Enclosure to Serial: RSEP/81-1858 Page 1 of 3 OPERATING DATA REPORT DOCKET NO: 50-261 DATE: 811103 COMPLETED BY:
M. Watford TELEP110NE: 803-383-4524 OPERATING STATUS Notes:
- 1. Unit Name:
H.
B. Robinson Unit Two There are presently 113 spent
- 2. Reporting Period: 811001.0000/811031.2400 fuel assemblies stored in the
- 3. Licensed Thermal Power (FMt ) :
2300 spent fuel pool.
- 4. Nameplate Rating (Gross F?.?e):
739
- 5. Design Electrical Rating (Net FMe):
700
- 6. Maxinum Depcudable Capacity (Gross IMe):
700
- 7. Maximum Dependable capacity (Net FMe):
665
- 8. If Changes occur in Capacity Ratings (Item Number 3 through 7) Since Last Report, Give Reasons:
No change.
- 9. Power Level to Which Restricted, If Any (Net FMe): m325 (50% Reactor Power)
- 10. Reasons For Restrictions, If Any: Although the unit is not restricted by any outside agency, the power level is presently reduced due to steam generator considerations.
This Month Yr.-to-Date Cumulative
- 11. Hours in Reporting Period 745 7291_
93,M62_
- 12. Number of Hours Reactor Was Critical 745 5737.96 71.503.24
- 13. Reactor Reserve Shutdown Hours 9.20 116.62 1094.50
- 14. Hours Generator On-Line 735.80 5600.80 69.759.62
- 15. Unit Reserve Shutdown llours 0.00 0.00 23.20
- 16. Gross Thermal Energy Generated (FMH) 843.881 10.660.938 141.873.312
- 17. Gross Electrical Energy Generated (FMH) 252.864 3.349.364 45.688.131
- 18. Not Electrical Energy Generated (FMll) 232.179 3.150.899_
43.267.351
- 19. Unit Service Factor 98.77 76.77 74.64
- 20. Unit Availability Factor 98.77 76.77 74.66
- 21. Unit Capacity Factor (Using MDC Net) 46.86 64.94 69.62
)
- 22. Unit Capacity Factor (Using DER Net) 44.52 61.70 66.13
- 23. Unit Forced Outage Rate 1.23 15.87 14.03
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
l Two outanes are planned within the next six months: one in early November and a l
refuelinn/ maintenance outane in late winter.
I
- 25. If Shut Down At End of Report Period, Estimated Date of Startup: On line.
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY l
INITIAL ELECTRICITY l
COMMERCIAL OPERATION l
I 8111160184 811110 i
PDR ADOCK 05000261 (9/77)
Page 2 of 3 A
AVER AGE D gILy UNIT l'OWER LEVEL -
DOCKEINo.
50-261
- 11. B. Robinson Two UNIT 811104 DATE M. Watford CO\\!PLE 1 E n ity l ELEPil0N E 803-383-4524 October S!0NTil DAY AVERAGE D \\ll.Y POWER LEVEL DAT-AVER AGE D \\lly POhER LEVEL pgWe.Seg 3 O!We-Net J 312 J
17 316 313 2
I8 320 313 322 3
i9 4
20 313 323 5
21 321 6
11i 22 313 321 7
23 305 322 g
24 03 322 9
25 10 315 323 26 318 318 yi 27 319 314 33 2S 320 321 13 29 320 323 j.:
30 324 35 3g 16 138 l
l i
INSTRUCTIONS On this forrust.hst the.nerage daily unit power leselin MWe-Net fer i.aeh day n, the rep..rting in inth. Compute t >
the nearest whole nwgawatt.
(9/77 )
1 tg
Page 3 of 3 50-261 DOCK!INO UNIl SilUIDOWNS AND POWER REDUCTIONS H.
B.
R binson Two UNIT. A%1E N
DAIE 811104 COMPLE'I E D liY 51. Watford Hl: PORI %10 Nill._0ctober Pi!ONE 803-383-4524
'l
!O h
[
litelhee f *t CJuse & Ctarteitive 3
- s.,'
Daic E.
iE 4
EE5 Ivent 7
5 ~$
A't'on to jg y
~j Report c E {-
jL Present Recurrence x
10-01 811016 F
9.20 A
1 IIJ llTEXCll Outboard inner exciter cooler leak, leaking tubes were plugged and cooler was returned to service.
~
3 4
M e t I"'J -.
Ex!nbit G - Inst rottuins F F.uted Re.n' n S Sc hedi !cd A I un:,nieni l~.nlaie (1.xpla.n) 1 -M.ninal fin Prep.uaroni of Data R.Maii.:es...ns e of Test 2-Manna! Scrain.
Entry Sheets for Licensee 3-Antonutic Sciam.
Esent Rep.nl (LLR e File (NURI G-c. R ei nc h n;.
D Rc.cnutoi3 Rest ration 4-Oiher ( E xplain )
0161) 1 Opeutui 'liaining & Lhense 1 xainination f AdnunhtI.llist' Esinbit ! Same Source G-Operational I s tor ( E xplun )
r8/77)
Il-Oth 's 4 Explan )