ML20039B772

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-348/81-26 & 50-364/81-29 on 811016-1113.No Noncompliance Noted
ML20039B772
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/27/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20039B773 List:
References
NUDOCS 8112230541
Download: ML20039B772 (2)


See also: IR 05000348/1981026

Text

<

.

n

.

6. l lDN

NOV 2 71981

t-

e

5)

%

Alabama Power Company

g

eggEli/EO

ATTfl: fir. R. P. ficDonald

C

Vice President-Nuclear Generation

OEC

'

M ISB/,w t

P. O. Box 2641

-

, %er,O, lgge7

%

II

Birmingham, AL 35291

Gentlemen:

ps

'P

'47T '

Subject:

Report flos. SQ48/81-hnd 50-364/81-29

This refers to the routine inspection conducted by ftr. W. H. Bradford of this

office on October 16 - flovember 13, 1981, of activities authorized by fiRC

Operating License flos. fiPF-2 and NPF-8 for the Farley facility and to the

discussion of our findings held with fir. W. G. Hairston, Plant fianager, at the

conclusion o.f the inspection.

Areas exanined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations vere disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will be placed in the flRC's Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter.

Such application must be consistent with the requirements

of 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

!

Paul J. Kellogg, Chief

Reactor Project Branch 2

Division of Resident and

Reactor Project Inspection

Enclosures:

Inspection Report flos. 50-348/81-26

_

and 50-364/81-29

cc's see page 2

5112230541 011127

gDRADOCK 05000348

PDR

S f'Aol

/

'

-

..

.

.

w

2

NOV 2 7 B81

. Alabama Power:and Light Company

cc w/ encl:

W.- 0. Whitt, Executive Vice President

F. L. Clayten, Jr., Senior Vice President.

.

H.' O. Thrash, General Manager-Nuclear Generation

.

0. D. Kingsley, Jr., fianager, Nuclear Engineering

and Technical Services

J. W. ficGowan, Manager-Safety Audit

and Engineering Review

W. C. - Carr, Supervisor-Safety Audit

and. Engineering Review

W. G. Hairston, III, Plant Manager

bec w/ encl:

~NRC Resident Inspector

Document fianagement Branch

State of Alabama

'

v

[/ 1B

ord:dt

JRogge

VBrown ee

-PJK

ogg

11/y7/81-

11/g/81

11/p//81-

11/g 81-