ML20038D157

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1981
ML20038D157
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/01/1981
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML20038D155 List:
References
NUDOCS 8112160114
Download: ML20038D157 (3)


Text

- _ _ _

-o. ,

(, . OPERATING DATA REPORT DOCKET NO. 50-348 DATE 12/1/81 COMPLETED BY W.G. Hairston, III TELEPHONE (205) 899-5156 OPERATING STATUS 1.' Unit Name: Joseph M.-Farley - Unit 1 Notes 1) Cumulative data

2. Reporting Period: November, 1981 since 12/1/77, date of
3. Licensed Thermal Power (MWt): 2652 commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 844.6
7. Maximum Dependable Capacity (Net MWe): 803.6
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted.lf Any(Net MWe): N/A
10. Reasons For Restrictions,If Any: N/A D '

This Month Yr.-to Date Cumulative i1. Hours in Reporting Period 720 8.016 35.064

12. Number Of Hours Reactor Was Critical 0 3,799.5 20,981.8
13. Reactor Reserve Shutdown Hocrs 0 1,045.2 3.492.0
14. Hours Generator On-Line 0 3.626.3 20,329.7
15. Unit Rewrve Shutdown Hours 0 0 0'
16. Gross Thermal Energy Generated (MWH) 0 8.955.018.7 50.944.910.5
17. Gross Electrical Energy Generated (MWH) 0 _ _ . 2.817.544 .__ 16.236.952
18. Net Electrical Energy Generated (MWH) -3,834 2.620.328 15.228.078
19. Unit Senice Factor 00.0 45.2 58.0
20. Unit Availability Factor 00.0 45.2 _

58.0

21. Unit Capacity Factor (Using MDC Net) 00.7 40.7 54.0-
22. Unit Capacity Factor (Using DER Net) -

00.6 39.4 52.4

23. Unit Forced Outage Rare 00.0 21.8 10.0
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup: Fe(; uarv . 1982 J
26. Units In Test Status (Prior to Commercial Operation): Forecast Achiesed l .

INITIA L CRITICA LITY 8/06/77 8/09/77

-(* INITIA L ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 8112160114 011209 -("/77 8 DR ADOCK 05000 t

r. .

s ,s'

- a '

sn-us DOCKET NO.

UNIT 1 DAll 12/01/71 COMPLETED BY W. G. Hairston , III I

TELEPHONE (205) 899-5156 MONTl! Novembe r. 1981 -

DAY AVERAGE DAILY POWER LEVEL

  • DAY AVERAGE DAIL POWER LEVEL (MWe-Net) (MWe. Net)
l. 37 -02 2 -

gg -

3 39 ~

4 a a

5 21 ' '

6 22

.7 m, . .

23 g ;4 -

9 25- ..

10 -

26

~

gg -0_.

77 12 _o_

~

. 3 _

13 ;9 * * .

g4 30 IS - 3g -

16  ; 3 ,,

INSTRUCDONS On this form:r.hs the average daily unit power icvelin MWe-Net for each day in the reporting month. Cornpute to the neare:t whole megswatt.

- ' ~

, (9(77)  :

%Yi .

- e

.m - ..

UNIT SilU1 DOWNS AND POWER REDUCTIONS DOCKET NO. 50 '148 UNIT NAME J.M. Fa rlev-Un i t 1 DATE 12/1/81

! REPORT MONTil November,1981 COMPLETED BY W.G. Hairston TELEPif0NE (205) 899-515@III w,

c r. 's ui 5 3

.2 _e g g .s y Licensec $% g%

No. Date

{

3g  ;;

5

,, g 5 Event uT N0 o.

Cause & Correceive Action to

$:5 j di y Report # _

['3 Picvent Recurrence S

025 ,

811101 F 720 A 3 N/A EB GENERA Continued outage to repair damage to the main generator which occurred September 10, 1981.

I 2 3 4 F: Forced Reason: Method:

S: Scheduled A Equipment Failure (Explain) Exhibit G Instructions 1-Manual for Preparation of Data B Maintenance or Test 2 Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

D-Regulatory Rest:iction Event Report (LER) File (NUREG-4-Other (Explain) 0161)

E-Operator Training & license Examination F Administrative 5 G. Operational Error (lixplain)

(9/77) 11 Olher (Explain) Exhibit I . Same Source