Docket No. 50-461
Illinois Power Company
ATTN:
Mr. W. C. Gerstner
Executive Vice President
500 South 27th Street
.
Decatur, IL 62525
Gentlemen:
This refers to the routine safety inspection conducted by Mr. C. M. Erb
of this office on October 26-29, 1981, of activities at Clinton Power
Station, Unit 1, authorized by NRC Construction Permit No. CPPR-137 and
to the discussion of our findings with Mr.;McHood and others of your staff
at the conclusion of-the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection. consisted
of a selective examination of procedures and representative records, .
observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Foom.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is needssary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request-for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
.to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished-
Consistent with Section 2.790(b)(1), any such' application must
ty
S
hc /!%
b%
% % n4 %% 5,
.
q
7
N
s
. dBq,mf#
2to;
-
8112080378 811125-
PDR ADOCK 05000461
a
G
PDR-
$lt
.
_
-
.
._, .
t-
~
NOV 2 51981
Illinois Power Company
-2-
be accompanied by an;affadavit executed by the owner of the information
,
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the.
claim that the information should_be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far.as possible into a separate
part of the affadavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter?and the ecclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,.
' &L -h
. E. Norelius, Director
Division of Engineering a:,d
Technical Inspection
Enclosure:
Inspection
Report No. 50-461/81-28
cc w/ encl:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
Gary N. Wright, Manager,
Nuclear Facility Safety
Randall L. Plant, Prairie
Alliance
,
.
-
RI
F LLL
RIII
-
RIII
-
RII}/f
f
fW.
[79)./
'
i
i
qf
s tdrb/jp;
Dante son
- Reimann
orplius
< Pb /l"8 '" J
~
11/18/81
ufr4
,
_
(-)
ff -gy -gl
i
'
- fA5"
'
.
4
8
.
.
.
.
. .
. .
.
-
.
. .
-
m
__.._,.m._.
.
. .
.
.
. -
.
.
. .
__..._.._..__.._..______m_______,_