Forwards Request for Addl Info Re Degraded Grid Protection, Including Description of Program to Assure Reliability & Availability of Main Control Room Info Sys.Info Requested within 30 Days
ML20039B020
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/24/1981
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
References
LSO5-81-11-060, LSO5-81-11-60, NUDOCS 8112220190
Download: ML20039B020 (3)


Text

_ _. -. _ _ _ _ _ _ - - _ - _ - - - _

DISTRIBUTION Docket

/ g,g)

NRC PDR

-('

November 24, 1981 Local PDR ORB Reading g

NSIC DCrutchfield

\\

Docket !!o. 50-213 HSmith 8

[hS NL!ly r

\\

LS05-81 060 -

WPaulson D

SNowicki f

geg 7 IS S I A -10c OEld m

OI&E (3) k **' Q Quacts.h ACRs (10) b y}/

d/

h PC ck tir. W. G. Counsil, Vice President RPrevatte t Nuclear Engineering and Operations (d

Connecticut Yankee Atomic Power Company p7.cwc#u Post Office Box 270 y

s,g.._

Hartford, Connecticut 06101

Dear fir. Counsil:

SUBJECT:

DEGRADED Gx10 VOLTAGE PROTECTIO!! FOR HADDAfl NECK He are continuing our review of the captioned matter and request that you respond to the enclosure to this letter. Your response #is requested within 30 days of your receipt of this letter.

Sincerely, ORIGINAL SIGNED BY Thomas V. Uambach for/

Dennis M. Crutchfield, Chief Operating Reactors Branch #5 Division of Licensing

Enclosure:

As stated cc w/ enclosure:

See next page

' b-w C<.y.

/- h~-

g' r

ys :.,.,- f c t, .*<u,,,,

r.

o Sk

)

I C

(

itsancal.

V, 1

8112220190 811124 PDR ADOCK 05000213

/

P PDR

/

, q/m/

h,,,k,5,, p,L;h..f51..DL.[0RB.5..

l)[;

omcc, D.L.i 0RR #5 us A..,,,...,,&.

b..

waaa n...

0.C.r.utaae.l.a pc 1......

.e _ e>

..l.f$i...d.k

..)

..J.}....}.$.[...../l oare )

NRC FORM 318 (10-80) NRCM 0240 -

OFFICIAL RECORD COPY USGM 1981-335 960

y Mr. W. G. Counsil November 24, 1981 cc Day, Berry & Howard Counselors at Law One Constitution Plaza Hartford, Connecticut 06103 Superintendent Haddam Neck Plant RFD #1 Post Office Box 127E East Hampton, Connecticut 06424 Mr. Richard R. Laudenat Manager, Generation Facilities Licensing Northeast Utilities Service Company P. O. Box 270 Hartford, Connecticut.06101 Russell Library 119 Broad Street Middletown, Connecticut 06457 Board of Selectmen Town Hall Haddam, Connectice't 06103 Connecticut Energy Agency ATTN:

Assistant Director Research and Policy Development Departnent of Planning and tnergy Policy 20 Grand Street Hartford, Connecticut 06106 U. S. Environmental Protection Agency Region 1 Office ATTN: Regional Radiation' Representative JFK Federal Building Boston, Massachusetts 02203 Resident Inspector Haddam Neck Nuclear Power Station c/o U. S. NRC East Haddam Post Office East Haddam, Connecticut 06423 N

9

I a

ENCLOSURE w.

DEGRADED GRID PROTECTION p;

REQUEST FOR ADDITIONAL INFORMATION a

HADDAM NECK l

1.

A listing of all Class lE equipment that may be running,or ma'y automatically start and the interval of time that these equipment wil.1 be exposed to a degraded voltage under all plant conditions of operation.

2.

Manufacturers' data or appropriate testing to assure that no damage to these '

Class lE equipment (i.e., motors, control circuits, fuses, etc) will occur and that.they will be able to meet the system functional requirements during the interval of exposure to a degraded voltage condition. The degraded voltages will include levels down to the loss of grid voltage relay.; (first level) which will provide automatic disconnection from the the degraded power source.

3.

Description of the information system provided in the main control roodi for the operator to follow the course of the transient and take necessary corrective action to ensure that Class lE equipment are not damaged.

4.

Description of the operator training and plant operating procedur_es instituted to ensure-that the operator will make appro?.-iate and prompt decisions to ccpe with this transient.

5.

Description of a program to assure the~ reliability and' availability of l

the information system, referred to in item 3 abov,e.