Effective Date:
11/10/81 O
SMUD - Rancho Seco Emergency Plan Procedure AP 569 RELEASE OF INFORMATION TO THE PUBLIC AND MEDIA TABLE OF CONTENTS Page No.
1.0 PURPOSE 2
2.0 RESPONSIBILITY 2
3.0 INITIATING CONDITIONS 2
4.0 PRECAUTIONS AND LIMITATIONS 3
l l
5.0 INSTRUCTIONS 3
C
6.0 REFERENCES
5 7.0 ATTACHMENTS 5
I l
l l
s O
8112280202 811222
PDR ADOCK 05000312 F
Effective Date:
11/10/81 0
1.0 PURPOSE This procedure delineates the requirements and actions necessary for the release of information to the public and news media concerning an emergency condition at the Rancho Seco Nuclear Generating Station which has required the activation of the Rancho Seco Emergency Plan.
2.0 RESPONSIBILITY 2.1 This procedure provides instructions to the Emergency Coordinator regarding the mechanisms for releasing information to the public and news media.
2.2 This procedure provides instructions to the Media Center Coordinator for preparation and release of information to the news media.
2.3 This procedure provides instructions to emergency organization personnel who may be called on to review news releases for technical accuracy.
3.0 INITIATING CONDITIONS O
An emergency condition which requires activation of the Rancho Seco Emergency Plan has been declared by the Emergency Coordinator as defined in procedure AP 501 " Recognition and Classification of Emergency".
l 9
AP 569 Page 2 of 5
Effective Date:
11/10/81 0
4.0 PRECAUTIONS AND LIMITATIONS 4.1 All official District news releases will be issued only after being reviewed for technical accuracy and approved by the Emergency Manager or the Emergency Coordinator.
4.2 Routine news releases which do not involve events which require activation of the Rancho Seco Emergency Plan shall be made in accordance with standard administrative policies of the Rancho Seco Nuclear-Generating Station.
4.3 During an emergency, any news media personnel who arrive at the plant site shall be denied access unless their presence is specifically approved by the Emergency Coordinator.
4.4 The security force shall direct news media personnel to one of the following locations.
4.4.1 In the event of a Notification of an Unusual Event or an Alert, news media personnel will be directed to the Information Center.
4.4.2 In the event of a Site Area Emergency or a General Emergency, o
news media personnel will be directed to the Media Center.
O 4.5 This procedure does not address the requirements and mechanisms for planning and holding of press conferences.
4.6 This procedure does not include guidelines and requirements of providing the public with recommendations for emergency actions or responses.
5.0 INSTRUCTIONS 5.1 Immediate Actions 5.1.1 Upon activation of the Rancho Seco Emergency Plan, the Media Center Coordinator will report to the Emergency Operations Facility (E0F) in the event of a Site Area Emergency or a General Emergency.
In the event of a Notification of_an Unusual Event or an Alert, he will report to the Technical Support Center (TSC).
O AP 569 Page 3 of 5
Effective Date:
10/11/81 9
5.2 Subsequent Actions 5.2.1 The Media Center Coordinator will prepare an initial news release, from Attachment 7.1, " Prepared Statements for the News Mt:dia".
l 5.2.2 Once prepared, the initial news release ( Attachment 7.1) shall be reviewed by the Plant Status and Technical Infomation Coordinator (or other individual as appropriate) for technical accuracy.
5.2.3 The initial news release shall then be approved by the Emergency Manager or the Emergency Coordinator.
5.2.4 The Media Center Coordinator will notify the news media listed in Attachment 7.2, " Media Notification List" and read the initial news release (Attachment 7.1).
5.2.5 If the emergency condition warrants it (i.e., Site Area Emergency or General Emergency) the Media Center Coordinator will activate the Media Center in accordance with procedure AP 563 " Activation of the Media Center".
5.2.6 The Media Center Coordinator shall prepare and issue updated g
news releases periodically during the time that the Rancho Seco Emergency Plan is in effect. All subsequent news releases will be prepared on the form in Attachment 7.3, "Public Information News Release Form".
5.2.7 Once the Media Center has been properly activated, the Media Center Coordinator will:
5.2.6.1 Notify the public information represen-tatives of the various County Emergency Organizations prior to the news release and coordinate a joint briefing, if possible.
5.2.6.2 Prior to its release to the news media, release the approved statement, along with any special instructions or information to local, State, and Federal officials and agencies.
