Issue date: 05/20/1981
From: Ohanlon J
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML20039A928 List:
References
PROC-810520, NUDOCS 8112220009
Download: ML20039A932 (11)


Text

) ,

ARKANSAS POWER & LIGHT COMPANY gg Aricansas Nuclear One nrrnne or nerrTTnNS To STATION PROUDlIRES FORM NO.

1013.02t!

Procedure Number i O5- Revision Number 1 Procedure Title /6 69/w ME/eJnod d>#%4 4/uo

& b W & % N & W 6 (.) & ' f Y / U Comments: SklA06~() S by /f05, 3f

(

Recommended for deletion:

~ ' Dbpa rtment fl. nager Date 5/bl]I $ /l

/

w Date

' P3C, Chaltman (if applicable)

/ /

Approval for del tion:

Date L T' * ? )

() _

General llanager i

8112220009 811215 PDR ADOCK 05000313 i .F PDR

f ARKANSAS POWER & LIGHT COMPANY

/ .

Arkansas Nuclear One O DIERGENCY PLAN PROCEDURE FORM 1000.06A

'., DIERGENCY ACTION LEVEL RESPONSE

+,CM g j 1903.10 REV. 1 4 E k  !

,;s u&n~%ohQnubwe I][

w ;t UN -(O u h

  • RECORD OF CHANGES AND REVISIONS PAGE REVISION CHANGE PAGE REVISION CHANGE PAGE REVISION CHANGE 1 0 19 1 37 0 2 0 20 0 38 0 3 0 21 0 39 1 4 1 22 0 40 1 5 0 23 0 41 0 0 6 0 24 0 42 1 7 0 25 0 43 1 8 0 26 0 44 0 9 0 27 ~0 45 0 10 0 28 1 46 0 11 1 29 1 12 0 30 0 13 0 31 0 14 0 32 0 15 0 33 0 16 0 34 0 17 0 35 0 18 0 36 _

0 APPROVED BY:

APPROVAL DATE cu-a -

ur Y/7/P)

PLANT MANUAL SECTION: PROCEDURETWORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10

-w PAGE 4 of 46 U ARKANSAS NUCLEAR ONE REVISION CHANGE 1 DATE DATE 4/8/81 6.0 UNUSUAL EVENT 6.1 Classification Criteria 6.1.1 Projected summed releases from either unit exceed 1MPC for one hour at the site boundary assuming annual average X/Q and actual wind speed.

6.1.2 Abnormal RCS Conditions:

A. Margin to saturation of the RCS as indicated on margin-to-saturation meters or as calculated is less than 20 F for greater than 5 minutes.

B. RCS steady-state I l31 dose equivalent activity in excess of the allowable Technical Specification limit.

C. Failure of the pressurizer relief valve to re-close after lifting.

D. Plant transients which result in emergency core cooling systems actuation.

t sj 6.1.3 Ongoing security compromise on site, but outside the Protected Area Security Fence. Attempted entry or sabotage which has been stopped before an Alert, Site Emergency or General Emergency can be declared.

6.1.4 Rapid depressurization of the steam generator secondary system which results in automatic steam generator secondary isolation.

t l

6.1.5 Reactor shutdown required by the Limiting Conditions for Operation of the unit's Technical Specifications. .

6.1.6 Locs of ability to assess off-site radiological doses, or loss of radio communication with off-site agencies.

6.1.7 The occurrence of other unusual events:

A. Fire in a vital area not under control within 10 minutes.

l B. Aircraft crash onsite.

C. Train derailment onsite.

l D. Explosion on site resulting in equipment damage and/or personnel injury requiring hospitalization.

[)

E. Toxic or flammable gas release onsite or affecting the site which requires a plant evacuation. ,

1 l

l

i PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 11 of 46 O3 ARKANSAS NUCLEAR ONE aevision GHANGE i o*TE DATE 4/8/81 7.0 ALERT 7.1 Classification Criteria 7.1.1 Projected summed releases from either unit exceed 10 times MPC for one hour at the site boundary assuming annual average X/Q and actual windspeed.

