Responds to NRC Re Violations Noted in IE Insp Repts 50-010/80-23,50-237/80-25 & 50-249/80-30.Corrective Actions:Added Info to Training Matl for Shift Personnel Concerning Proper Setpoint for Pressure Regulator
ML20037D109
Person / Time
Site: Dresden  
Issue date: 02/25/1981
From: Abel J
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20037D108 List:
References
NUDOCS 8105210551
Download: ML20037D109 (2)


Text

_W

- ~

Commonwealth Edison On2 First National Plaza Chicago. tilinois Address Reply to: Pos. Office Box 767 Chicago, Illinois 60690 FebIuary 25, 1981 Mr. James G. Keppler, Director.

Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Dresden Station Units 1, 2, and 3 Response to IE Inspection Report Nos. 50-10/80-23, 50-237/80-25 and 50-249/80-30 NRC Docket Nos. 50-10/237/249 Reference (a):

R.F. Heishman letter to C. Reed dated February 3, 19f.,1

Dear Mr. Keppler:

Reference (a) transmitted the results of an inspection conducted by Messrs.

T.

Tongue, F. Reimann, M.

Jordan, and W.

Key on November 15 through December 31, 1980 of activities at Dresden l

Nuclear Power Station.

Appenoix A to Reference (a) identified one item of noncompliance with NRC requirements.

Our response to this item of noncompliance is provided in Attachment A.

Please address any questions concerning this matter to this office.

Very truly yours, h

J. S.

Abel Director of l

Nuclear Licensing Attachment cc:

RIII Inspector, Dresden 08508 8105210 67/

MM 2 1981

io NRC Docket Nos. 50 10 50-237 50-249 ATTACHMENT A COMMONWEALTH EDISON ATTACHMENT RESPONSE.TO NOTICE.0F VIOLATION The item' of noncompliance identified in Appendix A of the NRC letter dated February 3, 1981 is responded to in the following paragraphs.

1.

Technical Specification 6.2.A requires, that detailed written procedures including applicable checkoff lists covering normal startup of the reactor and other systems shall be prepared, approved and adhered to.

The first step of Section 3 of procedure DGP 101, the unit startup procedure, states "during pressurization of the reactor, the pressure regulator setpoint shall be maintained approximately 50 psi greater than reactor pressure."

Contrary to the above, on December 4, 1980, the reactor was pressurized to approximately 250 psig in the course l

of a normal unit startup with the pressure regulator l

setpoint left at its low setpoint (~150 psig),

resulting in a reactor scram.

Corrective Action Taken and Results Achieved Information was added to the training material for all shift personnel concerning the proper setpoint for the pressure regulator during startups.

This information is being conveyed to all shift personnel as part of their every six week training sessions.

Corrective Action Taken to Avoid Further Non-Compliance Procedures DGP l-1 (Unit 2/3 Normal Unit Startup) and DGP l-3 (Unit 2/3 Hot Standby to Power Operation) will be revised to include a caution reminding the operator to maintain the pressure regulator cetpoint approximately 50 psig greater than reactor pressure.

l Date When Full Compliance Will be Achieved Procedures DGP l-1 and DGP l-3 will be revised and in place l

by March 25, 1981.