ML20039B369

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Amend 11 to License NPF-8
ML20039B369
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/03/1981
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20039B362 List:
References
NUDOCS 8112220588
Download: ML20039B369 (2)


Text

.-

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION

^

DOCKET NO. 50-364 ALABAMA POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No.11 to Facility Operating License No. NPF-8 issued to Alabama Power Company (the licensee), which revised Technical Specifications for operation of the Joseph M. Farley Nuclear Plant, Unit No. 2 (the facility) located in Houston County, Alabama. The amendment was effective on October 12, 1981.

The amendment modifies the Technical Specifications.to allow one-time temporary relief from diesel generator operability and surveillance frequency requirements for three days during repairs to diesel generator 1-2A.

The amendment was authorized on an expedited basis to maintain the plant at a steady-state condition and avoid a shutdown transient shown by our evaluation to be unnecessary but required by Technical Specifications unless amended.

~

The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.

P,ri or public notice of this amendment was not required since this amendment does not involve a significant hazards consideration.

. 8112220598 811203 PDR ADOCK 05000364 P

pop

7590-01 4

_2-The Commission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR 351.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.

For further details with respect to this action, see (1) the request for amendment dated October 12, 1981, (2) the Commission's letter to the licensee dated October 13, 1981, (3) Amendment No. 11 to License No. NPF-8 and (4) the Commission's related Safety Evaluation.

All of these items are available for public inspection at the Commission's Public Document Room, 1717 H Street, N. W., Washington, D. C. and at the George S. Houston Memorial Library, 212 W. Burdeshaw Street, Dothan, Alabama 36303. A copy of items (2), (3) and (4) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D. C.

20555, Attention:

Director, Division of Licensing.

Dated at Bethesda, Maryland, this 3rd day of December 1981.

ORtTHE NUChEAR ',EGULATORY COMMISSION i l.

(, \\

I

,:even A(. Varg, Chi f L

I i

Operating Reactors nch No. 1 Division of Licensin a