ML20038B631

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-409/81-12. Response to Item 3c Inadequate
ML20038B631
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 12/02/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Linder F
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20038B632 List:
References
NUDOCS 8112080450
Download: ML20038B631 (2)


See also: IR 05000409/1981012

Text

e

- . -

.

Big 3

URI

Docket No. 50-409

Dairyland Power Cooperative

ATTN:

Mr. F. W. Linder

General Manager

2615 East Avenue - South

Lacrosse, WI 54601

Gentlemen:

Thank you for your letter dated September 14, 1981, informing us of the

steps you have taken to correct the noncompliance which we brought to

your attention in Inspection Report No. 50-409/81-12 forwarded by our

letter dated August 17, 1981.

Your response to item 3c is inadequate. We have reviewed your response

and the referenced purchase order documents. We were in error in includ-

ing P.O. number 67459 for the fuel racks as an example. However, quality

assurance requirements referenced in the remainder of the purchase orders

concern documentation requirements and not other essential quality assurance

program requirements as required by Criterion IV of 10 CFR 50, Appendix B,

to insure the item was manufactured to an adequate quality level. The

basic problem is how you establish the validity or meaning of the docu-

mentation supplied if you do not require the item to be built, stored

and handled in accordance with a quality assurance program. Please

revise your response to this item within 20 days of receipt of this

letter.

With respect to item 4, it is our understanding from discussions with

the Resident Inspector that you intended for the review of surveillance

data sheets to include all data sheets and not just the ones cited as

examples in the Inspection Report.

We have no further questions regarding the remaining items and will

examine them during a subsequent inspection.

y[

u&

.

,-/

f.< e ~

c

,

~

--

.% <

-9,

a

' g .!

-

O

?/

^ fr. %.,fy

,.

_

, < *

8112080450 811202

O/

DR ADOCK 05000409

5

- - - - - -

! *" - - - -

- --

--

.-

--

- - -

--

-

X -- --

-

f

'

.

.

Dairyland Power Cooperative

-2-

DEC2

ll

Your cooperation with us is appreciated.

Sincerely,

rea,.icinni Oimed b'/ C.E. !!orelius"

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

cc:

R. E. Shimshak, Plant

Superintendent

cc w/ltr dtd 9/14/81:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

.

Boiler Inspector

Stanley York, Chairman

Public Service Commission

RIII

RIli

RIII

RIII

RIII

RIII

f/ f

l$f)$h.'7

'

f

M\\

Nrbk)ius

k. :1ulz/jp

Gt daer

Eyer

Warnick

i iams

j11/4/81

f

gh(