ML20038C625
| ML20038C625 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 11/19/1981 |
| From: | Toalston A Office of Nuclear Reactor Regulation |
| To: | Tauber H DETROIT EDISON CO. |
| Shared Package | |
| ML20038C626 | List: |
| References | |
| ISSUANCES-A, NUDOCS 8112110309 | |
| Download: ML20038C625 (1) | |
Text
x u.
d af m
n
+
g, DISTRIBUTION:
Docket File v Docket No. 50-341A R
g g ggg NSIC TERA AToalston JRutberg, OELD NRR Reading Mr. Harry Tauber e
AEAB Reading Vice President-Engineering and Construction sf-fNchols The Detroit Edison Company 8
Reading 2000 Second Avenue S
i d'
[Q
$@# N Detroit, Michigan 48226 3 0
Dear Mr. Tauber:
T.d S
[7 3
ENRICO FERMI UNIT 2 q
L qi.
With reference to the operating license reil he captioned nuclear Unit, the Director of Huclear Reactor Regulation has made an I
initial finding $n accordance with Section 105c(2) of the Atomic Energy Act of 1954, as amended, that no significant (antitrust) changes in the licensee's activities or proposed activities have occurred subsequent to l
the previous review during the construction permit phase. Copies of the r
j Staff's review and a notice that is being transmitted to the Federal Register are enclosed for each of the co-applicants.
Sincerely, I
f f A.L.Tu-Jma i
Argil Toalston, Acting Chief intitrust and Economic Analysis Branch Division of Engineering Office of Nuclear Reactor Regulation
Enclosures:
l 1.
Federal Register Notice 2.
Staff Review 8112110309 811119 PDR ADOCK 05000341 M
pyg o" = >
!9.:AEAB NR
.DE 1 d
.d oasonn
- a~*
a..
. 1.s.to n...J au.
..Dau
. 1.1/.p.. /.81.1.1./. jet.81
.1.1
,/81 113...../,s1 NRC FORM 118 t10r80} NRCM O240 OFFICIAL RECORD COPY
' " "*o-a2ae24