ML20038A594

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-445/81-14 & 50-446/81-14 During Aug & Sept 1981.No Noncompliance Noted
ML20038A594
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/30/1981
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20038A595 List:
References
NUDOCS 8111130687
Download: ML20038A594 (2)


See also: IR 05000445/1981014

Text

_

-

-

g/9

In Reply Refer To:

Dockets: 50-445/81-14

50-446/81-14

M 30 gyg

q .s. ,e'/N

6"

O'

TA

'

Texn Utilities Generating Company

[

4

\\/

j

ATlh: Wr. R. J. Gary, Executive Vice

-

President ;:nd General Manager

~

h9

-

2001 Eryan Tower

k

p

Dalin, Texas 75231

\\

3

3.x

p-

Gentlemen:

' 'D'[ g N

. _ .

This refers to the inspection conducted by our Resident Reactor Inspector,

Mr. R. G. Taylor, during Amst and September 1981, of activities authorized

by NRC Construction Permits CPPR-126 and CPPR-127 for the Comanche Peak

facility, Units 1 and 2, and to the discussion of our findings with Mr. R. G.

Tolson and other seabers of your staff at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted

of selective examination of procedures and representative records, inter-

views with personnel, and obserntions by the inspector.

Within the scope of the inspection, no violations were identified.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these itens is idantified in

paragraph 2 of the enclosed report.

One new unresolved item disclosed during the inspection is discussed in

paragraph 5 of the enclosed report.

o on

E"

In accordance with 10 CFR 2.790 of the Comunission's regulations, a copy of

g

this letter and the enclosed inspection report will be placed in the NRC's

j

s!g

Public Document Room. If this report contains any information that you

Mo.

believe to be exempt from disclosure under 10 CFR 9.S(a)(4), it is necessary

N

that you (a) notify this office by telephone within 10 days from the date of

o

this letter of your intention to file a request for withholding; and (b) sub-

g

mit within 25 days from the date of this letter a written application to this

-

5

office to withhold such information. If your receipt of this letter has been

Eu'8

delayed such that less than seven days are available for your review, please

wtify this office promptly so that a new due date may be established. Con-

11 stent with Section 2.790Jb)(1), ary such application must be accompanied

by an affidavit executed by the owner of the information which identifies the

ku

9,

document or part sought to be withheld, and which contains a full statement of

t

-

the T-eaks im Um " ris which ys in ci11 mea snat tne i ornation should be

..RPS3. Q

..RRS3..

s-

...RP8 g ..... .....EI.....

. .-D

- RIV .

h-

p g.-

..

konins...

5"p4Tay W jc... . .WCrossman. . . .

. GLMa se n. . . . . . .JGag1.1 do . .

... .p C..L

J.

.....

    • '.9!!!!.81..... . 19!.+.? 8.'. . . . . . .. .'.8!

8'..... ....LO...../.8L... ?...$BL...-

.... 4

...............

.

, unc ronu sie moi nacu o2a

___________ _ __OFFICI AL RECORD COPY

/[/

..

\\

.v

3

,

Texas Utilities Generating Ccupany

-2-

withheld from public disclosure. This section further requires the statement

toaddresswithspecificitytheconsiderationslistedin10CFR2.790(b)(4).

The,information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified periods noted above, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we Mill be pleased

to discuss them with you.

Sincerely,

"oristnal signed b'91

0, l., MADS.EMa

G. L. Madsen, Chief

Reactor Projects Branch

Enclosure:

Appendix - IE Inspection Report 50-445/81-14

50-446/81-14

cc w/ enclosure:

Texas Utilities Generating Company

ATTN: Mr. H. C. Schmidt, Project Manager

2001 Bryan Tower

Dallas, Texas 75201

bec to DMB: A bec distrib by RIV:

BC

\\

R. G. Taylor, RRI

PM

W. Crossman, RPS3

AE0D

Info Systems

ELD

TIB

IE File

EIB

IE/RPRIB

Texas Dept. Health Resources

NRR, DHFS

Juanita Ellis

NRR/0LB

Geoffrey M. Gay

RAD ASMT BR

Richard W. Lowerre, Esq.

RESEARCH

Richard Fouke

PDR:HQ

-

LPDR

NSIC

omer>

......... .... . .

.....................

...................

.....................

. ..................,

...... ........,, ,,,

,, ,,,,,,,,,.......

su: m e)

..................

.............. . ...

.... ..............

.... ................

.....................

...................

...... ............

8ATEk

.. ...............

.... ..............

.....................

.....................

.....................

. . . . . . . . . . . . . . . . . . . .

..................

ec acu m no,somcu e24o

OFFICIAL RECORD COPY

  • " " -32 n: