Forwards IE Insp Rept 50-309/81-26 on 811006-1110 & Notice of Violation
ML20039B692
Person / Time
Site: Maine Yankee
Issue date: 11/30/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Groce R
Maine Yankee
Shared Package
ML20039B693 List:
References
NUDOCS 8112230428
Download: ML20039B692 (2)


See also: IR 05000309/1981026

Text

-

.

,

. t

'

):- D-ti

,

,

^

3 0 NCV 1981

1

-

,

,

i

~3

^

'

.

.

.

4

.

,

,-

2 .-

-s

a

>

'#

w

Docket No. 50-309

- ~

'

.

. '

&

g -

.

>

.

,

8

Maine Yankee Atomic Power Company

g

.

.

gECefp D

ATTN: Mr. Robert H. Groce

7

'

-

&

Senior Engineer - Licensing

Ogg

@

1671 Worcester Road

,

Framingham, Massachusetts 01701

fen,,. 82 7pg7

L

8ig-

/

Gentlemen:

W

Subject;

Inspection 50-309/81-26

This refers to the routine safety inspection conducted by Messrs. P. Swetland

and W. Lazarus of this office on October 6 - November 10, 1981 at Maine Yankee

Nuclear Power Station, Wiscasset, Mair.e of activities authorized by NRC License

.

'

No. DPR-36 and to the discussions of our findings held by Mr. P. Swetland with

Mr. E. Wood of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection -

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

.-

and representative records, interviews with personnel, and observations by the '

inspector.

-

Based on the results of this inspection, it appears that certain of your activities '

were not conducted in full cmpliance with URC requirements, as set forth in the ~

Notice of Violation, enclosed herewith as Appendix A.

These items of noncompliance.

have been categorized into the levels described in the Federal Register Notice 4 -.i

-

(45 FR 66754) dated October 7,1980. You are required to respond to this letter

and in preparing your respense, you should follow the instructions in Appendix A.

.

a

_

=

._

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of thisf .. "~'

letter and the enclosures will be placed in the NRC's Public Document Room.. _ Ifr

this report contains any information that you (or your contractors) believe to be .

exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you '(a), notify -

'

this office by telephone within ten (10) days from the date of this ietter of

-'

your intention to file a request for withholding; and (b) submit with.'n'25 days

'

'

from the date of this letter a written application to this office te withhold <

>

such infomation. _ Consistent with section 2.790(b)(1), any such application M .

.

must be accompanied by an affidavit executed by the owner of the information which

-

identifies the document or part :ought to be withheld, and which contains .a ful1 '

f

,

,.

g,

,

.

,.

OFFICIALRECORDCOPi-

~

I

-

, .

'l

_

l

'

$

o!000

.

hy

OFFICE > _ DRPIJ1An

.0RPI_ ,1 A

,0RMA

DRPI 1A

DETI'EIB'

,RI:DyTI.f7d.

. . . _

.

TURNAME>

SWETLAN

LAZ

BR N R

CH U ARY

'

,

7 /['/


G)d

_______

- [ '[-

'

h 23 $j

p

DATE > __l,l/_16/81

___

.

_

. .

.

.

Maine Yankee Atomic Power

2.

3 0 F "" ""

Company

.

statement of the reasons on.the basis which it is claimed that'the information

should be withheld from public disclosure. This section further requires the

statement to address with specificity the considerations listed in 10 CFR 2.790

-(b)(4). The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified periods noted above, the report will be placed

in the Public Document Room. The telephone notification of your intent to request

withholding, or any request for an extension of the 10 day period which you

'believe necessary, should be made to the Supervisor, Files, Mail and Records,

~

USNRC Region'I, at (215) 337-5223.

Should you have any questions concerning this inspection, we.will be pleased

- to discuss them with you.

Sincerely,

Original Signed Byt

Eldon J. Brunner, Chief, Projects

Branch No. 1, Division of Resident

and Project Inspectior.

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Number 50-309/81-26

cc w/ enc 1:

E.- Wood, Plant Superintendent

E. W. Thurlow, President

.

J. H. Garrity, Director, Nuclear Engineering.& Licensing

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear-Safety Information Center (NSIC)

NRC Resident Inspector

'

State of Maine

bec w/ encl:

RegionIDocketRoom(withconcurrences)

Chief, Operational Support Section (w/o encis)

0FFICIAL RECORD COPY

,

a

-