ML20038B538

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-271/81-09 on 810930-1009.No Noncompliance Noted
ML20038B538
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 11/18/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rich Smith
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20038B539 List:
References
NUDOCS 8112080380
Download: ML20038B538 (2)


See also: IR 05000271/1981009

Text

-.

NOV 18 jgg;

.

Docket No. 50-271

g

eN

g

' Vermont Yankee Nuclear Power Corporation

6

d

1

(h

,y

'

ATTN: Mr. Robert L. Smith

1671 Worcester Road

-

o h' T\\

Licensing Engineer

d

B'

Framingham, Massachusetts 01701

'p

@%

_ -

,

~^Z

T @S Y '&

>

4

Gentlemen:

4

,/

.7

s *

~

Subject:

Inspection Report No. 50-271/81-09

'

,

,

i

This refers to the routine inspection conducted by Dr. Jin W. Chung of this

office on September 30 - October 9, 1981 at Vermont Yankee Nuclear Power

Station, Vernon, Vermont of activities authorized by NRC License No. DPR-28

and to the discussions of our findings held by Dr. Jin W. Chung with Mr. J.

Pelletier and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

'

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

.

l

Within the scope of this inspection, no items of noncompliance were observed.

l'

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

l

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you (or

,

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

i

it is necessary that you (a) notify this office by telephone within ten (10)

days from the date of this letter of your intention to file a request for

'

withholding; and (b) submit within 25 days from the date of this letter a

'

written application to this office to withhold such information.

Consistent

with section 2.790(b)(1), any such application must be accompanied by an

affidavit executed by the owner of the information which identifies the

document or part sought to be withheld, and which contains a full statement of

the reasons on the basis which it is claimed that the information should be

withheld from public disclosure.

This section further requires the statement

to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorpos:ated as far as possible

,

into a separate part of the affidavit.

If we do not hear from you in this

,

i

9

RI:DETI

RI:DETI

dffI:DETI

PI

R>WI

'

4 b . Bettenhausen ' Ebneter

a y p

Bru ner

Chung/ wc

9

i

11/9

1

94C /V/2p

g'M

Y le

I

f

j

0FFICIAL RECORD C

fW

l

.5

///

!

8112080380 811118

PDR ADOCK 05000271

G

PDR

[O0/

__ - __

- _ ____

___

_ _ _ _ _ - _ _ _ _ _ _ _ _ _

_ _ _ _ - _

.

Vermont Yankee Nuclear Power Corporation 2

regard within the specified periods noted above, the report will be placed in

the Public Document Room. The telephone notification of your intent to request

withholding, or any request for an extension of the 10 day period which you

believe necessary, should be made to the Supervisor, Files, Mail and Records,

USNRC Region I, at (215) 337-5223.

No reply to this letter is required; however, if you have any questions concerning

this inspection, we will be pleased to discuss them with you.

Sincerely,

i

Original Sianec ay.1

Eldon J. Brunner, Chief, Projects

Branch No. 1, Division of Resident

and Project Inspection

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-271/81-09

cc w/ encl:

Mr. Warren P. Murphy, Plant Superintendent

Mr. W. F. Conway, President and Chief Operating Officer

E. W. Jackson, Manager of Operations

Mr. L. H. Heider, Vice President

Public Document Room (PDR)

Lccul Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of New Hampshire

State of Vermont

NRC Resident Inspector

bcc w/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

0FFICIAL RECORD COPY

_ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _

_