5.2.6.3 Insure hard copies of the news release are made available to the personnel / activities listed in.4, "Hard Copy News Release Distribution List".
O AP 569 Page 4 of 5
Effective Date:
10/11/81 0
5.2.8 The Media Center Coordinator shall coordinate all activities of news media teams permitted onsite and forward all news media requests for access to the site to the Emergency Manager.
5.2.9 The Media Center Coordinator shall designate an individual to handle all requests for information regarding the emergency, which are received from local, State, and Federal agencies and officials who are not directly involved in emergency response and recovery efforts.
5.3 Closeout Procedure 5.3.1 When the Emergency Manager has declared the emergency situation closed-out, the Media Center Coordinator will issue the Event Close-out News Release, (Attachment 7.1, Page 5).
6.0 REFERENCES
6.1 AP 501 Recognition and C'assification of Emergency 6.2 AP 563.01 Activation of the Media Center 6.3 AP 564.04 Public Information 7.0 ATTACHMENTS Revision No.
7.1 Prepared Statements for the News Media original 7.2 Media Notification List original 7.3 Public Infomation News Release Form original 7.4 Hard Copy News Release Distribution List original O
AP 569 Page 5 of 5
... _ _ _ _ _ = -
Effective Date:
10/11/81 ATTACHMENT 7.1 PREPARED STATEMENTS FOR THE NEWS MEDIA NEWS RELEASE DRAFT FOR NOTIFICATION OF AN UNUSUAL EVENT l
(Date and time of news release)
Sacramento Municipal Utility District notified Federal, State and local officials at of an Unusual Event at their Rancho Seco 3
(oate ano time)
Nuclear Generating Station.
As required by the NRC, an Unusual Event is declared for an other-than-normal plant condition not requiring an emergency response from the surrounding counties, the State of California, or the general public.
The Unusual Event was declared as a result of the following events:
(Describe events.)
O i
(
The Sacramento Municipal Utility District stated that the plant is (shut down.)
(operating at reduceC power.)
(in the process of being snut down.)
(operating normally. )
Further details will b* provided to the public and news media as they become available.
The Rancho Seco Nuclear Generating Station is a 913-MW nuclear power plant owned and operated by the Sacramento Municipal Utility District and is located approximately 23 miles southeast of Sacramento.
Prepared by:
Reviewed by:
O
^aaroved or:
(Emergency Manager or Emergency Coordinator)
AP 569.1 Page 1 of 5
Effective Date:
10/11/81 ATTACHMENT 7.1 4
PREPARED STATEMENTS FOR THE NEWS MEDIA 8
NEWS RELEASE FOR AN ALERT f
(Date and time of news release)
Sacramento Municipal Utility District notified Federal, State and local officials at (
) of an Alert situation l
date and time j
l at their Rancho Seco Nuclear Generating Station.
As required by the NRC, an Alert is declared for an actual or potential degradation of plant safety systems. Any release of radioactivity woulo be small and undetectable beyond a one-half mile radius of the plant.
)
I The ALERT was declared as a result of the following events:
j (Describe. events.)
~
O i
i The Sacramento Municipal Utility District stated that the plant is I
(shutdown.)
(operating at reduced power.)
(in tne process of ceing shut down.)
(operating ronnally. )
Further details will be provided to the public and news media as they become available.
The Rancho Seco Nuclear Generating Station is a 913-MW nuclear power plant owned and operated by the Sacramento Municipal Utility District and is located approximately 23 miles southeast of Sacramento.
Prepared by:
Reviewed by:
Approved by:
(Emergency Manager or Emergency Coordinator)
AP 569.1 Page 2 of 5
i -
~
~
~~
l Effective Date:
11/10/81 i
ATTACHMENT 7.1 PREPARED STATEMENTS FOR THE NEWS MEDIA NEWS RELEASE FOR A SITE AREA EMERGENCY (Date and time of news release)
Sacramento Municipal Utility District notified Federal, State and local officials at (
) of a Site Area Emergency cate and time t
at their Rancho Seco Nuclear Generating Station.
As required by the NRC, a Site Area Emergency is declared for actual or potential f ailure of major plant functions needed to protect the 3
public. Any release of radioactivity may affect areas within a one-half mile radius of the plant.
The Site Area Emergency was declared as a result of the following events:
()
(Describe events.)
The Sacramento Municipal Utility District stated that the plant is (shut down.)
(operating at reduced power.)
