Text
2.C.15.1 Proposed Change #88 MAIRE 'R]HARHEE Aiom/CPolilERCOMPARU*
guougraja$g$s (4) F"#9 (207) 623-3521 O
November 18, 1981
[\\ ? ' e <
FMY-81-169 g>Y '.c n f r.
(
United States Nuclear Regulatory Commission f
3 00\\' 2 3. Db _.
Washington, D. C.
20555 e-Attention:
Office of tOclear Reactor Regulation
\\ "
- T*
Givision of Licensing Q
Operating Reactors Branch #3 V
Mr. Robert A. Clark, Chief
- L. c Peferences: (a) License No. DPR-36 (Docket No. 50-309)
(b) MYAPCo. letter to USNRC, WMY 80-165, dated December 23, 1980.
(ci MYAPCo. letter to USNRC, FMY 81-65, Proposed Change No. 84, dated April 28,198'..
(d) MYAPCo. letter to U3NRC FMY 81-79, dated May 15, 1981.
(e) USNRC letter to MYAPCo. dated July 10, 1981 (f) USNRC letter to MYAPCo. dated Septenter 22, 1981, Meeting Report 50-309/81-22 (g) MYAPCo. letter to USNRC, FMY 81-162, dated October 29, 1981
Subject:
Modifications to Maine Yankee Technical Specifications Related to the Steam Line Break Analysis
Dear Sir:
Pursuant to Section 50.59 of the Commission's Rules and Regulations, Maine Yankee Atomic Power Company hereby proposes the following modifications to Appendix A of the Operating License.
PROPOSED CHAFCE:
l Peference is made to the Technical Specifications contained in Appendix A to the Operating License No. DPR-36 issued to Maine Yankee Atomic Power l
l.
Company for the Maine Yankee plant. We propose to modify these specifications as follow:
hDO$
A.
Replace pages 3.6-1 through 3.6-3 of Specification 3.6 with the y
attached revised pages 3.6-1 through 3.6-3.
l B.
Peplace page 3.10-1 of Specification 3.10 with the attached revised J.
W l
page 3.10-1.
Replace page 3.10-9 of Specification 3.10 with the attached revised l}y I
l C.
l page 3.10-9.
D.
Insert the attached page 3.10-15 into Specification 3.10.
8111240455 811118" l
PDR ADOCK 05000309 l
P PDR
M A'NE YANKEE ATOMIC POWER COMPANY U. S. Nuclear Regulatory Commission November 18, 1981 Attention:
Mr. Robert A. Clark, Chief Page 2 REASON FOR CHANGE:
Reference (c) transmitted the Core Performance Analysis Report in support of Maine Yankee Cycle 6 operation..The Core Performance Analysis Report evaluated each postulated transient and accident against certain design criteria except for the steam line break.
In Reference (d) we addressed the steam line break in a conservative fashion by demonstrating the non-limiting nature of this event early in the cycle, and by showing with a conservative bounding analysis.that return to criticality following the most limiting steam line break with the most reactive rod stuck out of the core would not occur through at least 4,000 MWD /MTU cycle burnup.
Reference (e) confirmed that additional analysis of the steam line break transient to support continued operation beyond 4,000 MWD /MTU would be required.
Reference (g) transmitted a steam line break analysis using RETRAN covering Cycle 6 operation to the end of cycle.
The results of this analysis indicate the need for certain technical specification changes to assure thet i
the core does not return critical following the most limiting steam line break at the end of cycle with the most reactive rod stuck out of the core.
These changes to the technical specifications are attached.
1 Reference (f) noted a commitment by Maine Yankee to submit a proposed change to the Technical Specifications, further improving those areas which could benefit from clarification and restructure.
This proposed change will be submitted before November 30, 1981.
In order to eliminate any confusion, the attached proposed change has been integrated with the pending proposed change.
In the proposed revised technical specification pages, revisions for clarity are denoted by single asterisks in the margin. Double asterisks jn the margin are used to show steam line break related changes. However, the steam line break related changes may be reviewed without consideration for the clarification and restructure related changes if necessary in order to expedite approval.
BASIS FOR CHANGE:
As mentioned above, the steam line break analysis, submitted in Reference (g), forms the basis for the attached changes to the technical specifications.
i The results of this analysis require changes to the available shutdown margin to assure the core does not return critical following the most limiting steam line break at end of cycle with the most reactive rod stuck out of the core.
SAFETY CONSIDERATIONS:
Based on the considerations contained herein and in Reference (g), it is concluded that this change does not constitute an unreviewed safety question.
This proposed change has been reviewed by the Nuclear Safety and Audit Review Committee and the Plsnt Operating Review Committee.
m MAINE YANKEE ATOMIC POWER COMPANY U. S. Nuclear Regulatory Commission Novenber 18, 1981 Attention: Mr. Robert A. Clark, Chief Page 3 FEE DETERMINATION:
This proposed change requires an approval that involves a single safety issue and is deemed not to involve a significant hazards consideration. For these reasons, Maine Yankee Atomic Power Company proposes this change as a Class III Amendment. A payment of $4,000.00 is attached.
SCHEDULE OF CHANCE:
These changes to the Maine Yankee Technical Specifications will be implemented upon Commission Approval. A timely review and approval of this submittal consistent with our achievement of a cycle burnup 4,000 MWD /MTU would be appreciated. Achievement of 4,000 MWD /MTU cycle burnup is expected on or about December 10, 1981.
We trust that you will find this submittal satisfactory; however, should you desire additional information, feel free to call.
Very truly yours, HAINE YANKEE ATOMIC POWER CO.
w J. B. RandazTa~
Vice President Manager of Operations STATE OF MAINE
)
)ss COUNTY OF KENNEBEC)
Then personally appeared before me, John B. Randazza, who, being duly sworn, did state that he is a Vice President of Maine Yankee Atomic Power Company, that he is duly authorized to execute and file the foregoing request in the name and on the behalf of Maine Yankee Atomic Power Company, and that the statements therein are true to the best of his knowledge and belief.
fE H-7d Notary Public
[
g,-rs rm
.-