7.1.2 Abnormal RCS conditions:

A. Margin to saturation of the RCS as indicated on in-stalled instrumentation or as calculated is less than 20 F for 10 minutes with no indication for immediate re-covery.

B. RCS I II dose equivalent activity is greater than 100 pCi/gm.

C. RCS leakage is greater than normal makeup capacity.

D. Inability to make or maintain the reactor subcritical when intended.

(G 'j 7.1.3 Ongoing security threat within the protected area security fence, but outside of plant buildings.

7.1.4 Evacuation of the Control Room required.

7.1.5 Loss of all redundant means of core cooling.

7.1.6 All safety-related annunicators lost for more than 5 min-utes when above cold shutdown.

i l 7.1.7 The occurrrence of other unusual events:

1 A. Earthquakes resulting in 0.lg trigger alarms actuation.

1 i B. Lake Dardanelle level is greater than or equal to 350' (above sea level) 7.1.8 Radiation levels at two or more area radiation monitors in the Reactor Building increase by 2,000 mR/hr, or radiation levels at two or more area radiation monitors in the Auxi-liary Building or the Fuel Building increase by 100 mR/hr due to a severe degradation in the control of radioactive materials.

O V

i l

PLANT M ANUAL SECTION: PROCEDUREfNORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 19 of 46 O ARKANSAS NUCLEAR ONE aevisiOu CHANGE 1 onTe DATE 4/8/81 8.0 SITE EMERGENCY 8.1 Classifications Criteria 8.1.1 Projected summed off-site dose rates from either unit exceed SmR/hr whole body or 25 mR/hr thyroid dose rate assuming annual average X/Q and actual wind speed.

8.1.2 Installed instrumentation or as calculated indicates the RCS is in a saturated condition.

8.1.3 Ongoing security threat within plant buildings, but not within the Control Room or vital areas.

8.1.4 Evacuation of the Control Room required and control of systems required for maintaining the unit in a safe condition cannot be established.

O V

l ,

O V

PLANT M ANU AL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY M PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 28 of 46 O ARKANSAS NUCLEAR ONE REVISION CHANGE 1 DATE DATE 4/8/81 I

~

. ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One TITLE rmerrsev v7 yny y err t_ orepngqy l FORM NO 9 jg REV. # 1 PC #

rage 1 ot .

SITE EMERGENCY DUTY EMEPGENCY COORDINATOR Notification List and Record DATE INITIALS / TIME

1. Notified that Site Emergency Emerge cy Action Level has been /

declared, based on the following conditions (List):

.-- so m . .,y.3 t-i -- -- ; m_ ._

O 2. Record time that the Shift Operations Supervisor was relieved /

of Duty Emergency Coordinator responsiblities.

3. Assign an individual to maintain a log of Emergency Response /

Grganization personnel as they report to the Technical Support Center, or Emergency Control Center.

4. Consider declaring a Plant Evacuation and limiting /

access to the site.

l S. Dispatch the Of fsite Radiological Monitoring Section of /

! the Emergency Radiation Team to assess the effects of the situation on the environment.

s

6. If a radiological release is involved:

6.1 Verify that appropriate personnel to perform the calcul- /

lations per 1904.02 (2904.02), ," Magnitude of Release -

Unit 1 (2)"

6.2 Relieve the Shif t Operations Supervisor of the responsibi- /

" " lities for calculating tac magnitude of radiological ,_;--_ _,

release.

7. khen the Recovery Manager is available onsite, transfer respon- /

sibility to him for direction of corrective and recovery actions.

8. khen the Site Security Coordinator is available onsite, transfer /

responsiblity to him for direction of the Emergency Evacuation Team.

9. When the Emergency Services Coordinator is available onsite, /

transfer responsability to him for direction of the Emergency Fire Team and Emergency Medical Team.

