ML20037D211

From kanterella
Jump to navigation Jump to search
Discusses 810319 & 0407 Submittals for Meeting Fire Protection Mod Requirements of Section Iii.G,Iii.J & Iii.O of App R to 10CFR50,in Response to .Pending NRC Response to Schedule Will Be Sent by 820330
ML20037D211
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/18/1981
From: Baynard P
FLORIDA POWER CORP.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
3-051-40, 3-51-40, NUDOCS 8105220261
Download: ML20037D211 (2)


Text

. <

os M

n)

[A wa

/

v Florida b

%(

jYi CORPORA 7aom May 18, 1981

  1. 3-051-40 File: 3-F-2 Mr. Darrell G. Eisenhut Di rector Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Fire Protection Modifications Reference (1) Fire Protection Rule, NRC Generic Letter 81-12, to All Power Reactor Licensees With Plants Licensed Prior to January 1,1979, Dated February 20, 1981.

(2) FPC Lette from Dr.

P.

Y.

Baynard to Mr. Darrell G.

Eisenhut " Fire Protection Modifications," Dated March 19, 1981.

(3) NRC letter from J. F. Stolz to J. A. Hancock, " Fire Pro-tection - Alternate Shutdown Capability - Item 3.1.15,"

Dated April 7,1981.

Dear Mr. Eisenhut:

By reference (1), you requested Florida Power Corporation to submit detailed information for meeting the requirements of Section III.G, III.J, and III.0 of Appendix R to 10 CFR 50.

By reference (2) FPC submittad tiie following:

(a) Detailed information to resolve unresolved items of the Fire Protection Safety Evaluation Report, Dated July 27, 1979.

(b) Reouested an exemption from the 30-day response requirement

/l004 until March 30, 1982, to provide detailed information for (4

5 meeting requirements of Sections III.G and III.L.

(c) Requested an exemption from back fitting the existing Reactor O

Coolant Oil Collection System on the basis that the existing i

oil collection system meets the objective of Section III.0, and was previously approved by the NRC and implemented by FPC.

8105220 j

f General Office 32o1 inetysourtn sneefsoutn. P O Box 14042. st Petersburg. Fiorida 33733 813 - 866-5151

.~

Mr. Darrell G. Eisenhut Page Two May 18, 1981 (d) FPC complies with the intent of Section III.J - Emergency Lighting.

By reference (3), FPC received Staff's evaluation on the proposed. Safe Shutdown Panel for meeting the intent of Sections III.G and III.L. FPC is currently reveiwing these evaluations in conjunction with the ongoing design studies.

Pending Staff's response to FPC's letter of March 19, 1981, FPC reaffirms tha+ FPC will provide the NRC with the appropriate design details and in alation schedules for meeting Sections III.G and III.L of 10 CFR 50 by March 30, 1982.

Regarding Section 111.0, FPC is awaiting for NRC's response to FPC's letter of March 19, 1981.

Should you have any questions regarding our response, please contact his office.

Very truly yours, M

P. Y. Baynard Manager Nuclear Support Services l