Text
N T
[ma ser.$\\e, O'
UNITED STATES g
NUCLEAR REGULATORY COMMisslON "r
.g WASHING TON, D. C. 20555 s
1
%.'.~...f C0!iMONWEALTH EDI$0N COMPANY-AND I0i!A-ILLIN0IS GAS AND ELECTRIC COMPANY DOCKET NO 50-265 0UAD-CITIES NUCLEAR POWER STATION UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 42 Licanse No. DPR-30 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by the Commonwealth Edison Company (the licensee) dated December 6,1977, complies with the standards and requirements of the Atomic Energy Act of 1964, as amended (the Act), and the Commission's rules and regula; ions set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the -
common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
k 8009260 g y I
. 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.B of Facility License No. DPR-30 is hereby amended to read as follows:
B.
Technical Specifications The Technical Specifications contained in Appendices A. and B, as revised through Amendment No. 42, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY C0tif tISS10H J ';)
'SJ..,,
N N., N,, s DennisL.Ziemann) Chief-Operating Reactors Branch F2 Division of Operating Reactors
Attachment:
Changes to the Technical Specifications Date of Issuance: March 1,1978
?
s l'
e
ATTACHMENT TO LICENSE AMENDMENT NO. 42 FACILITY OPERATING LICENSE NO. DPR-30 DOCKET NO. 50-265 Replace the following existing pages of the Appendix A portion of the Technical Specifications with the attached revised pages.
Changed areas on the revised pages are shown by a marginal line.
Remove Pages Insert Pages 6.2-1 6.2-1 6.2-2 Delete 6.2-3 Delete 6.2-4 Delete 6.2-5 Delete 6.6-1 6.6-1 6.6-2 6.6-2
w.,..,..,, c.e
..s.
Opn-30 6: PLANT CPER.', TING PROCEDURES r:tten pic: dures including applicable checkoff lists covering items h:' 1 beira shall be p:epared, A.
Deta:!:d 4.,
appresed.:nj adhered to:
Norm:! st rn.p, operation, a:td shutdown of the teactor,.md other systems ::nd compecents imelving 1.
r.ae ::r 4.afety of the facility.
2.
Rcfueling cperations.
Ac: ions to be taken to correct speciGe and foreseen potential malfunctions of systems or cc:nponents in-3.
cluding respontes to alarms, suspected primary system leaks, and abnormal reretivity changes.
Emerpncy conditions involving potential or :ctual re!cate of radio 2:thity "Cen: rating St:tions 4
Emergency I".an" and station emergency and abnormal precedures.
5.
In::rurnent:: ion operation which could have an effect en the safety of the facility.
Proentive and corrective maintenance operationt which cou'd hwe an effcet ca the safety of the f:.cility.
6.
7.
Sur.edlance and testing requircinents.
5.
lests and ceperiments.
9.
Procedure to ensure safe shutdown of the pLmt.
10.
5::non Security Fian and implementation p20ccdurcs.
These Radr tion control precedure shall l': maintained, made availab!e to all station perrent:L 'rd adhwd to.
B.
- he re.p.
em> vi iG Ci'R O.
a pmcchres sh'il sho.v penniWhle i i hanon expos'uc and shall i c cons: stent wn !
R 20.
T!ns raJnn m protrenon t$tocr.uu sh Cl be orpnin:d to meet the requucr:ents ot 10 Ci dl be reviewed ineceaures for items i.!enoned in Sreeineation 6 2.A and :ny thanres to %h rrmedurcuh.
r f l and approved by the Operatm; I nemeer and the Technical Staf f Sapau or.: t!a was o C.
i.
handhng, er instrument maintenance, and by Mi.ntenance Engmeer and Techm J m Specincation 6.2.0 and creas of plant maintenance and plant inspection. Procedures for item: ijenun:
ff Sup:rviser and the any chen es to such procedures call be reviewed and approved by the T:&r.ieal Sta RadieL[:1 Chemicb St'p;rvisor. At least one per on apprev:ng e.:th of the a' ne p tica ulij tenior operator's hcene. In addition, thes: proccdures and changs theteto.must have aut by the St:tmn :W 'ermtendent before being imph mented.
..ork an3 mstruction type procedu cs w!uch impicincnt ::ppresed maiatenance cr modification pr :c la 2.
th: u rat:n authority h, teen ric.
.'lltr gprosed nd auther zed by the Maintenance 1 ngineer wher Med by the Station SuperintenJ nt. The "MaintenanceiWd:dcation P:occJ.ne" unhied s.fety.
e
- lecd m. k shid be to approved en!y if precedures referenceJ in the "M:inten:.seNoda'ation Pro-cedure" have been ppicsed as requircJ by 6.2.A. Precedures which Ca not fa'.! within the rcpircinants of12.A er 6.2.0 may be :pproved by th: Department II: ads.
