ML20038C380

From kanterella
Jump to navigation Jump to search
Forwards PWR Moderator Dilution,Ct Yankee Atomic Power Co, Haddam Neck Plant, Technical Evaluation Rept.Time for Operator to Terminate Dilution Flow Before Criticality After Alarm Received Would Be 16.5 Minutes.Response Acceptable
ML20038C380
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/16/1981
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20038A099 List:
References
LSO5-81-11-024, LSO5-81-11-24, NUDOCS 8112100542
Download: ML20038C380 (2)


Text

..

f.$

UNITED STATts

(;

o g

2 J" 3 c, ff o NUCLEAR REGULATORY COMMISSION E

h *; M "/,.. $

N....../.

November 16, 1981 g ISTRIB TION:

Docket No. 50-213 Docket Ol&E (3)

L505-31 11-024 TRC PDR ~ ~,

ACRS (10)

~

LPDR CNelson TERA NSIC

=

,, #Mgy -Qf Mr. W. G. Counsil, Senior Vice President ORB #5 RF G

Nuclear Engineering and Operations GLainas DCrutchfield /'Ny,le"b}- W f dp V Connecticut Yankee Atomic Power Company

~ Veo

.k WPaulson

't Post Office Box 270 Hartford, Connecticut 06101 CTropf 2

HSmith NOV3 G 1931:*-

Dear Mr. Counsil:

OELD 5,

,,o

/

ccw w s y

SUBJECT:

PWR MODERATOR DILUTION - HADDAM NECK PLANT 1

y Y

7%

h/

Enclosed is a Technical Evaluation Report (TER) prepared by our trTa tpr the Franklin Research Center, addressing the potential for a moder(ato i.

dilution incident at the Haddam Neck Plant.

Based on the information provided in your submittals referenced in the enclosed TER, we find that i

there would be 16.5 minutes from the time an alarm is received for an

[

operator to terminate the dilution flow before criticality. This 16.5-i minute time satisfies the provisions of Standard Review Plan 15.4.6.

i We conclude that your response is acceptable. This completes our review F

of this issue.

f Sincerely, ORIGINAL SIGNED'BY g

. THOMAS V. WAMBACH FOR E

Dennis M. Crutchfield, Chief Operating Reactors Branch #5

/

Division of Licensing r

1

Enclosure:

Technicel Evaluation Rcport g

CC E

See next page

&=

k k.

pfj21ooS42e(([

h P

ADOCK 03 PDR l

}

[

h E..:.@.E...f.5/.f.f.9.43.9.9.. f.).l.$ !.41M f.M.!

'.{.d.@

orrier 6 p

sunuruc>.V.? a,u,),s o,9,,:,d,,,Q,M,,,. ],W,q,h,a.h,1,1,,_,

I,G,C a1 n.ag,,

c

../...T..h.a.. l.

../..[...../ /...... 81

..t....../....C/. 81..../../ /..lo/.N

~r 04n >

nne ronu sta po.eci nneu cao OFFICIAL RECORD COPY usceo. - - m m.

- - _ _. ~.- - -.

_ - ~.. =_ m

Mr. W. G. Counsil November 16, 1981 cc w/ enclosure:

Day, Berry & Howard Counselors at Law One Constitution Plaza Hartford, Connecticut 06103 Superintendent Haddam i;eck Plant RFD #1 Post Office Box 127E East Hampton, Connecticut 06424 Mr. Richard R. Laudenat Manager, Generation Facilities Licensing Northeast Utilities Service Company P. O. Box 270 Hartford, Connecticut 06101 Russell Library 119 Broad Street Middletown, Connecticut 06457 Board of Selectmen Town Hall Haddam, Connecticut 06103 Connecticut Energy Agency ATTN:

Assistant Director Research and Policy Development Department of Planning and Energy Policy 20 Grand Street Hartford, Connecticut 06106 U. S. Environmental Protection Agency Region 1 Office ATTN: Regional Radiation Representative JFK Federal Building Boston, Massachusetts 02203 Resident Inspector Haddam Neck Nuclear Power Station c/o U. S. NRC East Haddam Post Office East Haddam, Connecticut 06423

- - - _ _ - _ - _ - _ - _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _