Notifies of Actions Taken to Resolve SER (NUREG-0798) Open Items Re Incore Probe & HPCI & Reactor Core Isolation Cooling Sys Testing,Per SER Section 6.2.7,Suppl 1
ML20038A874
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/18/1981
From: Tauber H
DETROIT EDISON CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0798, RTR-NUREG-798 EFZ-55-512, NUDOCS 8111240365
Download: ML20038A874 (3)


Text

.

H rry Tsub:r anc Constructen Detroit Edison Ensi"4" November,18,.1981 EF2 - 55,512

(>$.LI?>,,

Mr. Darrell G. Eisenhut, Director

'g ff (/,[ [h,E Division of Licensing Office of Nuclear Reactor Regulation S

r NO

,s U. S. Nuclear Regulatory Commission 4

Washington, D. C. 20555 ~

f%pg 0 og.

L 74 9

/

0

Dear Mr. Eisenhut:

~

l Sk'

Reference:

Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341

Subject:

NUREG-0798 open Items Section 6.'2 7 in Supplement ~1 of the Fermi 2 SER (NUREG-0798), identifies two.o,utstanding.open items to be resolved.

1.

Traversing Incore Probe System Testing Edison agrees to expand the Fermi 2 Technical Specifications to include provisions to:

a.

Verify the continuity of the explosive charge at least once every 31 days.

b.

Initiate one of the explosive squibs charge at least once every 18 months.

The replacement charge for the explosive valve shall be from the same manufactured batch as the one fired or from another batch which has been certified by having one of that batch successfully fired.

c.

Replace all charges according to the pol manufacturer's recommended lifetime.

3

</o 0111240365 01111'S PDR'ADOCK 05000341-E PDR;

Mr. D. G. Eisenhut November 18, 1981 EF2-55,512 Page 2 2.

Bypass Leakage Testing of HPCI-and RCIC systems a.

Steam Drain Lines Our investigation has shown that incorporation of the modifications required in the SER Supplement 1 on HPCI and RCIC steam line drains will jeopardize restart capability of these systems. Consequently, Edison withdraws our proposal to designate only the. actual bypass path and its accompanying valves as being part of the bypass leakage test program and, instead, agrees to designate the respective penetrations as the bypass paths.

The HPCI and RCIC penetrations are tested according to the Type C (Appendix J) provisions, as are all other primary containment penetrations.

b.

Discharge to Condensate Storage Lines The line to condensate storage from the RCIC System meets all the requirements listed in SER Supplement 1.

The HPCI system by design criteria has all valves powered from Division 2. Consequently, the requirement to supply the two valves in the condensate storage line with divisional power cannot be met.

(All other requirements are met).

The following plan is suggested to over-come this dilemma:

The path from the primary coolant pressure boun-dary to the condensate storage tank contains not two but three valves:

V8-2194, V8-2198, V8--2200.

These valves are interlocked such that V8-2194 must be closed before V8-2198 can be opened.

Consequently adding V8-2194 to the list of valves tested for bypass leakage would provide assurance that leakage criteria would not be exceeded even for the case of loss of Division 2 power while V8-2198 is open.

Edison believes this meets NRR criteria for bypass leakage paths.

Mr. Darrell G. Eisenhut November 18, 1981 EF2-55,512 Page 3 c.

Revised List of Valves for Bypass Leakage Testing The list of valves for bypass leakage testing was given previously in our letter EF2-53,932, July 2, 1981.

Based on the changes discussed above, the list becomes:

SYSTEM P&ID VALVE Steam Line Drain 6M721-2089 V17-2009 V17-2010 HPCI 6M721-2035 V8 -2194 V8 -2198 V8 -2200 V17-2020 V17-2021 V17-2088 RCIC 6M721-2044 V8 -2232 V17-2030 V17-2031 Drywell Sumps 6M721-2032 V9 -2044 V9 -2005 V9 -2022 V9 -2023 Sincerely, 1

,hny w!m j

cc:

Mr. L. L. Kintner Mr. B.

Little