Enclosure to Serial: RSEP/81-1858 Page 1 of 3 OPERATING DATA REPORT DOCKET NO: 50-261 DATE: 811103 COMPLETED BY: M. Watford TELEP110NE: 803-383-4524 OPERATING STATUS Notes:

1. Unit Name: H. B. Robinson Unit Two There are presently 113 spent
2. Reporting Period: 811001.0000/811031.2400 fuel assemblies stored in the
3. Licensed Thermal Power (FMt ) : 2300 spent fuel pool.
4. Nameplate Rating (Gross F?.?e): 739
5. Design Electrical Rating (Net FMe): 700
6. Maxinum Depcudable Capacity (Gross IMe): 700
7. Maximum Dependable capacity (Net FMe): 665
8. If Changes occur in Capacity Ratings (Item Number 3 through 7) Since Last Report, Give Reasons: No change.
9. Power Level to Which Restricted, If Any (Net FMe): m325 (50% Reactor Power)
10. Reasons For Restrictions, If Any: Although the unit is not restricted by any outside agency, the power level is presently reduced due to steam generator considerations.

This Month Yr.-to-Date Cumulative

11. Hours in Reporting Period 745 7291_ _

93,M62_

12. Number of Hours Reactor Was Critical 745 5737.96 71.503.24
13. Reactor Reserve Shutdown Hours 9.20 116.62 1094.50
14. Hours Generator On-Line 735.80 5600.80 69.759.62
15. Unit Reserve Shutdown llours 0.00 0.00 23.20
16. Gross Thermal Energy Generated (FMH) 843.881 10.660.938 141.873.312
17. Gross Electrical Energy Generated (FMH) 252.864 3.349.364 45.688.131
18. Not Electrical Energy Generated (FMll) 232.179 3.150.899_ 43.267.351
19. Unit Service Factor 98.77 76.77 74.64
20. Unit Availability Factor 98.77 76.77 74.66
21. Unit Capacity Factor (Using MDC Net) 46.86 64.94 69.62

) 22. Unit Capacity Factor (Using DER Net) 44.52 61.70 66.13

23. Unit Forced Outage Rate 1.23 15.87 14.03
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

l Two outanes are planned within the next six months: one in early November and a l refuelinn/ maintenance outane in late winter.

I

25. If Shut Down At End of Report Period, Estimated Date of Startup: On line.
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY - -

l INITIAL ELECTRICITY - -

l COMMERCIAL OPERATION - -

l I 8111160184 811110 i PDR ADOCK 05000261 (9/77)

! R PDR

SS

! tg

. A Page 2 of 3 AVER AGE D gILy UNIT l'OWER LEVEL -

DOCKEINo. 50-261 UNIT

11. B. Robinson Two DATE 811104 CO\!PLE 1 E n ity M. Watford l ELEPil0N E 803-383-4524 October S!0NTil DAY AVERAGE D \ll.Y POWER LEVEL DAT- AVER AGE D \lly POhER LEVEL pgWe.Seg 3 O!We-Net J J

312 316 17 2 313 320 I8 313 322 3 i9 4 20 5 313 323 21  !

6 11i 321 22 313 321 7 23 g 305 322 24 03 322 9 25 10 315 323 26 yi 318 318 27 319 314 33-2S .

320 321 13 29 j.: 320 323 30 35 3g 324 16 138 l

l i INSTRUCTIONS

! On this forrust.hst the .nerage daily unit power leselin MWe-Net fer i.aeh day n, the rep..rting in inth. Compute t >

the nearest whole nwgawatt.

(9/77 )

1 tg

Page 3 of 3 ,

50-261 ,

DOCK!INO UNIl SilUIDOWNS AND POWER REDUCTIONS H. B. R binson Two UNIT . NA%1E DAIE 811104 COMPLE'I E D liY 51 . Watford Hl: PORI %10 Nill ._0ctober Pi!ONE 803-383-4524

'l -

!O litelhee CJuse & Ctarteitive h [ f *t3

s. ,' Daic E. iE 4 EE5 Ivent 7 5 ~$ A't'on to

$ jg y ~j Report c E {- jL Present Recurrence x

10-01 811016 F 9.20 A 1 --

IIJ llTEXCll Outboard inner exciter cooler leak, leaking tubes were plugged and cooler was returned to service.

' 3 4

~

M e t I"'J -. Ex!nbit G - Inst rottuins F F.uted Re.n' n 1 -M.ninal fin Prep.uaroni of Data S Sc hedi !cd A I un:,nieni l~.nlaie (1.xpla.n) 2-Manna! Scrain. Entry Sheets for Licensee R.Maii.:es...ns e of Test Esent Rep.nl (LLR e File (NURI G-c . R ei nc h n;. 3- Antonutic Sciam.

4-Oiher ( E xplain ) 0161)

D Rc.cnutoi3 Rest ration 1 Opeutui 'liaining & Lhense 1 xainination f AdnunhtI.llist' Esinbit ! Same Source G-Operational I s tor ( E xplun )

r8/77) Il-Oth 's 4 Explan )