Forwards IE Mgt Meeting Rept 50-409/81-20 on 810728 & 0925. No Noncompliance Noted
ML20039C059
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 12/14/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Linder F
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20039C060 List:
References
NUDOCS 8112280365
Download: ML20039C059 (2)


See also: IR 05000409/1981020

Text

..

--

..

.

4

.

s '

i

DEC 1 4198g.

to

,

e

e

.

'o

^'Y

y,, ;,

Docket No. 50-409

2

C

yO

7

m

Dairyland Power Cooperative-

SgI

e

,

h _fii[# [.. O8/ w T

I

ATTN:

Mr. F. W. Linder

I

w

^-

S

-

General Manager

h

",' _f

T",(C

~

2615 East Avenue - South.

La Crosse, WI 54601

.

u

, ,M t I

,

j

Gentlemen:

i

This refers to the combined enforcement conference and management meeting

conducted on July 28, 1981, in our Glen Ellyn,' Illinois, office which was

attended by Mr. F. Linder and other members of your staff and Mr. A. B. Davis-

and other members of my staff. This also refers to the-followup; management

meeting conducted on September. 25, 1981, at the LACBWR site, Genoa, Wisconsin,

which was attended by Mr. J. Taylor and other members of your. staff and

,

Mr. A. B. Davis and other members of my staff. The enclosed report of the

enforcement conference and management meetings summarizes our understanding

of the items' discussed.

'

Based on a conversation between Messrs. A. B. Davis, R. L. Spessard, and

.

i

J. Taylor following the September 25th meeting, we understand your staff

will make arrangements which allow our inspectors to periodically observe

meetings of the Operational and Safety Review Committees in order to verify

compliance with applicable NRC requirements. This type of observation is

a specific requirement of our inspection program developed pursuant to the

provisions of 10 CFR 50.70.

>

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed enforcement conference and management -

meeting report will be placed in the NRC's Public Document' Room.

If this

.

-report contains any information.that you (or your contractors) believe

1

to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that

l-

you (a) notify this office by telephone within ten (10) days from the date

i

'of this letter of your intentien to file a request for withholding; and

(b) submit within twenty-five (25) days from the date of this letter a

j

written application to this office to withhold suchLinformation.

If your

,

'{

n

3 Eol

.c

l

.I (

811228036S 81121T

PDR ADOCK 05000409

'

.

o

-PDR

m

ZE0 I

.

- - - - -

-

-

-

-- - -.

-

.

.

Dairyland Power Cooperative

-2-

December 14, 1981

receipt of this letter has been delayed such that less than seven (7) days

are available for your review, please notify this office promptly so that

a new due date may be established. Consistent with Section 2.790(b)(1),

any such application must be accompanied by an affidavit executed by the

owner of the information which identifies the document or part sought to

be withheld, and which contains a full statement of the reasons which are

the bases for the claim that the information should be withheld from

public disclosure. This section further requires the statement to address

with specificity the considerations listed in 10 CFR 2.790(b)(4). The

information sought to b2 withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this.

regard within the specified periods noted above, a copy of this letter and

the enclosed enforcement conference and mangement meeting report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this enforcement

conference and management meeting.

Sincerely,

Original signed by

James G. Keppler

James G. Keppler

Regional Administrator

Enclosures: Enforcement

Conference & Management Mtg.

Report 50-409/81-20

cc w/encls:

R. E. Shimshak, Plant

Superintendent

DMB/ Document Control Desk (RIDS)

'

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Inspector

Stanley York, Chairman

Public Service Commission

RIIy

RITI

JI

RII

bsard

Str4t,

-p

Sp

avis

Keppler

12/10/81

[

p

4 iq gl