ML20039B840
| ML20039B840 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 12/01/1981 |
| From: | Faith Johnson, Pliml G COMMONWEALTH EDISON CO. |
| To: | NRC |
| Shared Package | |
| ML20039B839 | List: |
| References | |
| A-81-181, NUDOCS 8112230641 | |
| Download: ML20039B840 (3) | |
Text
_
i
...n
~
~ ~~
CR9 A-81-181 EPIP 320-1 #
s
__ Dec. 1, 1981 Mr.
tb $
kn)
)
Ycu have ecpy(s) No. '/ 9 cf the Zicn Staticn:
FSI - Fuel Handling Precedure SCI - Cperating Precedure ICP - E=ergency Cperating Precedure GCP - General Cperating Precedure mI MO TSS - Technical Staff Sc:veillance i
ZAP - P'-i istrative Precedure
'b!
n d
ZCP - Chemical Precedure RP - Radiatien Protecticn Precedur
( k
'd I ig 9I MI - Maintenance Precedure Cj O d
-j N kf,bs ZQP - Zica Quality Precedure L
b
/A h./
ACP - Abnc==al Cperating Prccedure A
ZSP - Security Plan & Secg.ty Prccedure PT - Cperating Surveillance Test N
Tech Spec. - Technical Specification Ds N
Curve 3cek
~*
Annunciator Respense Manual GSEP - Generating Statics EmerRefueling Master Precedure 1 Fue EPIP - Energency Plan Implenen*gencf-Precedure
't ing Precedure FSAR - Final Safet*f Analysis Report ZED - Zion Electrical Distributien indgated above and return this receipt te Ms. M APlease ac.6cw sta _cn.
.. I.ePage, Zicn
- Please revise per attached changes to EPIP Index, p<r.
1, EPIP 320-1, pgs. 1 thru 5.
Rev. 1 & 2.
Nov. 27, 1981
/
/
h G. P1-t 6
Procedure er revisiend indicated above received:
Date f
0 h2 41 01121s" F
K 05000295
_ PDR-
~
b eeg Mr
......mwM*'" ' " "
- e,--y w v
---.vT T
'"'*-T TV-'-**--"*-'1=v'
- ' * " F "W-*
r
"""'-et"
-?"tv'
"-':"--"3-F-^**"1""-*--""--"t-T
"-"'T
- 7~TY-'
g6
~
4.-k ZAP S 514 8"4 0
STATION PROCEDURE CHANGE REQUEST"""
ll-zo -7/ tak.
Precedure intent changes require Station Revieve before using.
CHANGE y;
7 g Procedure changes with prict Statico Review do not need SRO approval.
REQUES g [ -f j
/M/d PROCEDURE TITLE add V477d4/ 88 72/F [78/8 NUMBER O" /
fm77on/ C,2 cup
""U*
Permanent Change
[
New Procedure O
Special Procedure O
Desired Elfective g,/ /p Permanent Change Needed 9
g,,,
Yes O No O Brief Description bM MI 4/IAdMO i
1 t
Reason for change MN M
i
/
f$W5 //VN0$$$
~
l Requested By MN Date !/
Department Y
Temporary Change Approval (No intent change,14 days review)
Dept. Supervisor Date SRO Date FORM 5 514 Station Review Copy
.,o Is a 'hange to the Technical Specifi ations needed?
Yes No c
Is the probability of an occurrence or the consequence of an accident or c:alfunction of equipment important to fty as previously evaluated in the SAR increased?
Yes No Because:
)p Cf M W #
M 4M
- 4 Is the possibility for an accident or malfunction of a different y than any previously evaluated in the SAR created? Yes No Because:
h M A.-
Is the margin of safty, as defined in the basis for any Technical Specification, reduced? Yes No V Because:
Ms b 's
[{
/c /
Prepared By f
~~
Date N
Temporary Review Pemanent Review Signature Date Appr[
Not Appr.
S tu Date Appr. Not Appr.
bl# h. h M/n/// $
1
~
~
O O
YEN mWa 0-l v
r.
l C
0 I
Station Superintendent:
O O
If not appro d, explain:
JA W TfW
//-L7-U Effective Date Station Superintendent Appr. Date (if different from (Appr. for pem, use) appr. date) l
.