ML20037B530

From kanterella
Jump to navigation Jump to search
Requests Conceptual Design of Sys W/Reliable Coolant Supply & Onsite Power to Comply W/Interim Criteria.Submittal Should Include Detailed Justification for Departures from Current Stds of Reliability & Justification for Proposed Schedule
ML20037B530
Person / Time
Site: Dresden Constellation icon.png
Issue date: 12/22/1972
From: Skovholt D
US ATOMIC ENERGY COMMISSION (AEC)
To: Butterfield L
COMMONWEALTH EDISON CO.
References
NUDOCS 8010140658
Download: ML20037B530 (1)


Text

t to i

bec:

tli'. E L T2 AEC PDR Dachet File

.j Branch Reading l

RF Reading DJShovholt

. w.c. ;;a.

,,51.

ACR$ (16) q RO (3)

OGC DLZiemann l

TJCarter C :,:.=n. cdth Mi:,cn Coc:;icny RD$ilver Am!:

1*r. L. D. Butterfield Jr.

Nuclear Licensing A aInf=trator RMDiggs Post Office Box 767 4

Chicago, Illinois 60690 Y

centlemen:

i I

Uc hm e reviewed your letter dated l'ay 1,1972, concerni=p complicnce with tbs AEC Interim Acceptance Criteria for LCCS for Ercaden Unit 1.

Inc mnnlyses discussed in that letter are based on the cscu=ption that 1

the primary foedvatar system is available during a loss-of-cocient accident. Because of the lack of redundant, reliable onsite emergency j

power for the feedvater pumps and the apparent inchility to assure adequate coolant supply in the event of a break in the f eedwater licc.s.

this assumption cannot be considered valid. We thereforc request thct you subnit within 60 days of the date of this letter, a conceptual design of a system with reliable coolcat supply and oacite power to enable you to co= ply with the interin critcric. Uc cire regnect that your cub =ittal include an estic.ated time interval between the dcte of

+

AEC approvcl cf the conceptual design and the date of ccinittn1 of a dctciled design and analysis and an estimated ti.e interni Ectueen the date of AEC acceptance of a detailed design read the date of co=pleting the rodifications.

i Your submittal should include detailed justification for departures i

from current standards of ra11mbility and justification for your I

proposed schedule. The requested information should be subnitted with one signed original and thirty-nine mAdftional copies.

i Sinecrcly, Cric-1 q c Dc m ? :. l

.'l Donald J. Skovholt g

Assistant Director i

for Operating Reactors i-Directorate of Licensing cc: John V. Eose, Esquire

~..:._., I ':. : h ! L ech Counselors at Law I

' L:0R' L:0R p 0R, L:0R,,., o

~

can rir:t F tioncl Plc.:s

' ' 'Q j',.v-dT RDSilver:ru I"Di[g s : r.:

.0LZic ann DJSirvhcit r.

..___cw 6 w,. 7 0 c,

u -

w m,

12/';-; / 72 12/2 3/72 '

12/ 22/72

,12/H /7 c.y.

,_u:

, e Ar.cv..

-,.