod. VBenaraya...
RLTedesco..
..l.1/6f/01
.11[../81 11 M /81 11/,.,/81, oncy i
sac ronu ais oon Nncu oao OFFICIAL RECORD COPY owa. %-m m