Forwards IE Insp Rept 50-289/81-08 on 810301-0430.No Noncompliance Noted
ML20037D390
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/25/1981
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hukill H
METROPOLITAN EDISON CO.
Shared Package
ML20037D391 List:
References
NUDOCS 8107100179
Download: ML20037D390 (2)


See also: IR 05000289/1981008

Text

V

.

.

.

!cf

4

UNITED STATES

l}Rf.&}

NUCLEAR REGULATORY COMMISslON

nEason a

jg

C

631 PARK AVENUE

d

S

<iNc OF PRUSSI A PENNSYLVANI A 19406

, wf

,

e...*

JUN 2 5 1981

Docket No. 50-289

I

y8:.J..[.,Js >b

-

-

\\

Metropolitan Edison Company

jS f

.

ATTN: Mr. H. D. Hukill

'

[ "IUL 0 91981 * h

Vice President and Director of TMI-1

P.O. Box 480

d u 5 %',,7%^" Ji

Middletown, Pennsylvania 17057

.3

'

fW

si I Y '/

Gentlemen:

~T

Subject: Inspection Report 50-289/81-08

This refers to the routine safety inspection conducted by Mr. D. Haverkamp

of this office on March 1,1981 - April 30,1981, of activities authorized

by NRC Licnese DPR-50 and to the discussions of our findings held by

Mr. Haverkamp with Messrs. C. Smyth and R. Harbin of the GPU Nuclear

staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure

un . r 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office

by telephone within 10 days from the date of this letter of your intention

to file a request for withholding; and (b) submit within 25 days from

the date of this letter a written application to this office to withhold

such information.

Consistent with section 2.790(b)(1), any such application

must be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons on the basis which it is claimed

that the information should be withheld from public disclosure.

This

section further requires the statement to address with specificity the

considerations listed in 10 CFR 2.790(b)(4).

The information sought to

T W

2

Ji

8107100179 810625

PDR ADOCK 05000289

G

PDR

_,

.

-

.

.

.

.

JUN 2 51981

2-

Metropolitan Edison Company

-

br. withheld shall be incorporated as far as possible into a. separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, the report will be placed in the

i

Public Document Room.

The telephone notification of your intent to

request withholding, or any. request for an extension of the 10 day

period which you believe necessary, should be made to the Supervisor,

Files, Mail and Records, USNRC Region I, .st (215) 337-5223.

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

.

.

/

R. R. Ke mig, C ef

Projects Branch #2, Division of

Resident and Project Inspection

.

Enclosure: Office of Inspection and Enforcement Inspection Report

Number 50-289/81-08

cc w/ene',:

R. J. Toole, Operatio..s and Maintenance Director TMI-l

C. W. Smyth, Supervisor TMI-l Licensing

E. G. Wallace, Manager PWR Licensing

J. B. Liberman, Esquire

G. F. Trowbridge, Esquire