ML20038A875

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 81-02,Suppl 1.No Westinghouse Electro-Mechanical Div Mfg motor-operated Gate Valves Are or Will Be Installed in safety-related Sys Where Required to Close Against Differential Pressure
ML20038A875
Person / Time
Site: Satsop
Issue date: 11/06/1981
From: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
REF-SSINS-6820 GO3-81-2697, IEB-81-02, IEB-81-2, NUDOCS 8111240367
Download: ML20038A875 (2)


Text

-

4 .. Docket Nos. 50-508/509 Bulletin No. 81-02

, wee HRC Washington Public Power Supply Sysigm Box 1223 Elma, Washington 98541 (206) 482 44d8 N OV l2 Pli 12: ':3 AMENDED LETTER WITH SIGNATURE November 6,1981 G03-81-2697 83h ', . ,

7e '%f Mr. R. H. Engelken, Director <p United States Nuclear Regulatory Commission < O'\1Fl f Region V 1990 N. California Boulevard .

SN f\

Suite 202, Walnut Creek Plaza ', N 72 Walnut Creek, California 94596 .h u.s,OV2 3

Dear Mr. Engelken:

d m en M W

'caun J/

/

1/

Subject:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM C) P NUCLEAR PRO.'dCT NOS. 3 AND 5 DOCKET NOS. 50-508 and 50-509 RESPONSE TO IE BULLETIN 81-02, SUPPLEMENT 1 IE Bulletin 81-02 Supplement 1 identified, for the entire line of Westinghouse Electro-Mechanical Division Manufactured motor-operated gate valves, the potential of the valves not closing against differential

! pressure.

The Supply System has investigated the subject matter and determined that no Westinghouse Electro-Mechanical Division manufactured motor-operated gate valves are or will be installed, or maintained as spares for instal-lation, in safety-related systems where they are required to close against a differential pressure.

Therefore, we consider the subject bulletin not applicable to the WNP-3/5 project.

Very truly yours, R. S. LEDDICK Program Director, WNP-3/5 cc: D. Smithpeter, BPA WNP-3/5 Files, Richland Ebasco Elma J. A. Adams, PP&L M. K. Yates, NY0 Director, NRC Office of I&E Washington, D. C.

W. Woods, NUS N. S. Reynolds, D&L 8111240367 811106 IET PDR ADOCK 05000508 61 o PDR 81-l6&

~

ffECSVED I!M washington Public Power Supply Systep%.

Box 1223 Elma, Washington 98541 (206)482-4428 -9 PH 12: c3 November 5, 1981 G03-81-2697 ggg,,j ,

Mr. R. H. Engelken, Director United States Nuclear Regulatory Commission Region V 1990 N. California Boulevard Suite 202, Walnut Creek Plaza Walnut Creek, California 94596

Dear Mr. Engelken:

Subject:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM NUCLEAR PROJECT NOS. 3 AND 5 DOCKET NOS. 50-508 and 50-509 RESPONSETOIEBULLETIN81-02,SUPPLEMENTJ IE Bulletin 81-02 Supplement 1 identified, for the entire line of Westinghouse Electro-Mechanical Division Manufactured motor-operated gate valves, the potential of the valves not closing against differential pressure.

The Supply System has investigated the subject matter and determined that no Westinghouse Electro-Mechanical Division manufactured motor-operated gate valves are or will be installed, or maintained as spares for instal-lation, in safety-related systems where they are required to close against a differential pressure.

Therefore, we consider the subject bulletin not applicable to the WNP-3/5 project.

Very truly yours, R. S. LEDDICK Program Director, WNP-3/5 cc: D. Smithpeter, BPA WNP-3/5 Files, Richland Ebasco Elma J. A. Adams, PP&L M. K. Yates, NY0 Director, NRC Office of I&E Washington, D. C.

W. Woods, NUS N. S. Reynolds, D&L