9 O

I

~

PLANT MANUAL SECTION: PROCEDURElWORK PLAN TITLE: NO-EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 '

PAGE 29 cf 46 O ARKANSAS NUCLEAR ONE aEvisioN CHANGE 1 DATE DATE 4/8/81 I

' =~ ~ ~ ~ ' ' ' "

{*j . ARKANSAS POWER & LIGHT COMPANY

- '~

. ummu Arkansas Nuclear One

. rwecFscy wTinN rnTt ptsposst l FORM NO. j ng _ g rLEV. # 1 PC #

Page 2 of 2 Date INITIAL / TIME

10. When the Health Physics and Chemistry Superinte-dent is avail- /

able onsite, transfer responsibility to him for direction of the Emergency Radiation Team.

11. When all Duty Emergency Coordinator responsiblities have been /

transferred to the Emergency Response Organization, as explained in steps 6 through 9 above, notify the Recovery Manager.

12. Turn over this Notification List and Record, and other pertinent /

"'**' W4 documents and notes to the Recovery Manager. '"~' " '- '-

t b/ DUTY EMERGENCY COORDINATOR 1

I h ** d'ir4 _ . _.

_2 b

l l

b) v

^

l

~

PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 ' '

PAGE 39 of 46 ARKANSAS NUCLEAR ONE REVISION CHANGE 1 DATE DATE 4/8/81 I

.s..~.. .

, ARKANSAS POWER & LIGHT COMPANY -

7 - Arkansas Nuclear One

  1. ~E F5crENCY ArTION IFVFL PTSPONSE 1901.10L f ". "# 1 REV PC f Ltaticu La.htatt rage i ot Z DUIY EMERGENCY COORDINATOR Notification List and Record DATE INITIALS / TIME
1. Notified that General Emergency Emergency Action Level has been /

declared, based on the following conditions (List):

W: -W 2. Record time chat the Shif t Operations Supervisor was relieved / - w. ~

of Duty Emergency Coordinator responsibilities.

f 3. Assign an individual to maintain a log of Emergency Response /

Organization personnel as they report to the Technical Support Center Operations Support Center, or Emergency Control Center.

4. Consider declaring a Plant Evacuation and limiting access /

to the site.

5. Dispatch the Of fsite Radiological Monitoring Section of the /

Emergency Radiation Team to assess the effects of the situation on the environment.

6. 'If a radiological releste is i>. olved:

6.1 Verify that approp.iate personnel to perform the cal- /

culations per 1904.02 (2904.02), " Magnitude of Release - ,

Unit 1 (2)".

6.2 Relieve the Shif t Operations Supervisor of the respon- /

sibilities for calculating the magnitude of radiological release procedures 6.3 If an Area Evacuation is deemed necessary, contact one of /

%  % the following groups (call in tbe order indicated until con- , -- m tact is made): _

6.3.1 State Of fice of Emergency Services s

w. _

6.3.2 Arkansas Nuclear Planning & Response Program

)

6.3.3 ATPropriate County Sheriff (Refer to Attachment 61,

" Emergency TeIrphone Numbers" for phone numbers).

p i e e

  1. *E= .*a.
  • e .

O

PLANT M ANUAL SECTION: PROCEDUREN!ORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 '

PAGE 40 of 46 Os ARKANSAS NUCLEAR ONE aevisiDN CHANGE 1 DATE DATE 4/8/81 r

r. ARKANSAS POWER & LIGHT COMPANY F

M Arkansas Nuclear One TITLE. , ,g, l FORM NO. 9g jg

,, ,q p REV. # PC #

Fage 2 of 2 DATE INITIALS / TIME

7. Wen the Recovery Manager is available onsite, transfer /

responsibility to his for direction of corrective and recovery actions.

8. When the Site Security Coordinator is available onsite, transfer /

responsibility to him for direction of the Emergency Evacuation Team.

9. Wen the Emergency Services Coordinator is available onsite.

"" "W transfer responsibility to him for direction of the Emergent)

/

"- =- '

Fire Team and Emergency Medical Team, t 10. When the Health Physics and Chemistry Superintendent is avail- /

U able onsite, transfer responsibility to him for direction of the Emergency Radiation Team.

