OPERATING DATA REPORT DOCKET NO.
50-348 DATE 12/1/81 COMPLETED BY W.G. Hairston, III TELEPHONE (205) 899-5156 OPERATING STATUS 1.' Unit Name:
Joseph M.-Farley - Unit 1 Notes 1) Cumulative data
- 2. Reporting Period: November, 1981 since 12/1/77, date of
- 3. Licensed Thermal Power (MWt): 2652 commercial operation.
- 4. Nameplate Rating (Gross MWe):
860
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross MWe):
844.6
- 7. Maximum Dependable Capacity (Net MWe):
803.6
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted.lf Any(Net MWe):
N/A
- 10. Reasons For Restrictions,If Any:
N/A D
This Month Yr.-to Date Cumulative i1. Hours in Reporting Period 720 8.016 35.064
- 12. Number Of Hours Reactor Was Critical 0
3,799.5 20,981.8
- 13. Reactor Reserve Shutdown Hocrs 0
1,045.2 3.492.0
- 14. Hours Generator On-Line 0
3.626.3 20,329.7
- 15. Unit Rewrve Shutdown Hours 0
0 0'
- 16. Gross Thermal Energy Generated (MWH) 0 8.955.018.7 50.944.910.5
- 17. Gross Electrical Energy Generated (MWH) 0
_ _. 2.817.544.__ 16.236.952
- 18. Net Electrical Energy Generated (MWH)
-3,834 2.620.328 15.228.078
- 19. Unit Senice Factor 00.0 45.2 58.0
- 20. Unit Availability Factor 00.0 45.2 58.0
- 21. Unit Capacity Factor (Using MDC Net) 00.7 40.7 54.0-
- 22. Unit Capacity Factor (Using DER Net) 00.6 39.4 52.4
- 23. Unit Forced Outage Rare 00.0 21.8 10.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
Fe(; uarv. 1982
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achiesed J
l INITIA L CRITICA LITY 8/06/77 8/09/77
-(
INITIA L ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 8112160114 011209 DR ADOCK 05000
-("/77 8 t
r.
,s' s
a DOCKET NO.
sn-us UNIT 1
DAll 12/01/71 COMPLETED BY W. G. Hairston, III I
TELEPHONE (205) 899-5156 MONTl!
Novembe r.
1981 DAY AVERAGE DAILY POWER LEVEL
- DAY AVERAGE DAIL POWER LEVEL (MWe-Net)
(MWe. Net)
- l. 37
-02 2 gg -
3 39 4 ~
a a 5 21 ' ' 6 22.7 m, 23 '
g -
- 4 9 25-..
10 -
26.
gg 77
-0_.
~
12 ~
. 3
_o_
13 ;9
- g4 30 IS
- 3g 16
- 3 INSTRUCDONS On this form
- r.hs the average daily unit power icvelin MWe-Net for each day in the reporting month. Cornpute to the neare:t whole megswatt.
~
(9(77)
%Yi e
.m UNIT SilU1 DOWNS AND POWER REDUCTIONS DOCKET NO.
50 '148 UNIT NAME J.M.
Fa rlev-Un i t 1 DATE 12/1/81 COMPLETED BY W.G. Hairston TELEPif0NE (205) 899-515@III REPORT MONTil November,1981 w,
's ui 5 3
c r.
.2 _e g
g.s y Licensec g%
Cause & Correceive No.
Date
{
3g
,, g 5 Event uT
['3 o.
Action to
$:5 5
j di y Report #
N0 Picvent Recurrence S
025 811101 F
720 A
3 N/A EB GENERA Continued outage to repair damage to the main generator which occurred September 10, 1981.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance or Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Rest:iction 4-Other (Explain) 0161)
E-Operator Training & license Examination F Administrative 5
G. Operational Error (lixplain)
Exhibit I. Same Source (9/77) 11 Olher (Explain)