Forwards IE Insp Rept 50-461/81-28 on 811026-29.No Noncompliance Noted
ML20038B534
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/25/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20038B535 List:
References
NUDOCS 8112080378
Download: ML20038B534 (2)


See also: IR 05000461/1981028

Text

- _

,

.@Vd

'

,

Docket No. 50-461

Illinois Power Company

ATTN:

Mr. W. C. Gerstner

Executive Vice President

500 South 27th Street

.

Decatur, IL 62525

Gentlemen:

This refers to the routine safety inspection conducted by Mr. C. M. Erb

of this office on October 26-29, 1981, of activities at Clinton Power

Station, Unit 1, authorized by NRC Construction Permit No. CPPR-137 and

to the discussion of our findings with Mr.;McHood and others of your staff

at the conclusion of-the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection. consisted

of a selective examination of procedures and representative records, .

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Foom.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is needssary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request-for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

.to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished-

Consistent with Section 2.790(b)(1), any such' application must

ty

S

hc /!%

b%

% % n4 %% 5,

.

q

7

N

s

. dBq,mf#

2to;

-

8112080378 811125-

PDR ADOCK 05000461

a

G

PDR-

$lt

.

_

-

.

._, .

t-

~

NOV 2 51981

Illinois Power Company

-2-

be accompanied by an;affadavit executed by the owner of the information

,

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the.

claim that the information should_be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far.as possible into a separate

part of the affadavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter?and the ecclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,.

' &L -h

. E. Norelius, Director

Division of Engineering a:,d

Technical Inspection

Enclosure:

Inspection

Report No. 50-461/81-28

cc w/ encl:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

Gary N. Wright, Manager,

Nuclear Facility Safety

Randall L. Plant, Prairie

Alliance

,

.

-

RI

F LLL

RIII

-

RIII

-

RII}/f

f

fW.

[79)./

'

i

i

qf

s tdrb/jp;

Dante son

- Reimann

orplius

< Pb /l"8 '" J

~

11/18/81

ufr4

,

_

(-)

ff -gy -gl

i

'

  1. fA5"

'

.

4

8

.

.

.

.

. .

. .

.

-

.

. .

-

m

__.._,.m._.

.

. .

.

.

. -

.

.

. .

__..._.._..__.._..______m_______,_