TELECOFY TO WUtC h-w 12.1980 7;
U.s. auclear Ema= -- Y ""4"'"
' ~
r Zegion II 101 Harietta Street, BW Suits 3100 A*1==*m, Georgia. 30303 N
squo-50-327/a01ss mayorted under raewe-=i specife-ei s.p.1.12.1 i
. Date of Occurrenca:
12/11/80 IIme of necurrence 1615 (c) i Techfemi Q--IF4
->4-Igyglygd E4.
I Coriditio-to Frior to Occurrence wrmfa 5. ECS pressure 300 pais and Tavg.178 Degrees F 1
Identificatios_and Description _of occurrence Notification was received that A=e*=r the IER 79-14 reyfew it was discovered thst The host transfer cavant inse=71=a in the area of pipa hangers far process pipirs cont =*=i== barated water coeld reamit in pipe at hsuger failure.
Whes installat, the cement is pliable and fills henger pipe cime2ces, when dry; the cement is very hard restricting any relative movement between pipe mai hasser.- Pipe stress could increase and/or support failure cos3d ramalr.
There were eleven safety-related hangers affected sa the SIS. CTC5, and waste disposal systems.
hpar m t Caase of Occurrenen The installation of heat tranafar ccaurnt was made without regard to the effect on pipe supports. There were no q& pr=-=d-w for the app 14e=Fean or control of this material.
. Other E-lated Events Ness l
corrective Action Taken or Planned The cement has been removed from piping in the vicinity of the hangers and Egorary inmalmf-ing material 1ASem1Tast as==*==mery.
~
Jere N. Br11=neina Planc Manalysr 5
ah ar Plant w - -,
p _E
} gt s_R L
8108060}4T 5