Temporary chances to procedures 6.2. A and 6.2.B above may be made provided:
D.
1.
lhe intent of the ori;; mal procedure is not altered.
T1.e cF:n:e is approved by two members of the phnt management staff, at least one of whom 2.
5:m er P : tor Operate: s b:enx on th: unit affecied.
P. ch:n:e is documented, revkwed by the O. site Review and Inve;ti;athe Function and cp rc.cJ by 3
72 Fu c-Lyermtm:-t w:thm 14 Ja s cfin:7k. :.nt u a.
~
_r 7
':.ru - " -
- 244e
.,, p:
E D
-2ii s.ru courn of t.u yem cc.
anon F-
- e
..s.
-L
' 1 L:
....i
- ~;-..er..
g
QUAD-CITIES t
6.6 REPORTING REQUIREMENTS in addition to the applicable reporting requirements of Title 10. Cot e of Federal Regulations, the following identified rep:rts shall be submitted to the director of the approp:iate Regional Office of Inspection and Enforcement unless otherwise noted.
A.
Routine Reports
- l. Startup Report A summary report of plant startup and power escalation testing shall be submitted following (I) receipt of an operating license. (2) amendment to the license involving a planned increase in p:wcr level. (3) installation of fuel that has a different design or has been manufactured byla different fuel supplier, and (4) modifications that may have significantly altered the nuclear, l
thermal or hydraulic performance of the plant.The report shall address each of the tests identified in the SAR end shall in general include a description of the measured values of the onerating conditions or characteristics obtained during the test program and a cornparison of these values with design predictio: s and specifications. Any corrective actions that were required to obtain satisfactory operation shall aho be described. Any additional specific detaih required in license conditions based on other commitments shall be included in this report.
5:artup reports shall be submitted within (1) 90 days following completion of the startup test program. (2) 90 days following resumption or commencement of commerical power operation. or (3) 9 months following initial criticality. whichever is earliest. If the startup report doo not cover k
a!! three events (i.e., initial criticality. completion of startup test program, and resurnption or commencement of commercial power operation). supplementary reports shall be submitted at least every 3 months until all three events have been completed.
b
(
6.61 le :
y~,
't, Q
a QUAD-CITIES 2.
A tabulation shall be submitted on an annual basis of the.
number of station, utility, and other personnel (including contractors) receiving exposures greater than 100 mrem /yr and their awociated man tem exposure according to wark and job functions (Note: this tabulation supplements the requirements of Section 20.407 of 10 CFR 20). e.g.. reactor operations and surseillance, inservice inspectinn.
routine maintenance. special maintenance (describe maintenance). waste processing. and -
refueling. The dose auignments to various duty functions may he estimates based on pocket f
dosimeter. TLD. or film hadge measurements. Small expmures totaling less than 20% o. the -
individual total dose need not be accounted for. In the aggregate.at least 80% of the total whole body dose received from external sources shall be assigned to specific major wo L lunctions;
-(L and 3.
Monthly Operating Report Routine reports of operating statistics and shutdown experience shall be submitted on a monthly basis to the Director, Office of Management Information and-Program Control, US Nuclear Regulatory Co=ission, Washington, DC 20555, with a copy to the appropriate Regional Office, to arrive no later than the 15th of each nonth
[
~
following the calendar month covered by the report.
B.
Reportable Occurrences Reportable occurrences, including corrective actions and measures to pres ent recurrence. shall be reported to -
the NRC. In general, the importance of an occurrence with respect ic safety significance determines the immediacy of reporting required. In some cases however, the significar:ce of an event may not he obsious at the time ofits occurrence. In such cases the NRC shall be informed promptly of an increased signincance in the licensee's assessment of the event. In addition, supplemental reports may be required to fully describe 6nal resolution of the occurrence. In case of corrected or supplemental reports, a licensee' event report shall be completed and reference shall be made to the origin.el report date.
1.
Prompt Notifcation with Written Followup The types of events listed below shall be reported as expeditiously as possible. but within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by te!ephone and confirmed by telegraph. mai! cram.or facsirnile transmission to the director of the appropriate regional ofice or his designate no later than tne f.rst v orking day fcl lawing the event.
with a written followup repart wi hin -2 week The written followup report shal! :nclude. as a t
mh..nnm. a comp!cted copy of a
< nsee esent report form. :n rmation provided en :re i:ce :see ep:rt fare shu N wppict ented.n r eed b, addm m:' rurratise matend v. previde esen:
6.6 - 2 l E*.rer.t Id. U