Forwards IE Insp Rept 50-416/81-49 on 811026-30.No Noncompliance Noted
ML20039A032
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 11/23/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20039A033 List:
References
NUDOCS 8112160158
Download: ML20039A032 (2)


See also: IR 05000416/1981049

Text

p;g;.

I

,

h\\

NOV 2 31981

g

'

V

rif

Q

..

Mississippi Power and Light Company

2

O'

$9

'

pO

6

ATTN:

Mr. N. L. Stampley

  • f

.'__

,

,

7

Vice President of Production

-

P. O. Box 1640

0

Jackson, MS 39205

N /

Gy

//

D/ g

3.\\ Y

Gentlemen:

/

Subject: . Report No. 50-416/81-49

This refers to the routine safety inspection conducted by Mr. A. H. Johnson of

this office on October 26-30, 1981, of activities authorized by NRC Construction

Permit No. CPPR-118 for the Grand Gulf facility and to the discussion of our

findings held with Mr. G. B. Rogers, Jr. , Site Manager, at the conclusion of the

inspection.

Areas' examined during the inspection and our findings are discussed in the

' enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days frcm the date of this letter a written application to this office to

withhold such information. If your receipt of this letter has been delayed such

that less than seven days are available for your review, please notify _ this

of fice' promptly so that a new due date may be established.

Consistent with

section 2.790(b)(1), such application must be accompanied by an affidavit-

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statement of the reasons on the basis

of which it is claimed that the information should be withheld from public

i

disclosure.

This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4). The information

,

sought to'be withheld shall be incorporated as far as possible into a separate

part of .the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public Document

Room.

i

!

!

!

8112160158 911123"

PDR ADOCK 05000416'

""

f

ffo( Su 's

L

J

_.

.-

-.

^

~*~

ir[

NOV 2 31981 -

,

_

Mis'sissippi Power and Light' Company _-

2-

Should you have iny-questions concerning this-letter, we will-be glad to discuss

them with you.

Sincerely,

N

R._.C. Lewis, Director-

Division of Resident and

Reactor Project Inspection

Enclosures:

Inspection Report No. 50-416/81-49

cc w/ enc 1:

D. C. Gibbs, Vice President

~

Middle South Energy, Inc.

C. K. McCoy, Plant Manager

'

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of: Mississippi

f

<

,

-.

e

/

RII

RII.

RII

RII

RII

RII

-j

k

$

AJohnson:ht

HLWhitener

-FJape

Chpty

i

1shinski

Taylor _ R

i s

u,;,,;p

u,y,e19

u,,, es

ny,e1

ume1

1

eo ,,,;e1

i

'

-- -

._

.

__.

_ _ . _

~ _ . _

. . - -

, _ _ _

_

..

_,