U.S. NUCLEAR REGULATORY COMMISSION pd 0FFICE OF INSPECTION AND ENFORCEMENT REGION IV Report No. 99900003/81-01 Program No. 51500 Company:

General Electric Company Wilmington Manufacturing Department Box 780 Wilmington, North Carolina 28401 Inspection Conducted:

February 17-20, 1981 Inspector:

-mM J/S/d/

W. M. McNeill, Contractor Inspector Date Components Section Vendor Inspection Branch Approved by 3/G /ei

0. E. whitesell,' Chief Qate Components Section Vendor Inspection Branch Summary Inspection on February 17-20, 1981 (99900003/81-01)

Areas Insoected:

In.plementation of the Topical Report including procurement controls; moisture and hydrogen controls and action on previous inspection findings.

The inspection involved 28 inspector-hours on site by one NRC inspector.

Results:

In the three areas inspected, no apparent nonconformance or unresolved l

items were identified in two areas.

The following nonconformance was identified l

in the remaining one area.

Procurement Controls - the edition and addendum cited in the Engineering Instruc-tions were not included in the MR and its subsequent purchase order.

i 8105 210ft/ F m

~ -.,

4

r 2

OETAILS SECTION I A.

Persons Contacted P. H. Asson, Process Control Engineer J. B. Baldwin, Process Control Engineer N. L. Blazek, Manufacturing Supervisor T. Cunningham, Purchased Material Quality Control Engineer

  • C. W. Doyle, Quality Audits and Customer Service Manager
0. D. Harrell, Manufacturing Foreman J. B. Iosea, QC Technician W. Zacewell, Chem Met Lab Technician S. C. Laufer, Fuel Comoonent Quality Control Manager
  • E. A. Lees, Quality Assurance Manager "J. H. Liberman, QA Engineer R. J. Nicklaw, Receiving Inspection Supervisor F. L. McKey, Process Control Engineer
  • V. L. Monroe, Purchased Material Quality Control Manager A. W. Murray, Materiai Ordering and Control Supervisor V. W. Pence, Design engineer
  • 0. Starr, Equipment Quality Manager
  • J. M. Raynor, Inv2ntory Clerk K. Toussaint, Pu, chased Material Quality Control Engineer E. A. Schaefer, Chem Met Lab Engineer E. R. Teachey, Process Control Technician
  • E. L. Sherrill, ANI, (N.C. Department of Labor)
  • Denotes those attending the exit interview.

B.

Action on Previous Inscection Findings (Closed) Deviation (Report No. 80-02):

Nonconforming channels were not segerated and the Inspection Reports were not attached.

P&P 70-37 has been revised to ba accurate in the description of current practices.

An inspec-tion of the channels, plugs, spacers, and tubing in the FC0 building, identified no additional proble:ns.

(Closed) Open Item (Report No. 80-02):

General Electric was to fully document its justification on control of the chemistry requirements via visual standards on welded zirconium.

Quality Notice F-5-123, Revision 1 has been issued which addresses the above justification.

A review of the Quality Notice identified no further problem in this area.

C.

Procurement Controls 1.

Objectives The objectives of this area of the inspection were to verify that:

a.

The fuel fabricator's procurement activities are being imple-mented in accordance with the requirements of Criteria IV and

,3

--g.

g w

9,,,

m._-

.--,9

--w

.g

--7

.g ww y,

3 VII of 10 CFR 50, Appendix B or approved topical report as expanded and documented in his QA program and QA Manual (s).

b.

The fuel fabricator's procurement activities are being imple-mented in accordance with the requirements of ANSI N45.2, and ANSI N45.2.13 as appropriate and as documented in his QA program and manual (s) or approved topical report.

2.

Method of Accomolishment The preceding objectives were accomplished by:

a.

Reveiw of the Topical Report, BWR Quality Assurance Program Description, NED0-11209-04A, Sections 4, Procurement Document Control, and 7, Control of Purchased Material, Equipment and Services and the Wilmington Manufacturing Department Quality Assurance Program, NEDE-20586, Revision 7, Sections 6.4, Pro-curement Document Control and 6.7, Control of Purchased Material, Equipment and Services which establishes the general requirements.

b.

Review of the following Practice and Procedures (P/Ps) and Quality Assurance Section Administrative Routines (QASARs) which established the specific requirements:

Purchased Material Quality Control Planning, QASAR 320-40.7, Revision 1; ASME Code Quality Checklist, QASAR 320-50.2, Revision 2; Purchased Material Inspection Sampling Plans, QASAR 320-50.4, Revision 1; j

Quality Control Inspection Planning-EM, QASAR 320-100.4, Revision 2; l

Material List - EM, P/P60-1, Revision 6; 1

Manufacturing Material or Service Purchase Instructions, P/P 60-2, Revision 6; Preparation of Material Requests, P/P 60-6, Revision 6; Vendor Approval and Survey, P/P60-11, Revision 7; l

Vendor Qualification, P/P60-12, Revision 5; Vendor Document Control, P/P60-14, Revision 6; i

I 5

,,w-w, m

r-

~

re e

4 Source Inspection, P/P60-15, Revision 8; Vendor Quality Audits, P/P60-16, Revision 6; Purchase Order Deficiency Notice, F/P60-19, Revision 6; Vendor Nanconforming Material Report, P/P60-20, Revision 7; Supplier Corrective Action Request, P/P60-21, Revision 7; and Procurement Quality Requirement, P/P60-25, Revision 5.

c.

