ML20038B422
| ML20038B422 | |
| Person / Time | |
|---|---|
| Site: | Marble Hill |
| Issue date: | 11/24/1981 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Sheilds S PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA |
| Shared Package | |
| ML20038B423 | List: |
| References | |
| NUDOCS 8112080229 | |
| Download: ML20038B422 (2) | |
See also: IR 05000546/1981020
Text
.
.
Docket No. 50-546
Docket No. 50-347
Public Service of Indiana
ATTN:
Mr. S. W. Shields
Senior Vice President
Nuclear Division
Post Office Box 19C
New Washington, IN 47162
Gentlemen:
This refers to the routine safety inspection conducted by Mr. J. J. Harrison
of this office on October 1-31, 1981, of activities at Marble Hill Nuclear
Generating Station, Units 1 and 2, authorized by NRC Const.cuction Permits
No CPPR-170 and No. CPPR-171 and to the discussion of orr findings with
Messrs. Petro, Ramsett, and others of your staff at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regula*. ions, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
j N y'1&\\\\ ?[}/32
/S'v
1 /
O
, N. Q
Mc]
0
. i
s :,
f: " \\ 'sa'
f,
g ol
y-
y
g
Q' ' s &
N
)/
f '"
?
If
O
, ,.
8112080229 811124
PDR ADOCK 05000546
G
$Ec. /
- -
- - - - -
- -
- -
- -
--
-- -
- - -
---
.
.
Public Service of Indiana
-2-
g.4g
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished.
Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affadavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affadavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
'.
" Original signed by R.L. Spessarf"i
R. L. Spessard, Director
Division of Resident and
Project Inspection
Enclosure:
Inspection Reports
No. 50-546/81-20 and No.
50-547/81-20
cc w/ encl:
W. M. Petro, Executive Director
Nuclear Project Management
C. Kammerer, CA
J. H. Sniezek, IE
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
LeBoeuf, Lamb, Leiby & MacRae
Dave Martin, Office of
Attorney General
John P. Galloway, Staff Director,
Environment, Energy and Natural
Resources Subcommittee
E. P. Martin, Wabash Valley
Power Associatic,n
Thomas M. Dattilo, Save the Valley
RII
RIII
/
RIII
,
h
h b
SPES5hA>
Litt e/jp
Streeter
L a .s
g
11/24/81
il3
- -a V r/