11. Wen all Duty Emergency Coordinator responsibilities have been /

transferred to the Emergency Response Organization, as ex-plained in steps 6 through 9 above, notify the Recovery Manager.

12. Turn over this Notification List and Record, and other pertinent /

documents and notes to the Recovery Manager.

DUTY E"J.RGENCY C00RIDNATOR

~-

~m - m

%:: z- -  :

.-.-~...

~

V

FLANT MANUAL SECTION: PROCEDURElWORK PLAN TITLE: NO-EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 '

PAGE 42 of 46 O ARKANSAS NUCLEAR ONE aevisioN CHANGE 1 DATE DATE 4/8/81 e

"~~~ ~

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One

  • M

"'E F N RCFNCY ACTTnN I.FVFL (FAT) NOTIFICATTnN  ! "

  • 100 3.12M REV. #1 PC #

^

l'a ge 1 o t 4 CAUTION: NOT!FICATIONS TO THE STATE OF ARKANSAS WILL REQUIRE USE OF ALT;fENTTCATION TABLES (ITEM NTMBER 11).

This is (identify yourself) at Arkansas Nuclear One with an Emergency Action Level Notification Report. Acknowledge when you are ready to proceed.

1. ( ) INITIAL ( ) FOLLOV-UP NO.
2. N/A
3. N/A
4. Date/ Time of Dec1'aration DD MON YY FJLT1
5. Unit: ( ) One ( ) Two
6. Class of EAL:

( ) A. UNUSUAL EVENT ( ) D. GENERAL EMERGENCY

( ) B. ALERT ( ) E. NONE

( ) C. SITE EMERGENCY

(']

7. Conditions Requiring EAL:
8. Areas Affected (Sectors / Distances):
9. Onsite Situatton:

A. Prognosis of Situation:

( ) Improving

( ) Stable

( ) Degrading B. General Population Protective Actions Recommended:

( ) None

( ) Shelter

( ) Evacuation C. Institutionalized Protective Actions Recommended: en- - 9

( ) None

( ) Shelter

( ) Evacuation D. r.diation Monitoring Teams Activated *

( ) Yes

( ) No E. Emergency Response Centers Activated:

( ) None ,_ _

( ) TSC ,

( ) ECC *

(v'\ .

6 4 w

~ ~

, PLANT M ANUAL SECTION: PROCEDUREN/ORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 -

PAGE 43 of 46 O ARKANSAS NUCLEAR ONE aevisioN CHANGE 1 DATE DATE 4/8/81 I

, ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One

  • rwrocevry v?Tny r etyr. (r m snTIFICATinN  ! 'U" "O' 1003.109 REV. # 1 PC #

F. Lacal Assistance Requested: #'"" A I "

( ) Fire

( ) Police

( ) Ambulance

( ) Other G. Evacuation of Onsite Personnel:

( ) Yes

( ) No

( ) Some H. Other Emergency Response Actions Underway:

sarn. *wna w w_ _-- -;

10. Message Sent By: /

NAME POSITION

11. Message Authenticated By: A B C D E F G H I J K L M N O (None) /

d INDICATE ALPHAEETICAL RESPONSI CHARACTERS CHALLENGED GIVEN

12. Type of Release:

( ) None ( ) Airborne

( ) Potential ( ) Waterborne

( ) Actual ( ) Surface Spill

13. Description of Released Material (Chemical & Physical Form, Estimate of Equivalent Curies of I-131 & Xe-133 Released, Release Rate (Ci/sec),

Iodine / Noble Gas Ratio, etc):

14. A. Wind Direction: (From)
  • B. Wind Speed: MPH

_ , , . 15. Temperature: 'F

16. Form of Precipitation:
17. Atmospheric Stability:
18. Estimated Start / Duration Time of the Release:

(START) (DURATION)

19. Dose Rate at the Exclusion Area Boundary (0.65 miles):

mR/hr ( ) Projected ( ) Child Thyroid

( ) Actual ( ) Whole Body

20. Projected Dose:

mR/hr ( ) khole Body ( ) Child Thyroid at miles  ;$ .

21. RE.tARKS :

J