Review of the following Quality Inspection Standards and Quality Control Inspection instructions which established additional specific requirements:

QCII 767E632, Revision 2; QCII 167B2283, Revision 2; QCII 137CS311, Revision 6; Receiving Inspection Procedure and Routines, QIS, 119, Revision 8; Control of Safety Essential and ASME Code Material - Receiving Inspection, QIS,120, Revision 3; and Receiving Inspection Sampling Plans for Purchased Material, QIS, 167, Revision 3.

d.

Inspection of a sample of three lots of materials received recently of fuel supports, elbows and bar stock.

The inspection included verification of the Quality Plans, use of ASME check-list, vendor qualification, vendor approval and survey for the-above lots.

The inspection verified the use of the correct ASME edition and addendum, sampling plans, inspection code letter, and inspection classes.

The inspection verified the translation of engineering requirements from Material lists to Manufacturing Material or Services Purchase Instructions to Material Request to Purchase Orders.

The inspection verified the documentation of the sourc1 and receiving inspections, vendor's nonconformances, nonconforming materials identification, and the conformance to the purchase orders for the above lots.

I i

4-

,, - + -

4

,n--

y

-n, g.

m w

--s

5 3.

Findings a.

Nonconformance Material Requisition PS1215 was issued on February 1979.

The applicable Engineering Instructions was EI 120-3178 Revision 0, dated August 26, 1976.

This EI was referenced on the Material Requisition.

The Purchase Order which resulted from this Material Requisition, required the vendor to comply with the Summer 1977 Code.

The edition and addendum required by the Engineering Instruction was the Summer 1976.

The incorrect translation of the applicable edition and addendum is considered to be a nonconformance, however, there is no technical difference for the material procured between Summer 1976 and Summer 1977.

Inspection Report RB681 was issued at the end of this inspection to document this particular nonconformance.

Inspection Report RB681 was accepted by Design Engineering which is the corrective action on this nonconformance.

No response to the nonconformance in the area of corrective action is necessary.

(See Notice of Nonconformance).

b.

Unresolved Items None.

c.

Followuo Item Engineering Instructions, EI-120-3178, Revision G, had a hand-written note dated September 1979, identifying the edition and addendum to be used for a foreign project.

A follow up revision was to be issued to confirm this information.

This follow up revision has yet to be issued.

The modification of Engineering Instructions will be reviewed in detail during the next inspection.

l D.

Moisture and Hydrogen Controls j

1.

Objectives The objectives of this area of the inspection were to verify that:

i a.

Moisture and hydrogen control measures are sufficient to provide assurance that internal hydriding failures will not occur in service, and meets specifications and contractual requirements, b.

The moisture and hydrogen control and inspection techniques are qualified.

I s

i me p

9

6 2.

Method of Accomolishment The preceding objectives were accomplished by:

a.

Review of the Topical Report, BWR Quality Assurance Program Description, NED0-11209-04A, Sections 5, Instructions, Procedures, and Drawings; 10, Inspection; 14, Inspection, Test, and Jperating Status; and the Wilmington Manufacturing Department Quslity Assur-ance Program, NEDE-20666, Revision 7, Sections 6.5, Instruction, Procedures, and Drawings; 6.10, Inspection; 6.14, Inspection, Test, and Operating Status which establishes the general require-ments.

b.

Review of the following Practice and Procedures (P/Ps) and Quality Assurance Section Administrative Routines (QASARs) which estab-lished the specific requirements:

c.

Review of the following documents which established the specific requirements:

Qualification of Processes, P/P70-14, Revision 4; Qua:ity Assurance Planning System, P/r70-2, Revision 5; Quality Notices, QASAR 320.40.1, Revision 5; Drawing, Rod, Fuel (Basic), 12805505, Revision C; UO Fuel Rod Outgassing, P/PQR 4.0.4, Revision 17; 2

UO Fuel Rod Outgassing, QCII 4.2.4, Revision 11; 2

Fuel Rod Outgassing, QCOR 4.1.4, Revision 16; Determination of Hydrogen in UO and UO -Gd, 0, Pellets by 7

7 Inert Gas Fusion, 1.2.8.4, Revision 8T and QuaTity Notices, Q-798, Revision 13; Q-797, Revision 12, Q-799, Revision 14; Q-802, Revision 13 and Q-803, Revision 12.

d.

Inspection of the rod outgassing ovens in the UO, shop and verifi-cation of the above requirements.

This inspecti8n included the time at temperature of lots, hydrogen testing, documentation of lots, qualification of the process, and calibration instrumentation used in the above.

3.

Findings a.

Nonconformances None.

5 i

y 4

m m-g-

-,-te-2 e-

- - ~

7 b.

Unresolved Items None.

E.

Exit Interview The inspectors met with management representatives (denoted in paragraph A) at the conclusion of the inspection on February 20, 1981.

The inspector summarized the scope and findings of the inspection.

The management representatives had no comments in response to each item discussed by the inspector.