(in tne process of being snut down.)
(operating normally.)
i Further details will be provided to the public and news media as they become available.
The Rancho Seco Nuclear Generating Station is a 913-MW nuclear power plant owned and operated by the Sacramento Municipal Utility District and is located approximately 23 miles southeast of Sacramento.
Prepared by:
( ])
Reviewed by:
Approved by:
(Emergency Manager or
~ Emergency Coordinator)
AP 569.1 Page 3 of 5
Effective Date:
11/10/81
~
O ATTACHMENT 7.1 PREPARED STATEMENTS FOR THE NEWS MEDIA NEWS RELEASE FOR A GENERAL EMERGENCY (Date and time of news release)
Sacramento Municipal Utility District notified Federal, State and local officials at (
) of a General date and time Emergency at their Rancho Seco Nuclear Generating Station.
As required by the NRC, a General Energency is decla.>d for actual or imminent releases of radioactivity which may requi e protective actions by the general public.
The General Emergency was declared as a result of the following events:
i (Describe events.)
O The Sacramento Municipal Utility District stated that the plant is (shut down.)
(operating at reduced power.)
(in the orocess of being snut down.)
(operating normally.)
Further details will be provided to the public and news media as they become available.
The Rancho Seco Nuclear Generating Station is a 913-MW nuclear power plant owned and operated by the Sacramento Municipal Utility District and is located approximately 23 miles southeast of Sacramento.
Prepared by:
Reviewed by:
()
Approved by:
(Emergency Manager or Emergency Coordinator)
AP 569.1 Page 4 of 5
Effective Date:
11/10/81 O
ATTACHMENT 7.1 PREPARED STATEMENTS FOR THE NEWS MEDIA EVENT CLOSE-0UT NEWS RELEASE DRAFT (Date and time of news release)
The Sacramento Municipal Utility District, in agreement with Federal, State, and local officials, rescinded the (
emergency
) declaration at the Rancho Seco Nuclear classification Generating Station at (
).
date ano time The 913-MW nuclear power plant is now (operating normally.)
(at safe snutdown.)
Complete details will be provided to the public and news media as
(})
they become available.
I l
l l
l I
Prepared by:
l Reviewed by:
Approved by:
(Emergency Manager or l
Emergency Coordinator)
AP 569.1 Page 5 of 5
~
Effective Date:
11/10/81
()
ATTACHMENT 7.2 MEDIA NOTIFICATION LIST WIRE SERVICE TELEPHONE NO.
IF NO ANSWER Associated Press 448-9555 (415) 621-7432 or (213) 746-1200 United Press International 445-7755 RADIO TELEPHONE NO.
IF NO ANSWER KGNR 441-5272 444-0752 or et7-KGNR KFBK 929-5325 924-3222 KRAK 482-7100 483-3327
,,,s
.KJ0Y (Stockton)
(209)466-2844 (209) 948-8434
~
KXOA 446-4965 446-6690 KSFM (Woodland) 422-1025 KR0Y 441-4950 TELEVISIO1 TELEPHONE NO.
IF NO ANSWER KCRA TV (3) 444-7316 K0VR TV (13) 927-1313 925-4483 KTXL TV (40) 454-4548 KXTV TV (10) 441-2345 446-3945 NEWSPAPERS TELEPHONE NO.
IF NO ANSWER Sacramento Bee 446-9611 Sacramento Union 442-7811 rg Chronicle (San Francisco) 445-5658 (415) 777-7100
(_/
AP 569.2 Page 1 of 1
O Effective Date:
11/10/81 ATTACHMENT 7.3 PUBLIC INFORMATION NEWS RELEASE FORM (Date ano time of news release)
O Prepared by:
~
O Approved by:
(Emergency Manager or Emergency Coordinator)
AP 569.3 Page 1 of 1
Effective Date:
11/10/81 gs.
V ATTACHMENT 7.4 f
HARD COPY NEWS RELEASE DISTRIBUTION LIST b
Insure hard copies of all news releases dealing with the energency situation at the Rancho Seco site are distributed to the following personnel / activities:
1)
Emergency Operations Facility (EOF) 2)
Technical Support Center (TSC) 3)
Media Center
/
4)
San Joaquin County 5)
Sacramento County 6)
Amador County 7)
Xerox Copies to be made available to members of the press.
l
(:)
t
,1 l
l
\\
i l
l l
s (2) j r
AP 569.4 Page 1 of 1 I
-