ML20038B538
| ML20038B538 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 11/18/1981 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Rich Smith VERMONT YANKEE NUCLEAR POWER CORP. |
| Shared Package | |
| ML20038B539 | List: |
| References | |
| NUDOCS 8112080380 | |
| Download: ML20038B538 (2) | |
See also: IR 05000271/1981009
Text
-.
NOV 18 jgg;
.
Docket No. 50-271
g
eN
g
' Vermont Yankee Nuclear Power Corporation
6
d
1
(h
,y
'
ATTN: Mr. Robert L. Smith
1671 Worcester Road
-
o h' T\\
Licensing Engineer
d
B'
Framingham, Massachusetts 01701
'p
@%
_ -
,
~^Z
T @S Y '&
>
4
Gentlemen:
4
- ,/
.7
s *
~
Subject:
Inspection Report No. 50-271/81-09
'
,
,
i
This refers to the routine inspection conducted by Dr. Jin W. Chung of this
office on September 30 - October 9, 1981 at Vermont Yankee Nuclear Power
Station, Vernon, Vermont of activities authorized by NRC License No. DPR-28
and to the discussions of our findings held by Dr. Jin W. Chung with Mr. J.
Pelletier and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
'
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
.
l
Within the scope of this inspection, no items of noncompliance were observed.
l'
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
l
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
,
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
i
it is necessary that you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention to file a request for
'
withholding; and (b) submit within 25 days from the date of this letter a
'
written application to this office to withhold such information.
Consistent
with section 2.790(b)(1), any such application must be accompanied by an
affidavit executed by the owner of the information which identifies the
document or part sought to be withheld, and which contains a full statement of
the reasons on the basis which it is claimed that the information should be
withheld from public disclosure.
This section further requires the statement
to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
The information sought to be withheld shall be incorpos:ated as far as possible
,
into a separate part of the affidavit.
If we do not hear from you in this
,
i
9
RI:DETI
RI:DETI
dffI:DETI
R>WI
'
4 b . Bettenhausen ' Ebneter
a y p
Bru ner
Chung/ wc
9
i
11/9
1
94C /V/2p
g'M
Y le
I
f
j
0FFICIAL RECORD C
fW
l
.5
///
!
8112080380 811118
PDR ADOCK 05000271
G
[O0/
__ - __
- _ ____
___
_ _ _ _ _ - _ _ _ _ _ _ _ _ _
_ _ _ _ - _
.
Vermont Yankee Nuclear Power Corporation 2
regard within the specified periods noted above, the report will be placed in
the Public Document Room. The telephone notification of your intent to request
withholding, or any request for an extension of the 10 day period which you
believe necessary, should be made to the Supervisor, Files, Mail and Records,
USNRC Region I, at (215) 337-5223.
No reply to this letter is required; however, if you have any questions concerning
this inspection, we will be pleased to discuss them with you.
Sincerely,
i
Original Sianec ay.1
Eldon J. Brunner, Chief, Projects
Branch No. 1, Division of Resident
and Project Inspection
Enclosure: Office of Inspection and Enforcement Inspection
Report Number 50-271/81-09
cc w/ encl:
Mr. Warren P. Murphy, Plant Superintendent
Mr. W. F. Conway, President and Chief Operating Officer
E. W. Jackson, Manager of Operations
Mr. L. H. Heider, Vice President
Public Document Room (PDR)
Lccul Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
State of New Hampshire
State of Vermont
NRC Resident Inspector
bcc w/ encl:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encis)
0FFICIAL RECORD COPY
_ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _
_