ML20039B841
| ML20039B841 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 11/27/1981 |
| From: | COMMONWEALTH EDISON CO. |
| To: | |
| Shared Package | |
| ML20039B839 | List: |
| References | |
| PROC-811127-01, NUDOCS 8112230644 | |
| Download: ML20039B841 (6) | |
Text
EMERGENCY PLAN IMPLEMENTING FROCEDLTnES INDEX NtNEER TITLE CATE 099-1 Reference Procedures 2-18-81 110-1 Station Director EPIP 11-10-81 120-1 Operations Director EPIP 2-18-81 130-1 Technical Director EPIP 2-18-81 140-1 Maintenance Director EPIP 2-18-81 150-1 Stores Director EPIP 2-18-81 160-1 Administrative Director EPIP 11-10-81 170-1 Security Director EDIP 11-10-81 18C-1 Rad / Chem Director EPIP 2-18-81 190-1 Conrnunicaticns Director EPIP 2-18-81 320-1 Activation of the GSEP Station Group NOV 2 71981
{
330-1 Classification of GSEP Conditions 7-28-81 330-3 Zion Envircrrnental Surveillance Stations 2-18-81 330-4 Classification of an Incident involving Hazardous Material 2-18-81 350-1 Quick Estimate of Offsite Case from an Unplanned Release 5-21-81 360-1 Site Evacuaticn of Non-essential Personnel 2-18-81 360-2 Assembly Procedure 8-12-81 370-1 Rescue and Recovery 2-18-81 8112230644 81121E ?
PDR ADOCK 05000295.
F PDR>
APPROVED 8# ^ 2 7 0039E 1
DATE /P
- 0006A
~
ACTIVATION OF TFE GSEP STATION GROUP EPIP 320-1 TABLE OF CDNTENTS SECTION TITLE PAGE DATE REVISION Table of Contents 1
NOV 2 71981 2
Purpose 2
UGV 2 7 1981 1
References Prerequisites Precautions Limitations and Actions Procedure 3
NOV 2 7 1581 2
A T,w 2 ' :3a1 2
2 27 581 Checklists Technical Specifications References
+
l l
l 1
l This procedure contains 5 pages.
APPROVED fl h DAU "' '
1 003 %
0006A
~
w
~
~
EPIP 320-1 Rev. 1 NOV 2 7 1981 Activation of the GSEP Station Group A.
RJRPOSE The purpose of this procedure is to ensure a quick activation of the GSEP Station Group.
8.
REr~cnENCES 1.
GSEP, Figure 4.2-3 page 4-8 2.
EPIP 700-1 3.
- GSEP Telephone Directory C.
PRERE0JISITES None I
O.
PRECAUTIONS 1
None E.
LIMITATIONS AND ACTIONS Procedure to be updated quarterly by GSEP Coordinator.
e 5
~
}
00C6A w,
.-g-p--,,,,,e y
a,,-
g e,.-,
r v -
EPIP 320-1 Rev. 2 N0'l 2 7 1981 F.
FROGDURE 1.
Transportation Accident a.
Notify the Station Group (all directors) as needed dependirq won the nature of the emergency.
2.
Unusual Event a.
Call in Station Director b.
Call in Operations Director c.
Call in other Directors depending upon the nature of the emergency.
3.
Alert a.
Call in Station Director b.
Call in Operations Director c.
Call in Maintenance Director d.
Call in Technical Director e.
Call in Rad / Chem Director f.
Call in Environs Director g.
Call in other Directors depending upon the nature of the emergency.
4.
Site & General Emergency a.
Initiate the following call-out system and have perscnnel report to the station.
FO!E WORK BEEFER Shift Engineer Calls:
1.
Operating Engineer on call' R. Budowle
\\
or J. Gilmore or J. Marianyi Operating Engineer on call calls:
f 1.
K. Graesser or G. Plimi or E. Fuerst
_. --. J
~ ~.
3 0035E 000c'A
EPIP 320-1
'~
R;v. 2 NGV 2 7 1581 FROECURE (Cont'd)
FOhE WORK EEEFER K. Graesser calls:
1.
G. Pliml or A. Miosi or L. Pruett 2.
R. Budowle or E. Fuerst or J. Gilmore or J. Marianyi 3.
K. Kofron or J. Lafontaine or R. Rafter G. Plimi calls:
1.
A. Miosi or L. Pruett or P. LeBlond 2.
O. Howard l
or B. Schramer or P. Zwilling 3.
R. Smith 4.
M.A. LePage or M. Haru n or L. T:Szile 5.
F. Jchnson I
E. Fuerst calls:
l.
R. Budowle 2.
J. Gilmore 3.
J. Marianyi K. Kofron calls:
l.
G. Dix 2.
R. Rafter 3.
W. Kurth 4.
J. Lafontaine 5.
G. Harten or T. Saksefski l
i
~
i
- eO W 0035E
.A C006A 4
~
~
EPIP 320-1 Rev. 2-NOV 2 7 581 FROCECURE (Cont'd)
FCME WORK EEEPER A. Miosi calls:
1.
L. Pruett 2.
P. LeS1cnd i
3.
N. Valos 4.
A. Ockert (G.L.)
or J. Wennerholm 5.
T. Printz or R. Marsh 6.
E. Campbell (G.L.)
i or S. Hazelrigg 7.
W. T'Niemi (G.L.)
I or R. Chin 8.
W. Dean 9.
C. Silich (G.L.)
i 10.
R. Cascarano (G.L.)
11.
W. Lowe 1
12.
C. Laureys 13.
A. Amoroso
\\
Each Group Leader (G.L.) calls his assistant
(
s D. Howard calls:
1.
- 8. Schramer i
i 2.
P. Zwilling 3
F. Rescek 4.
F. Ost 5.
R. Aker M.A. LePage calls:
1.
M. Hansen 2.
L. Trezise G. Harten calls:
1.
T. Saksefski R. Smith calls:
1.
L. Trezise G.
CHECXLISTS
~
~~--
~
mm H.
TECWICAL FCECIFICATIONS AND REFERENCES None
-FIN 4L CO35E 5
CCCEA e