Responds to NRC Re Violations Noted in IE Insp Rept 50-286/76-16.Corrective Actions:Guidelines Being Revised to Authorize Other Technically Competent Individuals to Approve Field Changes.Encl Withheld (Ref 10CFR2.790)
ML20038A505
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 08/19/1976
From: William Cahill
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
To: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20038A504 List:
References
NUDOCS 8111090494
Download: ML20038A505 (2)


Text

..

-...wm

..m

.m.e.

William J. Cchill. Jr.

v.cc Pen.Jent

.Conschdated Edison Company of New York. Inc.

4 Irving Place. New York. N Y 10003 Telephor.e (212) 460 3819 y

August 19, 1976 r

Re:

Indian Point Station Docket No. 50-286 f.-

Inspection No. 76-16 Mr. Eldon J. Brunner, Chief

.c, i Reactor Operations and Nuclear Support Branch U.S. Nuclear Regulatory Commission, Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Brunner,

This refers to an inspection conducted by your Mr. John

~

Streeter on June 21 - 25 and June 29 - July 2, 1976 of acti-y:f ':ies authori::cd by MRC Licence Uc. DPR-64 at our Indian Ed. int Station.

Your July 27, 1976 letter stated that it-ap-

. N^

peared that certain of our activities were not conducted in full compliance.with NRC requirements.

These particular ac-(#

~

tivities were enclosed as Appendices A & B to your letter.

With respect to the item identified in Appendix A, the follow-Ing is offered:

)

During the Inspector's review of the test results of the

~

power ascension program, he noted that field changes to the test procedures were not being approved in accordance with l

INT-TP-ADMIN-1.0, The Administrative Guidelines for the Test l

Program".

ADMIN-1.0 requires that field changes be jointly

(

agreed to by Wedco and the con Ed Test Supervisor who is the l

Watch Foreman after the issuance of an operating license.

Contrary to this requirement, personnel other than the Watch Foreman had approved several non-safety related changes.

The changes approved were either clerical or non-safety related.

The personnel making the changes were the Con Ed shift Test Engineers who were considered to be more techni-cally qualified to make these types of changes since they were involved in the preparation and approval of the origi-nal procedures.

G

~

8111090494 760902 DR ADOCK 05000286 PDR

'1

-n m

7

+-.,c_.

-,-,.,,-,w,-,

e,_m p.,,,

'n.--

=-

M Eldon J..Brunner' August 19, 1976 We recognize that this action was contrary to the re-quirements of INT-TP-ADMIN-1.0.

To prevent recurrence of

+

this, the following corrective actions have been taken -

Fr A)

The sections erf

  • INT-TP-ADMIN-1. 0 that deal with it&

field changes are being revised to authorize other technically competent individuals to approve field changes.

~7',

B)

The Test Engineers have been re-instructed on the importance of adhering to established procedures.

_.i:

@V '

tI.ki With respect to the item identified in Appendix B, our response is enclosed separately since according to Section I :'

2.790(d) of the NRC's Rules of Practice, Part 2, Title 10,

~~

Code of Federal Regulations, correspondence and reports to or from the NRC which identify a licensee's control and ac-tj counting procedures for safeguarding licensed nuclear material or detailed security measures.for the physical protection of 7 'sicensed facility arc enempt from dicciocure.

We therefore

?

tds'erstand that the response will not be placed in the Public Document Room and will receive limited distribution.

N.2Q 4.t.%.

^%,

Very truly your h'

f r sy William J.

Cahill, Jr.

Vice President L

I' i

l l

6 l

?f1 b

I.d -

N'-

i,

. - - - - - - ~ -

g ::_ 7 ". 2 I ? ;I U.]I I E 9 H E R EYN I N p ac%

COninia wCuiSoS50s INIO2IUAIIOH' y Yg 'k NUCLEAR REGULATORY COMMISslON S

REGION 1 E QN, [.h j 631 PARK AVFNUE

  • 4',,, w '

f Q KING OF PRUSSI A PENNSYL.V ANI A 19406

[

%f s

9 NOV 131978 Docket No. 50-286 Power Authority of the State o'f New York Indian Point 3 Nuclear Power Plant ATTN: Mr. J. P. Bayne Resident Manager P. O. Box 215 Buchanan, New York 10511 Gentlemen:

Subject:

Inspection 50-286/78-29 This refers to the inspection conducted by Mr. E. Jones of this office on October 2-6, 1978, at Indian Point 3 Nuclear Power Plant, of activities authorized by NRC License No. DPR-64 and to the discussions of our findings hsid by Mr. Jones with yourse'f and Mr. B. Weiser of your staff at the conct,usion of the inspection.

Areas examined during this inspection are described in the Office of St Inspection and Enforcement Inspection Report which is enclosed with this ND letter. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that certain of your activities were not conducted in full compliance with NRC requirements, as set forth in the Notice of Violation, enclosed herewith as Appendix A.

These items of noncompliance have been categorized into the levels as described in our corresponder.ce to you dated December 31, 1974.

This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within twenty (20) days of your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2) corrective steps which will be taken to avoid further items of noncompliance; and (3) the date when full compliance will be achieved.

i f.-

(

7 y a rown N

l s

E ' " ' ' - ' ' ~ ~ - ' ' ' ' ' - - ~ 9 " ' ' ' ' " ' i j

C!bnii i CFP li ICN.

ENC!.C:RE3 T.n:r,iTTED HERENITH CONTWi; 10 C F 3 2.700 li:F0;UMTjen, Power Authority of the State of 2

New York

/

(

NOV 131978 In accordance with Section 2.790(d) of the NRC's " Rules of Practice,"

Part 2, Title 1C, Code of Federal Regulations, documentation of findings of your control and accounting procedures for safeguarding special nuclear materials and your facility security procedures are exempt from disclosure; therefore, the encfosures to this letter, and your response to this letter will not be placed in the Public Document Room and will receive limited distribution.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, r

5

/fd Walter G. Martin, Chief Safeguards Branch l

Enclosures:

l 1.

Appendix A, Notice of Violation (Contains 2.790 Information) 2.

Office of Inspection and Enforcement Inspection Report Nt;mber

,0E 50-286/78-29 (Contains 2.790 Information)

%.i. -

cc w/ report cover sheet only :

George T. Berry, General Manager and Chief Engineer L. R. Bennett, Assistant General Manager - General Counsel G. M. Wilverding, Licensing Supervisor l

P. W. Lyon, Manager - Nuclear Operations A. Klausmann, Director, Quality Assurance D. Halama, Site Quality Assurance Engineer J. F. Davis, Chairman, Safety Review Comittee J. M. Makepeace, Director, Technical Engineering (Con Ed) l

[

)

s i

EN.. ~' ".. a,.'_o ~i......a"aD u.. o,, a"!li H

~

C0iiin 10 Ci R 2.7E3 li;FORiMTION.