ML20039B849

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revision 1 to Emergency Plan Implementing Procedure 1904.02, Magnitude of Release - Unit 1.
ML20039B849
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/28/1981
From:
ARKANSAS POWER & LIGHT CO.
To:
NRC
Shared Package
ML20039B848 List:
References
NUDOCS 8112240022
Download: ML20039B849 (1)


Text

- ,

7 ARKANSAS POWER & LIGHT COMPANY A ch

[~'I: E Arkansas Nuclear One TIT m TRANS!!ITTAL l FORM NO. 1013.02H Arkansas Nuclear One Russellville, Arkansas Date 7_ , p _ q 3_

MEMORANDUM TO: HOLDERS OF SERIES 1904 -

MAGNITUDE of RELEASE PROCEDURES - UNIT 1 PROCEDURES 1904.01 -- 1904.XX FROM: ANO DOCUMENT CONTROL

SUBJECT:

ANO MASTER PLANT MANUAL The procedures, revisions, permanent changes, and/or temporary changes listed below have been / uld be / /placed in your set of the plant manual.

PROCEDURE # REV. # PERM. CHG. # TEMP. CHG. # PROCEDURE TITLE

-4

) 1904.02. 1 Magnitude of Release -

Unit 1 COPIES T0:

w/o att: Vord Processing - '

w/att: 1-Control Room - Unit 1 92-Training - NSC 3-Control Room - Unit 2 93-Ops. Tech.

6-Ops. Maint. Mgr. 100-NRC Region 10-Mgr. Special Projects 101-NRC Region 14-Plant Admin. Mgr. 102-NRC Region 19-Tng./Coun. Supv. 103-NRC Washington 27-Engr./ Tech. Supp. Mgr. 104-NRC Washington )

28-Tech. Anal. Supt. 105-NRC Washington 29-Health Physics Supv. 106-NRC Washington 32-Asst. Health Physics Supv. 107-NRC Washington 48-Planning & Scheduling 108-NRC Washington

' 59-Admin. Copy - 2nd Floor 109-NRC Washington

.[ 62-Director of Nuclear Ops. W -NRC Washington 19-Trng./Coun. Supv.

78-ANO Library 111-NRC Uashington (Vandergrift)

. 84-Emergency Planning Coord. 112 '1C Washington ll7-Mgr. Tech. Analysis (Info Only)

Updated 8112240022 811215 Clerk r PDR ADOCK 05000313 _ ___

-~

p PDR J