ML20038D157

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1981
ML20038D157
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/01/1981
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML20038D155 List:
References
NUDOCS 8112160114
Download: ML20038D157 (3)


Text

- _ _ _

-o.

(,

OPERATING DATA REPORT DOCKET NO.

50-348 DATE 12/1/81 COMPLETED BY W.G. Hairston, III TELEPHONE (205) 899-5156 OPERATING STATUS 1.' Unit Name:

Joseph M.-Farley - Unit 1 Notes 1) Cumulative data

2. Reporting Period: November, 1981 since 12/1/77, date of
3. Licensed Thermal Power (MWt): 2652 commercial operation.
4. Nameplate Rating (Gross MWe):

860

5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe):

844.6

7. Maximum Dependable Capacity (Net MWe):

803.6

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted.lf Any(Net MWe):

N/A

10. Reasons For Restrictions,If Any:

N/A D

This Month Yr.-to Date Cumulative i1. Hours in Reporting Period 720 8.016 35.064

12. Number Of Hours Reactor Was Critical 0

3,799.5 20,981.8

13. Reactor Reserve Shutdown Hocrs 0

1,045.2 3.492.0

14. Hours Generator On-Line 0

3.626.3 20,329.7

15. Unit Rewrve Shutdown Hours 0

0 0'

16. Gross Thermal Energy Generated (MWH) 0 8.955.018.7 50.944.910.5
17. Gross Electrical Energy Generated (MWH) 0

_ _. 2.817.544.__ 16.236.952

18. Net Electrical Energy Generated (MWH)

-3,834 2.620.328 15.228.078

19. Unit Senice Factor 00.0 45.2 58.0
20. Unit Availability Factor 00.0 45.2 58.0
21. Unit Capacity Factor (Using MDC Net) 00.7 40.7 54.0-
22. Unit Capacity Factor (Using DER Net) 00.6 39.4 52.4
23. Unit Forced Outage Rare 00.0 21.8 10.0
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

Fe(; uarv. 1982

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achiesed J

l INITIA L CRITICA LITY 8/06/77 8/09/77

-(

INITIA L ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 8112160114 011209 DR ADOCK 05000

-("/77 8 t

r.

,s' s

a DOCKET NO.

sn-us UNIT 1

DAll 12/01/71 COMPLETED BY W. G. Hairston, III I

TELEPHONE (205) 899-5156 MONTl!

Novembe r.

1981 DAY AVERAGE DAILY POWER LEVEL

  • DAY AVERAGE DAIL POWER LEVEL (MWe-Net)

(MWe. Net)

l. 37

-02 2 gg -

3 39 4 ~

a a 5 21 ' ' 6 22.7 m, 23 '

g -

4 9 25-..

10 -

26.

gg 77

-0_.

~

12 ~

. 3

_o_

13 ;9

  • g4 30 IS

- 3g 16

3 INSTRUCDONS On this form
r.hs the average daily unit power icvelin MWe-Net for each day in the reporting month. Cornpute to the neare:t whole megswatt.

~

(9(77)

%Yi e

.m UNIT SilU1 DOWNS AND POWER REDUCTIONS DOCKET NO.

50 '148 UNIT NAME J.M.

Fa rlev-Un i t 1 DATE 12/1/81 COMPLETED BY W.G. Hairston TELEPif0NE (205) 899-515@III REPORT MONTil November,1981 w,

's ui 5 3

c r.

.2 _e g

g.s y Licensec g%

Cause & Correceive No.

Date

{

3g

,, g 5 Event uT

['3 o.

Action to

$:5 5

j di y Report #

N0 Picvent Recurrence S

025 811101 F

720 A

3 N/A EB GENERA Continued outage to repair damage to the main generator which occurred September 10, 1981.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance or Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Rest:iction 4-Other (Explain) 0161)

E-Operator Training & license Examination F Administrative 5

G. Operational Error (lixplain)

Exhibit I. Same Source (9/77) 11 Olher (Explain)